ML20237B751

From kanterella
Jump to navigation Jump to search
Forwards Pmpr 98-11, CNWRA Program Managers Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 980704- 31.Diskette Containing Pmpr in Wordperfect 8 Format Also Encl
ML20237B751
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/14/1998
From: Patrick W
CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES
To: Linehan J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20237B753 List:
References
CON-FIN-D-1035, CON-FIN-J-5164, CON-FIN-J-5186, CON-FIN-J-5206, CON-FIN-J-5210, CON-FIN-J-5226, CON-NRC-02-97-009, CON-NRC-2-97-9, REF-WM-11 HLWR, NUDOCS 9808190229
Download: ML20237B751 (1)


Text

-

1 i

Center for Nuclear Waste Regulatory Analyses 6220 CULEBRA ROAD e P.O. DRAWER 28510

  • SAN ANTONIO, TEXAS. U.S.A. 782284510 (210) 522 5160
  • F/4 (210) 522-5155 August 14,1998 Contract No. NRC-02-97-009 Account No. 20-1402-158 U.S. Nuclear Regulatory Commission Attn: Mr. John J. Linehan, Director Office of Nuclear Material Safety and Safeguards i

Program Management, Policy Development and Analysis Staff l

Mail Stop 8-A23 Washington, DC 20555

Subject:

CNWRA Program Manager's Periodic Report on Activities of the Center for Nuclear Waste Regulatory Analyses for Period Il-FY98 i

l

Dear Mr. Linehan:

The attached Program Manager's Periodic Report" (PMPR) documents the progress and financial status of the Center for Nuclear Waste Regulatory Analyses (CNWRA) for the period July 4-31,1998. Its contents comply with the requirements of section F.1.5. of the referenced contract. A diskette containing the PMPR in Wordperfect 8 format is also enclosed.

Cost variance analyses are provided for the Division of Waste Management (D1035), Tank Waste Remediation System (15164), Three Mile Island Unit 2 Independent Spent Fuel Storage Installation (J5186),

Dry Transfer System (J5206), Centralized Interim Storage Facility (D1035), Private Fuel Storage Facility (J5226), and Savannah River Site Aluminum-Based Spent Fuel (15210) Job Codes (JCs), as well as for composite spending on this contract. All variances are expressed with regard to the current operations plans.

i During period 11, seven schedule changes were made as reflected in table 2. Four deliverables were transmitted as indicated in table 3.

l Please contact jne or Mr. Henry Garcia if you have glestions regarding this r port.

/

1//

Sincercly 'o if

/

,J Wesley C. P'

'ck h

President HFG/lg Enclosures i

cc:

B. Mechan J. Greeves C. Haughney C. Paperiello M. Weber S. Bahadur D. DeMarco E. Ten Eyck M. Federline B. Stiltenpole (38)

E. Brach CNWRA Directors / Element Managers g6\\g l

W. Kane H. Thompson S. Boyanowski(SwRI Contracts) l 9808190229 980814 g

PDR WASTE y

WM-11 PDR Q

Washington Office

  • Twinbrook Metro Plaza. #210 +12300 Twinbrook Parkway

,nuan-e J