Corrected Page 1 to Sept 1987 Monthly Operating Rept, Revising yr-to-date Gross Electrical Energy Generated
ML20237A161
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/30/1987
From: Woodard J
ALABAMA POWER CO.
To:
Shared Package
ML20237A100 List:
References
NUDOCS 8712140302
Download: ML20237A161 (2)


Text

_-

s OPERATING DMA REPORT

\\

DOCKET NO.

50-348 DPLTE 10/2/B7 03tPIETED BY J. D. Woodard TELEPB34E (205)899-5156 OPERATING S1EIUS l

Notes

1. Unit Name:

Joseph M. Farley - Unit 1

2. Reporting Period:

September, 1987

1) Cuimalative data since
3. Licensed t ermal Power ( E t):

2,652 12-1-77, date of

4. Nameplate Rating (Gross We):

860 conmercial operation

5. Design Electrical Rating (Net W e): 829
6. Maximum Dependable Capacity (Gross We):

856.0

7. Maximum Dependable Capacity (Net We):

825.1

8. If Changes Occur in Capacity Ratings (Items Number 3 m rough 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net Me):

N/A

10. Reasons For Restrictions, If Any:

N/A his Month Yr-to-Date Cumulative i

11. Hours In Reporting Period 720 6,551 86,183

'2. Number Of Hours Reactor Was Critical 720.0 6,300.3 63,209.8

13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
15. Unit R'tserve Shutdown Hours 0.0~

6,238.3 61,860.7

14. Hours Generator On-Line 720.0 0.0 0.0
16. Gross hermal Energy Generated ( WH) 1,909,437 16,138,496 157,466,164-
17. Gross Electrical Energy Generated (W H) 610,066 5,204,738 50,567,782
18. Net Electrical Energy Generated (WH) 579,704 4,932,452 47,656,786
19. Unit Service Factor 100.0 95.2 71.8
20. Unit Availability Factor 100.0 95.2 71.8
21. Unit Capacity Factor (Using MDC Net) 97.6 91.3 68.7
22. Unit Capacity Factor (Using DER Net) 97.1 90.8 66.7
23. Unit Forced Outage Rate 0.0 1.2 9.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance Outage, March 1988, approximately seven weeks

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06M 7 08/09M 7 INITIAL ELECTRICITY 08/20M7 08/1847 COPPERCIAL OPERATICN 12/0147 12/01M7 Form 2/34 8712140302 871211

.i PDR ADOCK 05000348

/

R DCD gfg SV f//

l l

i OPERATING DMA REPORT i

DOCKET No. 50-348 ERTE 10/2/87 (XMPIE.TED BY J. D. Woodard 1

'I1!1EPEKHC (205)899-5156 I

I OPERATING S'DdUS Notes

1. Unit Name:

Joseph M. Farley - Unit 1

2. Reporting Period:

September, 1987

1) Cumulative data since
3. Licensed %ermal Power ( M t):

2,652 12-1-77, date of

4. Nameplate Rating (Gross We):

860 consnercial operation l

S. Design Electrical Rating (Net Me): 829

6. Maximum Dependable Capacity (Gross W e):

856.0

7. Maximum Dependable Capacity (Net Me):

825.1

8. If Changes. Occur in Capacity Ratings (Items Number 3 'Ihrough 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net Me):

N/A J

10. Reasons For Restrictions, If Any:

N/A i

l l

l Wis Month Yr-to-Date Cumulative t

11. Hours In Reporting Period 720 6,551 86,183 l

'.2. Number Of Hours Reactor Was Critical 720.0 6,300.3 63,209.8

13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 720.0 6,238.3 61,860.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross h ermal Energy Generated ( W H) 1,909,437 16,138,496 157,466,164 l
17. Gross Electrical Energy Generated ( WH) 610,066 5,204,738 50,567,762
18. Net Electrical Energy Generated (&H) 579,704 4,932,452 47,656,786
19. Unit Service Factor 100.0 95.2 71.8
20. Unit Availability Factor 100.0 95.2 71.5
21. Unit Capacity Factor (Using MDC Net) 97.6 91.3 68.7
22. Unit Capacity Factor (Using DER Net) 97.1 90.8 66.7~
23. Unit Forced Outage Rate 0.0 1.2 9.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance Outage, March 1988, approximately seven weeks

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Consnercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06M7 08/09M7 INITIAL ELECTRICITY 08/20M7 08/18M7 COMMERCIAL OPERATICN 12/OlM7 12/OlM7 Form 2/34

....