1 UNITED STATES j
NUCLEAR REGULATORY COMMISSION l,p WASHINGTON, D.C. - aaa1 DETROIT EDISON COMPANY DOCKET NO. 50-341 FERMI 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 127 License No. NPF-43 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Detroit Edison Company (the licensee) dated September 25,1996, as supplemented by letters dated November 26, 1997, and March 10 and June 17,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonabis assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied, e
9808310008 980825 PDR ADOCK 05000341 P
e o,
.2 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-43 is hereby amended to read as follows:
Technical Specifications and Environmental Protection Pjan l
l The Technical Specifications contained in Appendix A, as revised through 1
Amendment No. 127, and the Environmental Protection Plan contained in
)
Appendix B, are hereby incorporated in the license. DECO shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance with full l
imp lementation within 90 days.
FOR THE NUCLEAR REGULATORY COMMISSION 6
)
c Andrew J. Kugler, Project Manager Project Directorate lll-1 Division of Reactor Projects - til/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications -
Date of issuance: August 25, 1998
y ATTACHMENTTO LICENSE AMENDMENT NO.127 FACILITY OPERATING LICENSE NO. NPF-43 DOCKET NO. 50-341 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
REMOVE M 8I 3/4 8-20 3/4 8-20 I
, ELECTRICAL POWER SYSTEMS MOTOR-0PERATED VALVES THERMAL OVERLOAD PROTECTION LIMITING-CONDITION FOR OPERATION 3.8.4.3 The thermal overload protection of each valve used in saf1ty systems shall be OPERABLE.
APPLICABILITY: Whenever the motor-operated valve is required to be OPERABLE.
ACTION:
With the thermal overload protection for one or more of the above required valves inoperable, continuously bypass the inoperable thermal overload within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or declare the affected valve (s) inoperable and apply the appropriate ACTION statement (s) for the affected system (s).
SURVEILLANCE REQUIREMENTS 4.8.4.3 The thermal overload protection for the above required valves shall
.be demonstrated OPERABLE-by the performance of a CHANNEL CALIBRATION of a j
representative sample of at least 25% of all. thermal overloads for the above
~
required valves at least once per 18 months, and by performance of a CHANNEL CALIBRATION of the affected thermal overload following any maintenance activity which could affect the performance of that thermal overload.
l l
FERMI - UNIT 2 3/4 8-20 Amendment No. JSJ, 127 L