7590-01-P l
UNITED STATES NUCLEAR REGULATORY COMMISSIQN ILLINDIS POWER COMPANY CLINTON POWER STATION. UNIT I DOCKET NO. 50-461 NOTICE OF PARTIAL DENIAL OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR HEARING The U.S. Nuclear Regulatory Comission (the Commission) hes partially denied a request by Illinois Power Coy any (the licensee) to amend Facility Operating Licenss NPF-62 issued to the licensee for operation of the Clinton Power Station, Unit 1, located in DeWitt County, Illinois.
Notice of Consideration of Issuance of the amendment was published in the FEDERAL REGISTER on December 20, 1995 (60 FR 65681).
The purpose of the licensee's amendment request was to revise Technical Specification -(TS) 5.2.2.e, " Unit Staff," by revising.the requirements for controls on the working hours of unit staff who perform safety related functions and by removing the requirement for monthly review of individual overtime.
The proposeu changes were denied in part. The licensee's request to remove the monthly review of individual overtime requirement was denied because this removal would result in working hours controls that would not be sufficient to assure that adequate shift coverage is maintained without routine heavy use of overtime.
The NRC staff has concluded that part of the licensee's request cannot be granted. The licensee was notified of the Comission's partial denial of the proposed change by letter dated August 13, 1998.
9808270172 980813 f
PDR ADOCK 05000461 P
PM l
l W???!1h
__ L_
~
, S By eptember 21, 1998, the licensee may demand a hearing with respect to the partial denial described above. Any person whose interest may be affected by this proceeding may file a written petition for leave to intervene. A request for hearing or petition for leave to intervene must be filed with the Secretary of the Comission, U.S. Nuclear Regulatory Comission, Washington, DC 20555, Attention:
Rulemakings and Adjudications Staff, or may be delivered to the Comission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, by the above date.
A copy of any petition should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Comission, Washington, DC 20555, and to Leah Manning Stetzner, Vice President, General Counsel, and Corporate Secretary, 500 South 27th Street, Decatur, IL 62525, attorney for the licensee.
For further details with respect to this action, see (1) the application for amendment dated October 27,1995, and (2) the Comission's letter to the licensee dated August 13, 1998.
These documents are available for public inspection at the Comission's Public Document Room and at the local public document room located at the Vespasian Warner Public Library,120 West Johnson Street, Clinton, IL 61727.
Dated at Rockville, Maryland, this 13th day of August 1998.
FOR THE NUCLEAR REGULATORY COMMISSION j.
A-on B. Hopkins, Senion Project Manager roject Directorate III-3 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation
_p_
e -.
e By September 21,1999 the licensee may demand a hearing with respect to the partial denial described above. Any person whose interest may be affected by this proceeding may file a written petition for leave to intervene. A request for hearing or petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention:
Rulemakings and Adjudications Staff, or may be delivered to the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, by the above date.
A copy of any petition should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and to Leah Manning Stetzner, '.' ice President, General Counsel, and Corporate Secretary, 500 South 27th Street, Decatur, IL 62525, attorney for the licensee.
For further details with respect to this action, see (1) the application for amendment dated October 27, 1995, and (2) the Commission's letter to the licensee dated August 13, 1998.
These documents are available for public inspection at the Commission's i
Public Document Room and at the local public document room located at the l
)
Vespasian Warner Public Library,120 West Johnson Street, Clinton, IL 61727.
Dated at Rockville, Maryland, this 13th day of August 1998.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by:
Jon B. Hopkins, Senior Project Manager Project Directorate III-3 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation DISTRIBUTION:
Docket File PD3-3 R/F RBellamy l
OGC l
i DOCUMENT NAME:
G:\\CLINTON\\CL93993. DEN l
- See previous concurrence
\\
/
OFFICE LA:PD33 4 PM:PD33
& PM:PD33lC 0(C [/
NAME EBarnhil19D AHansength JHopkink V
DATE 4/24/d
//77/6Y
' /M / NI
// \\/