Forwards Byron Unit 2 B2R07 ISI Summary Rept, in Compliance W/Requirements of Article IWA-6000 of Section XI of ASME B&PV Code,1983 Edition Through Summer 1983 Addenda IAW Byron TS 4.0.5
ML20237B321
Person / Time
Site: Byron Constellation icon.png
Issue date: 08/13/1998
From: Graesser K
COMMONWEALTH EDISON CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20237B323 List:
References
BYRON-98-5105, NUDOCS 9808180182
Download: ML20237B321 (1)


Text

- _ _ - _ _ _ - - - - - - _ _ - -

Osmnmnwealth lihson Company ll)ron Generating $tation 4150 North German Church Ro:id

11) run,11. 61010-979 i Tel 814234-5 ill August 13,1998 LTR: BYRON-98-5105 FIIE: 3.11.0321 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control 1)esk

SUBJECT:

Comed Byron Station Unit 2 Inservice Inspection Report for Interval 1, Period 3, Outage 3 (B2R07)

Byron Nuclear Power Station, Unit 2 Facility Operating IJcense NPF 66 NRC Docket No. 50-455 AU Please find attached a report for the Byron Unit 2 Inservice Inspections performed during Cycle 7 refueling outage (B2R07) during pril-May 1998. This report is being submitted in compliance with the requirements of Article IWA-6000 of Section XI of the ASME Boiler and Pressure Vessel Code,1983 Edition through Summer 1983 Addenda in accordance with l

Byron Technical Specification 4.0.5.

If there are any additional questions, please contact this office.

Sincerely, M30

'/

l' 3 K. L Graesser Site Vice-President Byron Nuclear Power Station q

KLG/WGK/cb Attachment cc:

NRC Regional Administrator, RIII (3

Byron Project manager, NRR I

,V Senior Resident Inspector, Byron Office of Nuclear Safety, IDNS 9808180182 900813 PDR ADOCK 05000455 O