Mr. J. H. Mill::r
. August.20, 1998
,Vice President - Production 3
United St:tr.s Enrichm3nt Corporation
(*
' Two Democracy Center -
6903 Rockledge Drive.
Bethesda, MD. 20817.
SUBJECT:
RESPONSE TO INSPECTION REPORT 70-7002/98-206 l
Dear Mr. Miller:
This refers to your June 30,1998, response to the Notice of Violation (NOV) transmitted to i you with inspection Report 70-7002/90-206, dated June 2,1998. We have reviewed your i
response to the NOV and determined that it meets the requirements of 10 CFR 2.201. In l
.your response, you acknowledged the cited violations, 98-206-02, 98-206-03, and l
98-206-05. However, we find that your response to Violation 98-206-03 is incomplete in i
that, no discussion was given as to why corrective actions for a previous similar violation
- (re
- 70-7002/97-206-06) were not effective in preventing occurrence of Violation 98-206-03.
Altncugh Violation 97-206-06 did not specifically mention the equipment associated with l
Violation 98-200-03, failure to consider other similar areas where Violation 97-206-06 would apply resulted in inad%este corrective actions, Therefore, you are required to respond to this letter and should fosm the same instructions specified in the original Notice when preparing your response.
We have reviewed your corrective actions for the remaining cited violations and have no further questions at this time..Your corrective actions will be examined during future l
inspections.
in accordance with the requirements of 10 CFR 2.790, a copy of this letter will be placed in the Public Document Room. Should you have any questions conceming this letter. please contact Jack Davis of my staff at (301) 415-7256.
l Original signed by Philip Ting
- Philip Ting, Chief Operations Branch Division of Fuel Cycle Safety Docket No. 7002
/
cc: J.M. Brown, Portsmouth Genera! Manager
)
7 D.B. Waters, Acting Manager, Portsmouth Regulatory Affairs H. Pulley, Paducah General Manager S.A. Toelle, Manager, Nuclear Regulatory Assurance and Policy, USEC T,D.' Reidinger, Acting Fuel Cycle Branch Chief, DNMS, Rill Portsmouth Resident inspector Office 1
g y.
Paducah Resident inspector Office I
h W ;" b $sd M..
n l
DISTRIBUTION:
>bVUd Docket File 70-7002 FCOB r/f DMorey, FCOB NMSS r/f
. PDR, LPDR FCSS r/f PHarich, FCOB YFaraz, SPB DOCUMENT NAME Wute Disk)98-206 Itr OFC FCOB
(
FCOB k
FCOB FCOB FCOB WTroskosI PTing[
NAME JOavis abA' 3oggs N
tuva hfO
)RD COPY
. N = NO COPY -
002 C
-e
- ""'%,k UNITED STATES ae 4
s-
,g NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20565 4001
\\*****/
August 20, 1998 Mr. J. H. Miller
=
Vice President - Production United States Enrichment Corporation Two Democracy Center 6903 Rockledge Drive Bethesda, MD 20817
SUBJECT:
RESPONSE TO INSPECTION REPORT 70-7002/98-206
Dear Mr. Miller:
This refers to your June 30,1998, response to the Notice of Violation (NOV) transmitted to you with inspection Report 70-7002/98-206, dated June 2,1998. We have reviewed your response to the NOV and determined that it meets the requirements of 10 CFR 2.201. In your response, you acknowledged the cited violations,98-206-02,98-206-03, and 98-206-05. However, we find that your response to Violation 98-206-03 is incomplete in that, no discussion was given as to why corrective actions for a previous similar violation (re: 70-7002/97-206-06) were not effective in preventing occurrence of Violation 98-206-03.
Although Violation 97-206-06 did not specifically mention the equipment associated with Violation 98-206-03, failure to consider other similar areas where Violation 97-206-06 would apply resulted in inadequate corrective actions. Therefore, you are required to respond to this letter and should follow the same instructions specified in the original Notice when preparing your response.
We have reviewed your corrective actions for the remaining cited violations and have no further questions at this time. Your corrective actions will be examined during future inspections.
l In accordance with the requirements of 10 CFR 2.790, a copy of this letter will be placed in the Public Document Room. Should you have any questions concerning this letter, please contact Jack Davis of my staff at (301) 415-7256.
Sincere Philip Ting, Chief )
M Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-7002 t
)
cc: J.M. Brown, Portsmouth Ger,eral Manager D.B. Waters, Acting Manager, Portsmouth Regulatory Affairs H. Pulley, Paducah Genera Manager S.A. Toelle, Manager, Nuclea r Regulatory Assurance and Policy, USEC l
T.D. Reidinger, Acting ^r,ie' Cycle Branch Chief, DNMS, Rlll L
.Portsmouth Resident F specter Office Paducah Resident inspector Office