LONG ISLAND LIGHTING COM PANY L_
SHOREHAM NUCLEAR POWER STATION P.O. BOX 610, NORTH COUNTRY ROAO + WADING RIVER, N.Y.11792 4HN D. LEONARD, JR.
VICE PRESIDENT NWLE AR OPERATIONS SNRC-1396 DEC 10 087 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555 3
Supplemental Containment System PRA Status Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322-Gentlemen:
In response to your summary of the July 21, 1987 meeting conce{ ping the design of the Supplemental Containment System (SCS)
, LILCO forwarded additional information gpncerning the SCS in an August 28, 1987 submittal to the Staff In that submittal, LILCO indicated that it would respond to the specific questions highlighted in the meeting summary upon completion of the on-going PRA analysis.
The completion of the PRA analysis was anticipated by October 1987, however, as a result of other analyses performed in support of the PRA, modifications are required.
LILCO currently anticipates completion of the PRA by February 1988.
Specifically, as discussed in the meeting and subsequent sub-mittals, LILCO had indicated its intent to include relief valves on the discharge vent lines of the SCS structure.
This relief valve configuration was added to enhance Shoreham specific needs concerning elevated releases.
As a result of the preliminary analyses performed by SwedPower along with subsequent analyses performed by LILCO and its PRA contractors, modifications to the relief valve configuration are required.
1/
Summary of Meeting With LILCO on July 21, 1987, Regarding the Design of a Supplemental Containment System, U.S.
Nuclear Regulatory Commission, Docket No. 50-322, July 28, 1987.
2/
Request for Concurrence with the Proposed Supplemental Containment System, SCS Plan and Response to Staff Concerns, J.
D.
Leonard, Jr. to U.S.
Nuclear Regulatory Commission, SNRC-1367, August 28, 1987.
\\g '
D 8712140444 871210 PDR ADOCK 05000322 P
f SNRC-1396 Page 2 I
The finalization of the new configuration and its input into the PRA will result in having available the PRA analysis by February 1988.
LILCO will continue to strive to improve on this completion date and provide responses to the six remaining NRC concerns as the data becomes available.
Should you have any questions or require additional information, please do not hesitate to contact my office.
Very truly yours,,
q
'n q.
e a eu.
do n D. Leonard, Jr.
Vic President - Nucle Operations sy. ck cc:
R. Lo W. Russell F. Crescenzo