ML20237A852

From kanterella
Jump to navigation Jump to search
Notification of 980820 Meeting W/Boiling Water Reactor Vessel & Internals Project in Rockville,Md to Discuss Issues of Concern Related to BWR Vessels & Internals. Portions of Meeting May Be Proprietary in Nature
ML20237A852
Person / Time
Issue date: 08/13/1998
From: Carpenter C
NRC (Affiliation Not Assigned)
To: Sullivan E
NRC (Affiliation Not Assigned)
References
NUDOCS 9808170179
Download: ML20237A852 (4)


Text

..;

. August 13,1998 3

.\\

. MEMORANDUM TO: Edmund J. Sullivan, Acting Chief l

Materials and Chemical Engineering Branch Division of Engineering FROM:

C. E. Carpenter, Jr., Lead Project Manager Materials and Chemical Engineering Branch Division of Engineering

SUBJECT:

MEETING WITH BOILING WATER REACTORS VESSEL AND INTERNALS PROJECT (BWRVIP)

DATE & TIME:

Thursday, August 20,1998 8:30 a.m. - 3:00 p.m.

I LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North Room 0-1 F-5 11555 Rockville Pike Rockville, MD 20852-2738 PURPOSE:

TO DISCUSS ISSUES OF CONCERN RELATED TO BWR VESSELS AND INTERNALS. PORTIONS OF THE MEETING MAY BE PROPRIETARY IN NATURE.

PARTICIPANTS *:

N_R_Q UTILITY R. A. Hermann, NRR Dana Covill, GPU Nuclear

[.

K. R. Wichman, NRR Vaughn Wagoner, CP&L C. E. Carpenter, NRR Warren Bilanin, EPRI E. M. Hacket, RES Robin Dyle, BWRVIP l

et al.

et al.

cc: See next page b h hk l

CONTACT: C. E. Carpenter l

301-415 2169 cecenrc. gov l

l

  • A portion of the meeting will involve discussions pertaining to proprietary information and, i

therefore, will be closed to the public. (The nonproprietary portion of the meeting will be opened I

- for interested members of the public, petitioners, interveners or other parties to attend as l

observers pursuant to *Open Meeting Statement of NRC Staff Policy",43 Federal Reaister

{

28058,06/28/78.)

1 l

Distribution: See next page I

DOCUMENT NAME: G:\\BWRVIP\\ VIP-0820.MTR

/gJ l

memAn m aox:-c.coPV WC ATTACHMENTENCLOSURE T= COPY W/AUMNCL,W NO COPY

{

ormcE EMCB:DE EMCB:DE (A)EMCB:CE CECarpenter M

/ KRWichman EEu:livan ed-NAME 08//3/98 T/ O/98 b N'jod h-DATE 08/07/98

/

W o A * ( Ih OFFICIAL RECORD COPY c,

~

9908170179 990813 PDR TOPRP EXIEPRI C

pm

crog I

g i

UNITED STATES g

j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. - **1

'+9 * * *,+,d August 13,1998 j

MEMORANDUM TO: Edmund J. Sullivan, Acting Chief I

Materials and Chemical Engineering Branch Division of Engineering FROM:

C. E. Carpenter, Jr., Lead Project Manager

)

Materials and Chemical Engineering Branch Division of Engineering

SUBJECT:

MEETING WITH BOILING WATER REACTORS VESSEL AND INTERNALS PROJECT (BWRVIP)

DATE & TIME:

Thursday, August 20,1998 8:30 a.m. - 3:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North Room O-1-F-5 11555 Rockville Pike Rockville, MD 20852 2738 PURPOSE:

TO DISCUSS ISSUES OF CONCERN RELATED TO BWR VESSELS AND INTERNALS. PORTIONS OF THE MEETING MAY BE PROPRIETARY IN NATURE.

PARTICIPANTS *:

NRC UTILITY R. A. Hermann, NRR Dana Covill, GPU Nuclear K. R. Wichman, NRR Vaughn Wagoner, CP&L C. E. Carpenter, NRR Warren Bilanin, EPRI E. M. Hacket, RES Robin Dyle, BWRVIP et al.

et al.

I cc: See next page CONTACT: C. E. Carpenter 301-415-2169 cec @nrc. gov

  • A portion of the meeting willinvolve discussions pertaining to proprietary information and, l

therefore, will be closed to the public. The nonproprietary portion of the meeting between NRC technical staff and applicants orlicensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reoister 48340,9/20/94.

cc:

George Jones, Executive Chairman Dana Covill, Technical Chairman BWRVIP Assessment Task BWRVIP Assessment Task Pennsylvania Power & Light GPU Nuclear A6-1 1 Upper Pond Road Two North Ninth Street Parsippany, NJ 07054 Allentown, PA 18101 Joe Hagan, Executive Chairman Carl Larsen, Technical Chairman BWRVIP inspection Task.

BWRVIP inspection Task Entergy Yankee Atomic P. O. Box 756 580 Main Street Waterloo Road Bolton, MA 01740 Port Gibson, MS 39150 Paul Bemis, Executive Chairman Vaughn Wagoner, Technical Chairman BWRVIP Integration Task BWRVIP Integration Task Washington Public Power Supply System Carolina Power & Light Company P. O. Box 968 One Hannover Square 9C1 North Power PFt Loop P.O. Box 1551 Richland, WA 99352-0968 Raleigh, NC 27612 i

Lewis Sumner, Executive Chairman John Wilson, Technical Chairman BWRVIP Mitigation Task.

BWRVIP Mitigation Task Southem Nuclear Operating Co.

Public Service Electric & Gas Co.

40 invemess Center Parkway N51 Birmingham, AL 35201 Post Office Box 236 Hancocks Bridge, NJ 08038 John Blomgren, Executive Chairman Bruce McLeod, Technical Chairman BWRVIP Repair Task BWRVIP Repair Task Commonwealth Edison Co.

Southem Nuclear Operating Co.

1400 Opus Place, Suite 600 Post Office Box 1295 Downers Grove, IL 60515-5701 40 inverness Center Parkway Birmingham, AL 35201 Bill Campbell, BWRVIP Vice Chairman Warren Bilanin, EPRI BWRVIP i

Carolina Power & Light integration Manager P. O. Box 1551 Joe Gilman, EPRI BWRVIP l

Raleigh, NC 27612 Mitigation Manager Ken Wolfe, EPRI BWRVIP Robert Carter, EPRI BWRVIP Repair Manager

- Assessment Manager Electric Power Research Institute Greg Selby, EPRI BWRVIP P. O. Box 10412 1

- InspectKm Manager 3412 Hillview Ave.

EPRI NDE Cenk>r Palo Alto,CA 94303 P. O. Box 217097 1300 W. T. Harris Blvd.

Charlotte, NC 28221 1

Distribution for Meetina Notice dated Auaust 13.1998 Hard Coov:

OGC_

ACRS' Docket File

' PUBLIC EMCB R/F Receptionist (OWFN and TWFN)

E-Mag:

- SJCollins (SJC1)

FMiraglia (FJM)

GLainas (GCL)

JStrosnider (JRS2)

LCShao (LCSI)

GHolahan (GMH)

SNewberry (SFN) -

- MEMayfield (MEM2)

BWSheron (SLM3)

RHWessman (RHW)

TECollins (TEC)

OPA PMNS THiltz (TGH)

I i

l l

l t

o 4

i l

l i

L1______

-. _