Text
_ - - _ _ _. _.
1 Environm:ntrl Restoration Division Albuqu:rqu3 Operatior s Office ERD /UMTRA P.O. Box 5400 Albucluer.que, NM 87185-6400
SUBJECT:
FINAL COMPLETION REVIEW REPORT FOR THE SLICK ROCK, COLORADO, URANIUM MILL TAILINGS REMEDIAL ACTION PROJECT SITES
Dear Mr. Rael:
The U.S. Nuclear Regulatory Commission staff has completed its review of the U.S. Department of Energy's (DOE) Final Completion Report and associated documents pertinent to the Uranium Mill Tailings Remedial Action Project inactive uranium mill tailings site at Stick Rock, Colorado.
These documents include revisions dated May 2,1998, and revised Completion Report pages transmitted on August 17,1998.
1 The NRC staff's review is documented in the enclosed final Completion Review Report (Enclosure 1) which discusses the staffs evaluation of the completed remedial action at the Rifle site against the requirements in the previously approved Remedial Action Plan and the Remedial Action inspection Plan. Based on its review, the NRC staff concurs that DOE has performed remedial action at the Slick Rock sites in accordance with the approved plans and specifications with the exception of the selection and performance of groundwater cleanup program. DOE with NRC approval, has deferred this aspect of the remedial action to a separate groundwater restoration program. I have therefore signed and enclosed the DOE Certification Summary (Enclosure 2) signifying concurrence in completion of the Slick Rock remedial action.
If you have any questions concerning this letter or the enclosed CRR, please contact the NRC Project Manager, Charlotte Abrams at (301) 415 5808, or her alternate for this action, Janet Lambert, at (301) 415-6710.
Sincerely,
[D. Gillen for]
Joseph J. Holonich, Chief Uranium Recovery Branch Division of Waste Management i
Office of Nuchar Material Safety 4
and Safeguards
]h
\\
l
Enclosures:
As stated cc: W. Woodworth, DOE Alb F. Bosiljevac, DOE Alb y -7h E. Artiglia, TAC Alb DISTRIBUTION: w/ Encl.:
FileCenter NMSS r/f URB rif PUBLIC BSpitzberg ACNW CNWRA DSchmidt TJohns7n BJaganath w/o Encl.
MWeber CAbrams MLayton DOCUMENT NAME: s.\\DWM\\ URB \\jal\\sikCRR-b N
URB Q /.,-
URB Q [y OFC URB _ l JLambk DGille JHoloN b NAME 8A49h b
8F/98 fl 8h98 DATE 9808260197 980824 og
,7m
[86 hh PDR l
u__________-_
l pn Ie49 g
UNITED STATES 4
g j
NUCLEAR REGULATORY COMMISSION 4
WASHINGTON, D.C. 20%H001 u d. *. '
August 24, 1998 Mr. George Rael, Director Environmental Restoration Division Albuquerque Operations Office ERD /UMTRA P.O. Box 5400 Albuquerque, NM 87185-5400
SUBJECT:
FINAL COMPLETION REVIEW REPORT FOR THE SLICK ROCK, COLORADO, URANIUM MILL TAILINGS REMEDIAL ACTION PROJECT SITES
Dear Mr. Rael:
The U.S. Nuclear Regulatory Commission staff has completed its review of the U.S. Department of Energy's (DOE) Final Completion Report and associated documents pertinent to the Uranium Mill Tailings Remedial Action Project inactive uranium mill tailings site at Slick Rock, Colorado.
These documents include revisions dated May 2,1998, and revised Completion Report pages transmitted on August 17,1998.
The NRC staff's review is documented in the enclosed final Completion Review Report (Enclosure 1) which discusses the staff's evaluation of the completed remedial action at the Rifle site against the requirements in the previously approved Remedial Action Plan and the Remedial Action inspection Plan. Based on its review, the NRC staff concurs that DOE has performed remedial action at the Slick Rock sites in accordance with the approved plans and specifications with the exception of the selection and performance of groundwater cleanup program. DOE with NRC approval, has deferred this aspect of the remedial action to a separate groundwater restoration program. I have therefore signed and enclosed the DOE Certification Summary (Enclosure 2) signifying concurrence in completion of the Slick Rock remedial action.
If you have any questions concerning this letter or the enclosed CRR, please contact the NRC Project Manager, Charlotte Abrams at (301) 415-5808, or her alternate for this action, Janet Lambert, at (301) 415-6710.
- cerely, A6A g n.
Joseph J. Holonich, Chief i
Uranium Recovery Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards