ML20237A899

From kanterella
Jump to navigation Jump to search
Notification of 980914 Meeting W/General Electric in Schenectady,Ny to Discuss Issues Related to Staff Review of GE Pledge Code.Portions of Meeting May Be Proprietary in Nature
ML20237A899
Person / Time
Issue date: 08/13/1998
From: Carpenter C
NRC (Affiliation Not Assigned)
To: Sullivan E
NRC (Affiliation Not Assigned)
References
NUDOCS 9808170209
Download: ML20237A899 (4)


Text

Jde Cenkr-4 August 13,1998 MEMORANDUM TO: Edmund J. Sullivan, Acting Chief Materials and Chemical Engineering Branch Division of En in ering FROM:

C. E. Carp nier, Jr., Lead Project Manager Materials and Chemical Engineering Branch Division of Engineering

SUBJECT:

MEETING WITH GENERAL ELECTRIC (GE)

DATE & TIME:

Thursday, September 14,1998 8:00 a.m. - 5:00 p.m.

LOCATION:

GE Corporate Research and Development Center River Road Schenectady, NY 12301 i

PURPOSE:

TO DISCUSS ISSUES RELATED TO STAFF'S REVIEW OF THE GE PLEDGE CODE. PORTIONS OF THE MEETING MAY BE

{

PROPRIETARY IN NATURE.

W PARTICIPANTS *:

NRC

' UTILITY W. J. Shack, ANL Peter Ford, GE C. E. Carpenter, NRR Peter Andressen, GE et al.

et al.

cc: See next page CONTACT: C. E. Carpenter 301-415-2169 cec @nrc. gov

  • A portion of the meeting will involve discussions pertaining to proprietary information and, therefore, will be closed to the public. (The nonproprietary portion of the meeting will be opened for interested members of the public, petitioners, interveners or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy",43 Federal Reaister faHC FM CIEm

)

Distribution : See next page DOCUMENT NAME: G:\\BWRVIP\\GE-0914.MTR W

INDICATE IN BOX:"C"= COPY W/O ATTACHMENT / ENCLOSURE. "E"mCOPY W/ATT/ ENCL, *N"sNO COPY j

b EMCB:DE IN (A)EMDB:DE _

{

OFFICE EMCB:DE NAME CECarpenter KRWichman VRtd EJSullivan

/

DATE 08/ [#)/98 08/[.D/98 I//3 /98 M "2

OFFICIAL RECORD COPY l

9; L

i

~,' n c,t if

t f

fOh

,\\ p 9008170209 980813 c,4 PDR TOPRP EMVOENE x

l C

PM

.d8 t

p nerrug

)

y UNITED STATES j

NUCLEAR RE2ULATORY COMMISSION 2

2 WASHINGTON, D.C. 20001

/

August 13,1998 MEMORANDUM TO: Edmund J. Sullivan, Acting Chief Materials and Chemical Engineering Branch Division of Engineering FROM:

C. E. Carpenter, Jr., Lead Project Manager

/

Materials and Chemica! Engineering Branch f

Division of Engineering j

i

SUBJECT:

MEETWG WITH GENERAL ELECTRIC (GE)

DATE & TIME:

Thr,rsday, September 14,1998

{

8'JO a.m. - 5:00 p.m.

]

LOCATION:

GE Corporate Research and Development Center River Road Schenectady, NY 12301 PURPOSE:

TO DISCUSS ISSUES RELATED TO STAFF'S REVIEW OF THE GE PLEDGE CODE. PORTIONS OF THE MEETING MAY BE PROPRIETARY IN NATURE.

PARTICir' ANTS *:

NRC UTILITY W. J. Shack, ANL Peter Ford, GE C. E. Carpenter, NRR Peter Andressen, GE et al.

et al.

cc: See next page 1

CONTACT: C. E. Carpenter 301-415-2169 cec @nte. gov

  • A portion of the meeting willinvolve discussions pertaining to proprietaryinformation and, therefore, will be closed to the public. The nonproprietary portion of the meeting between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meet:ngs Open to the Public" 59 F,.deral Reaister 48340,9/20/94.

r i

l' I

{

l, E- --

1

o CC:

George Jones, Executive Chairman Dana Covill, Technical Chairman o

BWRVIP Assessment Task BWRVIP AssessmentTask Pennsylvania Power & Light GPU Nuciear A6-1 1 Upper Pond Road Two North Ninth Street Parsippany, NJ 07054 Allentown, PA 18101 Joe Hagan, Executive Chairman Carl Larsen, Technical Chairman BWRVIP inspection Task BWRVIP inspection Task Entergy Yankee Atomic P. O. Box 756 580 Main Street Waterloo Road Bolton, MA 01740 Port Gibson, MS 39150 Paul Bemis, Executive Chairman Vaughn Wagoner, Technical Chairman BWRVIP Integration Task BWRVIP Integration Task Washington Public Power Supply System Carolina Power & Light Company 4

P. O. Box 968 One Hannover Square 901

)

North Power Plant Loop P.O. Box 1551 Richland, WA 99352-0968 Raleigh, NC 27612 l

Lewis Sumner, Executive Chairman John Wilson, Technical Chairman BWRVIP Mitigation Task BWRVIP Mitigation Task Southem Nuclear Operating Co.

Clinton Power Station, M/C T-31C 40 invemess Center Parkway P.O. Box 678 Birmingham, AL 35201 Clinton,IL 61727 John Blomgren, Executive Chairman Bruce McLeod, Technical Chairman BWRVIP Repair Task BWRVIP Repair Task Commonwealth Edison Co.

Southem Nuclear Operating Co; 1400 Opus Place, Suite 600 Post Office Box 1295 Downers Grove, IL 60515-5701 40 invemess Center Parkway Birmingham, AL 35201 Bill Campbell, BWRVIP Vice Chairman Warren Bilanin, EPRI BWRVIP Carolina Power & Light Integration Manager P. O. Box 1551 Joe Gilman, EPRI BWRVIP Raleigh, NC 27612 Mitigation Manager Ken Wolfe, EPRI BWRVIP Robert Carter, EPRI BWRVIP Repair Manager Assessment Manager Electric Power Research Institute Greg Selby, EPRI BWRVIP P. O. Box 10412 Inspection Manager 3412 Hillview Ave.

EPRI NDE Center' Palo Alto, CA 94303 P. O. Box 217097 1300 W. T. Harris Blvd.

Charlotte, NC 28221

Distribution for Meetina Notice dated Auaust 13,1998 Hard Coov:

OGC ACRS Docket File PUBLIC EMCB R/F Receptionist (OWFN and TWFN)

W. J. Shack, ANL Peter Ford, GE Peter Andressen, GE E-MgH:

Glainas (GCL)

JStrosnider (JRS2)

LCShao (LCS1)

{

MEMayfield (MEM2)

BWSheron (SLM3)

RHWessman (RHW)

TEColl:ns (TEC)

OPA PMNS THiltz (TGH) 4 l

_ _ _ _ _ _ _ _. _. _ _ _ _ -.