ML20237A305
| ML20237A305 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 08/07/1998 |
| From: | Wiggins J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rainey G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20237A307 | List: |
| References | |
| 50-352-98-05, 50-352-98-5, 50-353-98-05, 50-353-98-5, NUDOCS 9808130262 | |
| Download: ML20237A305 (3) | |
See also: IR 05000352/1998005
Text
_ _ _ _ _ _ _ _ _
_ - _ _ _ _
._
_-.
-
August 7, 1998
l
,
,%-
i
Mr. G. Rainey, President
PECO Nuclear
Nuclear Group Headquarters
l
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087-0195
SUBJECT:
. NRC ENGINEERING TEAM INSPECTION 50-352/98-05 AND 50-353/98-05
Dear Mr. Rainey:
This letter refers to the engineering team inspection conducted June 1-19,1998, at the
Limerick Generating Station which evaluated engineering and corrective action activities.
The enclosed report provides the results of this inspection; preliminary findings and
conclusions were presented to PECO managers led by Mr. J. VonSuskil on June 24,1998.
Generally, the team concluded that engineering activities were being performed in a very
good manner. The programs and procedures were sound, and the results were generally
accurate and effective. In particular, the root cause determination for the inadvertent
standby liquid control actuation was thorough, accurate, and insightful. Nonetheless, we
have observed some probimes with plant operations related to engineering performance.
.The team noted that operators have needed to respond to equipment problems that
resulted in operational challenges.
The NRC has determined that a violation of NRC requirements occurred regarding
ineffective corrective action. The violation is cited in the enclosed Notice of Violations,
and the circumstances surrounding it are described in detail in the subject inspection
report. You are required to respond to this letter, and should follow the instructions
specified in the enclosed Notice when preparing your response. The NRC will use your
response, in part, to determine whether further enforcement action is necessary to ensure
compliance with regulatory requirements.
f
L
)
!.
l
(V
130013
-
9908130262 990907
w
ADOCK 05000352
G
a
.
i
O
Mr. G. Rainey
2
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR).
Sincerely,
ORIGINAL SIGNED BY:
James T. Wiggins, Director
Division of Reactor Safety
Docket Nos.: 50-352,50-353
Enclosures:
NRC Inspection Report 50-352/98-05,50-353/98-05
cc w/encis:
G. Edwards, Chairman, Nuclear Review Board and Director - Licensing
J. VonSuskil, Vice President - Limerick Generating Station
T. Moore, Manager, Experience Assessment
Secretary, Nuclear Committee of the Board
Commonwealth of Pennsylvania
l
l
!
l
!
_ _ _ _ _ _ _ - -
_ . _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _
=
<
.
t
,
Mr. G. Rainey
3
Distribution w/ encl:
Region i Docket Room (with concurrences)
H. Miller, RA/W. Axelson, DRA
J. Wiggins, DRS
L. Nicholson, DRS
G. Meyer, DRS
A. Lohmeier, DRS
L. James, DRS
J. Yerokun, DRS
C. Anderson, DRP
D. Florek, DRP
.R.Junod,DRP
NRC Resident inspector
Nuclear Safety Information Center (NSIC)
PUBLIC
DRS File
i
Distribution w/ encl: (Via E-Mail)
B. McCabe, OEDO
l
R. Capra, PDI-2, NRR
j
inspection Program Branch, NRR (IPAS)
'
R. Correia, NRR
F. Talbot, NRR
]
M. Campion, ORA
'
DOCDESK
!
DOCUMENT NAME: G:\\CMMEB\\LOHMEIER\\ LIM 9805.lNS
To receive a copy of this document, indicate in the box: *C" = Copy without attachment / enclosure T = Copy with
attachment / enclosure
- N" = No copy
i
OFFICE
Rl/DRS
l
Rl/DRS
l
Rl/DRP
Rl/DRS
l
.
NAME,
<ALohmeier
GMeyer
n,
CAnderson cljj(f
JWiggins V
c
DATE M 08/07/98 (g
08/1/98 7 08/")/98
08/7/98 (/
08/ /98
jf
OFFICIAL RECORD COPY
!