Forwards Insp Rept 50-346/98-12 on 980624-29.No Violations Noted.Insp Conducted After Notification That Tornado Touched Down at Plant.Review of Damage Caused by Tornado & Equipment Problems Identified & Prioritized
ML20237D036
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/14/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20237D037 List:
References
50-346-98-12, NUDOCS 9808250002
Download: ML20237D036 (3)


See also: IR 05000346/1998012

Text

_

_-

- - - _ _ _ _ _ - _ - - - _ _

9

4 "800

UNITED STATES

9'o

NUCLEAR REGULATORY COMMISSION

.

g

n

REGION lil

5

y

801 WARRENVILLE ROAD

'"

LISLE, ILLINOIS 60532-4351

k ***. ,/

August 14,1998

Mr. John K Wood

Vice President - Nuclear

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State Route 2

Oak Harbor, OH 43449

SUBJECT:

NRC TEAM INSPECTION REPORT 50-346/98012(DRP)

Dear Mr. Wood:

On June 29,1998, the NRC completed a team inspection which was initiated on June 24, shortly

after the NRC was notified a tomado had touched down at the Davis-Besse Nuclear Power

Station. The team followed the direction in NRC Inspection Manual Chapter 0350, " Staff

Guidance for Restart Approval," which provides guidelines for approving restart of a nuclear

power plant after an involuntary shutdown as a result of a significant event. A restart panel was

formed, which included members from NRC Region ill and the Office of Nuclear Reactor

Regulation, a restart plan was generated, and a list of issues needing resolution prior to plant

restart was developed. The NRC did not issue an Order or a Confirmatory Action Letter

conceming restart of the plant.

The conduct cf activities during the event was characterized by conservative operator actions.

The control room operators executed their responsibilities in a professional, business-like

manner. The operators anticipated the loss of offsite electrical power and ensured that the

equipment needed to place the reactor in a safe condition was operating. The crew's response

to the event indicated that they were well-trained for such an event. In addition, the effectiveness

and teamwork displayed by your emergency response organization indicated that they were also

well-prepared for the event.

A thorough review of the damage caused by the tomado and equipment problems was

conducted by your staff. The identified problems were properly prioritized and a methodical effort

ensued to resolve the issues. At no time did it appear that workers were schedule-driven, and

plant management continuously emphasized that proper resolution of the identified issues was

needed prior to considering restart of the unit. All restart issues that were identified by your staff

and the NRC were property addressed prior to plant management's decision to proceed with unit

restart.

r

9808250002 980814

PDR

ADOCK 05000346

G

PDR

_ _ _ _ _ _ _ _ _

.

!

1

.

i

l

J. Wood

-2-

l

{

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

I

Sincerely,

I

l

Original signed by M. Dapas

j

!

Geoffrey E. Grant, Director

i

Division of Reactor Projects

j

l

Docket No.: 50-346

License No.: NPF-3

Enclosure:

Inspection Report 50-346/98012(DRP)

cc w/ encl:

J. Stetz, Senior Vice President - Nuclear

J. Lash, Plant Manager

J. Freels, Manager, Regulatory Affairs

M. O'Reilly, FirstEnergy

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, State of Ohio Public

j

Utilities Commission

'

DOCUMENT NAME: G:\\DAVl\\DAV98012.DRP

To receive a copy of thee encuenent, 6ndiente in the bow c" = copy wtmout attachsenci E = Copy with attachtenci *N" = No copp

h

OFFICE

Rill

[

Rlll

Rill

NAME

Kozak:co h

Gardner b

Grantf4

dr

1

I

DATE

08//3/98

08/13/98

08//ff98

'

i

OFFICIAL RECORD COPY

l

F

o

?

A

.

J. Wood

3

I

Distnbution-

Project Mgr., NRR w/enci

J. Caldwell, Rlli w/enci

C. Pederson, Rlll w/enci

B. Clayton, Rlli w/enci

!

SRI Davis-Besse w/enci

-

DRP w/enci

~

TSS w/enci

'

DRS (2) w/ enc!

Rlli PRR w/enct

PUBLIC IE-01 'w/ encl

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

?

,

i

\\

.' 4 0 0 0 C

l