Notifies of Plans to Conduct Preoperational Assessment of West Valley Demonstration Project During Wk of 880104. Assessment Viewed as Part of NRC Monitoring Responsibility Mandated by 1980 West Valley Demonstration Project Act
ML20237A785
Person / Time
Issue date: 12/10/1987
From: Hurt R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Bixby W
ENERGY, DEPT. OF
References
REF-PROJ-M-32 NUDOCS 8712150259
Download: ML20237A785 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project No. M-32 Dr. W. W. Bixby, Director DEC 101987 West Valley Project Office Department of Energy P. O. Box 191 West Valley, NY 14171

Dear Dr. Bixby:

This is to formally notify you cf our plans to conduct a preoperational assessment of the West Valley Demonstration Project during the week of January 4,1988.

This assessment is viewed as part of the NRC's monitoring responsibility mandated by the 1980 West Valley Demonstration Project Act.

The assessment will be conducted by a team of NRC staff members, most of them inspectors from our Region I office. The individuals involved are experienced in start-up reviews and should be able to make a valuable contribution in assuring that the Supernatant Treatmcnt System, Cement Solidification System, and Liquid Waste Treatment System are ready for safe operation. The names and areas of interest of the monitoring team members are listed on the attachment.

I will also be present during the week of January 4 to assist the monitoring team with respect to our previous technical reviews as reflected in the NRC's Safety Evaluation Reports.

The assessment is tined to take place approximately three weeks prior to the present scheduled start of supernatant processing. We expect that the con-struction of process systems and specification of operating procedures will be almost completely finished by that time, and that the NRC team can draw final conclusions about the operational readiness of the Supernatant Treatment System and its downstream support processes.

I understand that Jerry Roth of the Region I office has already spoken to your staff about the logistical details of the preoperational assessment. Please feel free to call Mr. Roth or me if you have further questions.

Sincerely, igned bj Original s R. Davis Hurt West Valley Project Manager Advanced Fuel and Special:

~~ ~~~ ;

.M

~

8712150259 B71210 Facilities Section PDR PROJ PDR Fuel Cycle Safety Branch M-32

Enclosure:

3,,

Monitoring Team for West Valley i 't Demonstration Project

{p

! D:.

'A p _j L Distribution:

Project No. M-32 GSjoblom RECunningham RBellamy, RI PDR &_L'PDR-IMAF R/t LCRouse GATerry JRoth Region I IE Region I

,,NMSS. ELF..._ _._._

GCComfort JShaffner, FLBrown LA File RWeller, HLWM RDHurt DSly

R

.M-_

s

[_

__k

[

_@.z_-

Lfouse_:_______:._______03a.

kt

. <- w

GATE, NAME:RDHurt:lg:

own:

SS D DATE:12/f/87:

12P/8/:

12///87:

12f087:

0FFICIAL RECORD COPY

~ ~ - - --

i

[l 4

0 t

MONITORING TEAM FOR WEST VALLEY DEMONSTRATION PROJECT Area of Interest Team Member jl l,'

1.

Team Leader J. Roth 2.

Quality assurance D. L. Caphton (emphasis on SIS) 3.

Welding E. H. Gray 4.

Emergency Planning C. Z. Gordon (emphasisonoff-sitecoordination) 5.

Effluent treatment B. S. Davidson 6.

Fire protection A. G. Krasopoulos (emphasis on fire suppression systems) 7.

Procedure control and W. G. Martin and D. Sly operator training l

l 8.

Analytical chemisty H. Zibulsky

?,

,,..,,,...s-,,

.,7.y.,q.7, gyp 3j,,,,3 7.gg.

.,,_.,,,,.,,,;