Forwards Insp Repts 50-254/98-12 & 50-265/98-12 on 980529- 980529-0716 & Nov.Violation of Concern Because Operators Failed to Follow Surveillance Procedures for Operating EDG, Despite Measures Put Into Place
ML20237D660
Person / Time
Site: Quad Cities  
Issue date: 08/11/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20237D662 List:
References
50-254-98-12, 50-265-98-12, EA-98-388, NUDOCS 9808270118
Download: ML20237D660 (4)


See also: IR 05000254/1998012

Text

.

i

U

E870

UNITED STATES

9'o

NUCLEAR REGULATORY COMMISSION

' M,

g

o

REGION lil

g

a

801 WARRENVILLE ROAD

g

!

LISLE. ILLINOIS 60532-4351

\\,,/

August 11, 1998

EA 98-388

Mr. Oliver D. Kingsley

President, Nuclear Generation Group .

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West 111

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT:

QUAD CITIES INSPECTION REPORT 50-254/98012(DRP); 50-265/98012(DRP)

AND NOTICE OF VIOLATION

l

' '

Dear Mr. Kingsley:

This refers to the inspection conducted May 29 through July 16,1998, at the Quad Cities Nuclear

Power Station. The purpose of the inspection was to determine whether activities authorized by

the license were conducted safely and in accordance with NRC requirements. The NRC

conducted routine resident inspections in this period. Based on the inspectors' findings, overall

conduct of operations at the Quad Cities station was safe. At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the enclosed ryort.

During the period, operators were challenged by a large number of equipment failures. Although

operators responded appropriately in most cases, these failures diverted operator attention and

in some cases caused transients or entry into Technical Specification limiting conditions for

operation. A conceriod effort to correct material condition discrepancies should continue to be a

priority at Quad Cities.- Further, a number of lower level human performance errors in the

application of processes at Quad Cities occurred during this period and are worthy of

management attention.

Based on these and other findings of this inspection, the NRC has determined that four violations

l

of NRC requirements occurred. The violations are cited in the enclosed Notice of Violation

L

(Notice) and the circumstances surrounding them are described in detail in the subject inspection

report;

The first violation was of concem because operators failed to follow surveillance procedures for

y

!

operating an emergency diesel generator, despite measures put into place specifically to prevent

/.

such errors. The second violation was of concem because relays associated with the

emergency diesel generators were not adequately evaluated for operation in adverse operating

/

environments. The third violation involved a failure to follow station procedures for setpoint

changes to safety equipment. The fourth violation was related to the failure to evaluate a change

in calculated minimum voltages for safety equipment described in the Updated Fina! Safety

Analysis Report.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance with regulatory

' requirements.

9908270118 990811

F

PDR

ADOCK 05000254

G

PM

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _

_

_ _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ - _

.

.

O. Kingsley

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

/s/ Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.: 50-254;50-265

License Nos.: DPR 29; DPR-30

Enclosures:

1.

Notice of Violation

2.

Inspection Report 50-254/98012(DRP);

50-265/98012(DRP)

i

cc w/encls:

M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

1. Johnson, Licensing Director

DCD - Licensing

J. Dimmette, Jr., Site Vice President

W. Pearce, Quad Cities Station Manager

C. Peterson, Regulatory Affairs Manager

R. Hubbard

N. Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

,

W. Leech, Manager of Nuclear

I

MidAmerican Energy Company

i

DOCUMENT NAME: G:\\ QUAD \\QUA98012.DRP

To receive a copy of this document, indicate in the box "C" = Copy without attachment / enclosure

' *E" = Copy with attachment / enclosure "N" = No copy

OFFICE

Rlli

_

G

Rlll

_

l E. Rlli

ld

Rlli

NAME

Lerch/ml//ff:kl

Rin #

Gardner {&Y

Grant @h

i

DATE

08/(/98

08/4/98

08/5/98'

08/W/98} ()

OFFICIAL RECORD COPY

!

,

r

-

.

-

O. Kingsley

-2-

-In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

y

M

&

,

offrey E. G

, Dire of)

Division of Reactor Projects

l

Enclosures:

1.

Notice of Violation

2.

Inspection Report 50-254/98012(DRP);

50-265/98012(DRP)

Docket Nos.: 50-254;50-265

License Nos.: DPR-29; DPR-30

cc w/encls:

M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

I. Johnson, Licensing Director

DCD - Licensing

J. Dimmette, Jr., Site Vice President

W. Pearce, Quad Cities Station Manager

C. Peterson, Regulatory Affairs Manager

R. Hubbard

N. Schloss, Economist

Office of the Attomey General

State Liaison Officer

Chairman, Illinois Commerce

Commission

W. Leech, Manager of Nuclear

MidAmerican Energy Company

l

<

l

--

--- -----

_- - - - - -

- -

- - - -

- - -

- - -

A

_-________-______ _ _ _ _ _ _

.

0

O. Kingsley

-3-

Distribution:

J. Lieberman, OE w/encls

'J. Goldberg, OGC w/encls

B. Boger, NRR w/encls -

- SAR (E-Mail)

Project Mgr., NRR w/encls

J. Caldwell, Rlll w/encls .

i

C. Pederson, Rlli w/encls

j

B. Clayton, Rlll w/encls

SRI Quad Cities w/encls

DRP w/encls

TSS w/encls

DRS (2) w/encls

Rlli PRR w/encls .

PUBLIC IE-01 w/encls

Docket File w/encis

GREENS

LEO (E-Mail) -

DOCDESK (E-Mail)

OE

i-

I

l

l

L

l

l

!

l

2700G9

!

i

_;