ML20237A840

From kanterella
Jump to navigation Jump to search
Forwards for Info,Initial Review of Y2K Readiness Audit Plan Proposed to Be Used by Instrumentation & Controls Branch Staff in Forthcoming Audits at 12 Plant Sites as follow-up to GL 98-01
ML20237A840
Person / Time
Issue date: 08/13/1998
From: Chiramal M
NRC (Affiliation Not Assigned)
To: Wermiel J
NRC (Affiliation Not Assigned)
Shared Package
ML20237A841 List:
References
GL-98-01, GL-98-1, NUDOCS 9808170175
Download: ML20237A840 (1)


Text

h y

August 13,1998

^

NOTE TO:

Jared S.' Wermiel, Chief instrumentation and Controls Branch FROM:

Matt Chiramal, Sr. Level Advisor original signed byf' instrumentation and Controls Branch

SUBJECT:

Y2K READINESS AUDIT PLAN Attached for your information is the initial revision of the Y2K Readiness Audit Plan that is proposed to be used by the Instrumentation and Controls Branch (HICB) staff in the forthcoming audits at 12 plant sites as. follow-up to NRC GL 98-01, to assess the effectiveness of licensee Y2K readiness programs. The plan includes most of the items that were in the draft Tl on Y2K readiness. -The plan also incorporates most of the resolutions of comments received on the draft TI. The Y2K audit plan is expected to be revised after the first couple of plant audits.

Attachment:

As stated DISTRIBUTION:

Central File -

PDR

- HICB/RF--

f R. L. Spessard

\\[

J. Mauck 4

D. Spaulding Q

' G. Klingler DOCUMENT NAME: AUDIT. NOTE (98 '89).

Ti sseelve e cap ' of this document. Indcots in the bos: "C" = Copy without attachment / enclosure

  • E" = Copy with attachment / enclosure "N' = No copy OFFICE -

HICB:DRCH L l BC:IdlGB.

lE l

l-l l

NAME-MChiramal JWe M

~

DATE:

08/11/90 08//[/98 08/ /98 08/ /98 08/ /98 OFFICIAL RECORD COPY coas p NBC FRF ggtjyfB CDPy 1

JuvG5 9908170175 990813 PDR ORO MtRA PDR

<