[( 7,; -.
1 0
' August 26, 1998 e
h-I' Mr.~ Douglas R. Gipson Senior Vice President Nuclear Generation Detroit Edison Company r
6400 North Dixie Highway _
Newport, Michigan 48166
SUBJECT:
WITHDRAWAL OF AN AMENDMENT REQUEST FOR A ONE-TIME l
EXTENSION OF THE EMERGENCY DIESEL GENERATOR ALLOWED l
OUTAGE TIME - FERMI 2_(TAC NO. MA1426) -
Dear Mr. Gipson:
i' By letter dated April 3,1998, you applied for an amendment to Facility Operating License No.
I NPF-43 for the Fermi 2 facility. The proposed one-time change would have modified the facility
{
' technical specifications pertaining to emergency diesel generator allowed outage times.
Subsequently, by letter dated August 7,1998, you withdrew the amendment request.
1 The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to j
Facility Operating License with the Office of the Federal Register for publication.
o Sincerely, Original signed by:
Andrew J. Kugler, Project Manager Project Directorate 111-1 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket No. 50-341 L
Enclosure:
- Notice of Withdrawal cc w/ encl:.See next page
[h hk b DISTRIBUTION f
Docket File
~OGC
- PUBLIC ACRS PD31 r/f BBurgess, Rill (BLB) '
EAdensam, EGA1 E
- DOCUMENT NAME: G:\\WPDOCS\\ FERMI \\FE-A1426.Wil-l.
. To receive a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy with attachment / enclosure N = No copy h
' OFFICE PM:PD31 E-LA:PD31 -
(N A PD:PD31 E
l AKugler:db h CJamersonN CACarpenter ( h i
NAME DATE 08/ 2l /98 08/M /98 -
/
08/.2L /98 f
{
OFFICIAL RECORD COPY
~
4 9908290248 980826 PDR ADOCK 05000341 P
PDR 2
L 3
August 26, 1998 Mr. Douglas R. Gipson Senior Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166
SUBJECT:
WITHDRAWAL OF AN AMENDMENT REQUEST FOR A ONE-TIME EXTENSION OF THE EMERGENCY DIESEL GENERATOR ALLOWED OUTAGE TIME - FERMI 2 (TAC NO. MA1426)
Dear Mr. Gipson:
By letter dated April 3,1998, you applied for an amendment to Facility Operating License No.
NPF-43 for the Fermi 2 facility. The proposed one-time change would have modified the facility technical specifications pertaining to emergency diesel ger.erator allowed outage times.-
Subsequently, by letter dated August 7,1998, you withdrew the amendment request.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely, Original signed by:
Andrew J. Kugler, Project Manager Project Directorate ill-1 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket No. 50-341
Enclosure:
Notice of Withdrawal oc w/ encl: See next page DISTRIBUTION.
Docket File OGC PUBLIC ACRS PD31 r/f BBurgess, Rlli (BLB)
EAdensam, EGA1 i
DOCUMENT NAME: G:\\WPDOCS\\ FERMI \\FE-A1426.Wil Tn receive a copy of this document. indicate in the box C= Copy w/o attachment / enclosure E= Copy with attachment / enclosure N = No copy OFFICE.
PM:PD31 E
LA:PD31 (N A PD:PD31 E
AKuglerto h CJamersonW CACarpenter ( $
NAME DATE 08/ 2l /98 -
08/M /98 [/
08/.7L /98 OFFICIAL RECORD COPY l
I i
e__________-----.------__-
[1 acatuq s
k UNITED STATES p
f j
NUCLEAR REGULATORY COMMISSION a
WASHINGTON, D.C. 30086 0001 m
\\ * *,
/
August 26, 1998 Mr. Douglas R. Gipson Senior Vice President i
Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166
SUBJECT:
WITHDRAWAL OF AN AMENDMENT REQUEST FOR A ONE-TIME l
EXTENSION OF THE EMERGENCY DIESEL GENERATOR ALLOWED OUTAGE TIME - FERMI 2 (TAC NO. MA1426)
Dear Mr. Gipson:
By letter dated April 3,1998, you applied for an amendment to Facility Operating License No.
NPF-43 for the Fermi 2 facility. The proposed one-time change would have modified the facility technical specifications pertaining to emergency diesel generator allowed outage times.
Subsequently, by letter dated August 7,1998, you withdrew the amendment request.
I The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely, f-l Andrew J.
ugler, Project Manager Project Directorate 111-1 Division of Reactor Projects -lil/IV Office of Nuclear Reactor Regulation Docket No. 50 341
Enclosure:
Notice of Withdrawal cc w/ encl: See next page I
l L_-____---
~
Mr. Douglas R. Gipson Fermi 2 Detroit Edison Company cc:
John Flynn, Esquire Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr Blvd P. O. Box 30630 CPH Mailroom Lansing, Michigan 48909-8130 U.S. Nuclear Regulatory Commission Resident inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Emergency Management Division 963 South Raisinville
- Monroe, Michigan 48161 Regional Administrator, Region lll U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Norman K. Peterson Director, Nuclear Licensing Detroit Edison Company Fermi 2 - 280 TAC 6400 North Dixie Highway Newport, Michigan 48166 August 1997 l
--- --