ML20237D773

From kanterella
Jump to navigation Jump to search
Discusses Telcon of 980819 Between L Woods & M Murphy Re Arrangements for Administration of Licensing Exam During Wk of 990222.To Meet Schedule,Staff Should Furnish Exam Outlines by 981023
ML20237D773
Person / Time
Site: River Bend 
Issue date: 08/24/1998
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Edington R
ENTERGY OPERATIONS, INC.
References
50-458-99-301, NUDOCS 9808270215
Download: ML20237D773 (5)


Text

_-_--

e mov

+

UNITED STATES s^

[

p, NUCLEAR REGULATORY COMMISSION E

j nEGION IV g

611 RYAN PLAZA DRIVE, SUITE 400

%,*****,d ARUNGTON, TEXAS 76011-8064 AUG 14 W R. K. Edington, Vice President - Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220

/

St. Francisville, Louisiana 70775

SUBJECT:

INITIAL EXAMINATION - NRC INSPECTION REPORT 50-458/99-301 1

Dear Mr. Edington:

In a telephone conversation on August 19,19L3, between Mr. Leonard Woods, Supervisor, i

Training Standards, and Mr. Michael Murphy, Chief Examiner, arrangements were made for the administration of licensing examinations at River Bend Station, during the week of February 22, 1999.

As agreed during the telephone conversation, your staff will prepare the examinations based on l

the guidelines in interim Revision 8, of NUREG-1021, ' Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by October 23,1998. The written examinations, operating tests, and the supporting i

reference materials identified in Attachment 2 of ES-201 and as discussed with the chief examiner, will be due by December 24,1998. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. A validation of the final examination material will be conducted at your facility the week of January 25,1999.

In order to conduct the requested written examinations and operating tests, it will be necessary j

for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, j

- temperatures, and levels) generated during the dynamic operating tests until the examination I

l results ar'e final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in g

f effect while the written examinations and operating tests are being administered.

i To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget I

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

. m. n. 4 e 9808270215 990824 8

PDR ADOCK 05000458 f

V PDR c -

___________-__-___m

e Entergy Operations, Inc. DISTRIBUTION:dd DCD (1E07)

Regional Administrator RB Resident inspector DRS Director DRS Deputy Director DRP Director Branch Chief (DRP/C)

Project Engineer (DRP/C)

Branch Chief (DRP/TSS)

DRS-PSB L. Hurley, Licensing Assistant (DRS/OB)

R. Gallo (NRR/HOHB)MS9D4 MIS RIV File t

(

DOCUMENT NAME: G:\\DRSLTRS\\RB9301LT,MEM To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

(

RIV:RI:OB 4,Es C:DRS\\OBl #E l

l t(

MEMurphy/imb//f/

JLPollet g 08/Ji/98 08f '98 '

i'

\\

OFFICIAL RECORD COPY 1(

h

d i

i Entergy Operations, Inc. <

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date, if the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has f

been completed should be submitted at least 14 days before the first examination date.

1 This letter contains information collections that are subject to the Papemork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1 @NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Woods has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Michael Murphy at 817-860-8152, or Mr. John Pellet at 817-860-8159.

Sincerely, 44ame John L. Pellet, Chief Operations Branch Division of Reactor Safety Docket No.: 50-458 License No.:NPF-47 cc:

Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Cox 31995 Jackson, Mississippi 39286-1995 1

Entergy Operations, Inc. Vice President.

Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995

~ General Manager Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety.-

River Bend Station Entergy Operations, Inc.

- P.O. Box 220 St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway.

P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

Winston & Strawn 1401 L Street, N.W.

Washington, D.C. 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub Attomey General i

Departrnent of Justice State of Louisiana P.O. Box 94005 Baton Rouge, Louisiana 70804-9005 H. Anne Plettinger l

3456 Villa Rose Drive Baton Rouge, Louisiana 70806 4

1

- Entergy Operations, Inc. President of West Feliciana Police Jury

' P.O. Box 1921 St. Francisville, Louisiana 70775 William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 I

t-t

..