ML20237C608
| ML20237C608 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/14/1987 |
| From: | Gridley R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8712220023 | |
| Download: ML20237C608 (3) | |
Text
___
[.
6 TENNESSEE VALLEY AUTHORITY CH ATTANOOGA, TENNESSEE 37401 SN 157B Lookout Place DH6141987 q
I U.S. Nuclear. Regulatory Conunission ATTN:
Document Control Desk' Washington, D.C.
20555 Gentlemen:
~ "
')
In the Matter of the-
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328-
.SEQUOYAH NUCLEAR PLANT (SQN)i UNITS 1 AND 2 ~< FINAL SAFETY ANALYSIS Nfd)'tT U (FSAR) UPDATES - SUPPLEMENTAL RESPONSE
+
Enclosed is a supplemental response that provides additional informat)on about FSAR corrective actions. This supplements my response to Violation 5d 327,
-328/87 in a letter from me dated October 26, 1987.
Should you have any' questions concerning this matter, please telephone Larry Parscale at (615) 751-4939.
Very truly yours,
. TENNESSEE VALLEY AUTHORITY i
l R. Gridley, Director Nuclear Licensing and Regulatory Affairs
- )
(.
l Enclosure
'[g, '
cc: See page 2 y
8712220023 871214
{DR ADOCK 05000327 l
O Y)m
.PDR 1
1 An Equal Opportunity Employer
,'p t
- g Q[t
.,k..
/
4 f
g DEG 141987 U.S. Nucle &W Regulatory Commission
,s, s
o P'
rs i.
)
cc (Enclosure):
}'
Mr. K. P. Barr, Acting Assistant Director for Inspector Programs TVA Projects Division Office of Special Projects U.S. Nuclear Regulatory Commission p
('
Region Il
\\
f
.[6 101 Marietta htreet, NW, Suite 79M ef~
\\
Atlanta, Georgia 30323 t
. t-
,72. C. G. Zech, Assistant Director f or Projects 4
' ' 1V,A Projects Division
~
I i Office of Special Projects L
g n (':
i(
U.S. Nuclear Regulatory Commission 4350 East-West Highway r
Eid 322
's Bethesda, Maryland 20814
/
g
)
i sequoyah Nuc1 car Resident bnspector i
(
,;!{
(*
Sequoyah Nuclear Plant g
gt 2600 Igou Ferry Road c{ k Soddy Daisy, Tennessee 37379 r-I
/
s.
.'k.
p I
s V
u 4
i f
v s
s r
j. ',
c
}
t i
\\
/
f 4
f i
\\,g ^
L k
J' t.
l i
}
I 6
r
- -------------- o
,,V Y
- r i,
.i,L-c' f
1.
f-t I
v O]
<v ENCLOSURE SUPPLEMENTAL INFORMATION l
- 3 REGARDING FSAR CORRECTIVE ACTIONS
'th li,.
3
+
~ TVA's origino.1 response provida61 schedule guidelines for commitments in developtaent of.the now FSAR Update Program. These guidelinen/have been re.*Laad as follows:
e s,
h},
t Pd[SE 2 MILESTONES
'!!CF EDULE GUIDELINES Js
' i T-Preparat!ca(of Sequoynh Nuclear Plant Completed
~,
(SQN) 'fito iftecedure t
An Offico of Nuclear Tctror (ORP) G64ndard on the b$fR opdate program has been
. draftsC and was issued for ONP peer review.
As a recult, this standard is now
'bolpg revised in assorddnce with cofazents received. This otandard is being
). l devejoped and will be issued 'in accoidance with the icng-tmem ONP Nuclear Procedures System as described in Volume 1 of TVA's Nuclon? Performance Plan.
V ;'
The need for related divisional procedures (and their corresponding schedule) will be determined followlag issuance of the standard.
,9 1
I The irddrmation provided bf' this ' supplemental response supersedes commitments regerQIdg this subject in a lettee to J. Nelson Grace from J. A. Domer dated
- (
Februsry 3,1987 and a supplecqntal response to violation 50-327, -328/87-42 in-a letter from R. L. Gridley'to NRC dated October 26, 1987.
.y
.i
.e.
J f
f 4
ww"
(
IE i