ML20237A140

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1987
ML20237A140
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/30/1987
From: Haltiwanger J
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20237A135 List:
References
NUDOCS 8712140286
Download: ML20237A140 (4)


Text

,

i Document Control. Desk-November Monthly Operating Report Page.:1~

j ATTACHMENT.I AVERAGE DAILY UNIT POWER' LEVEL DOCKET NO.

50/395 l

UNIT V. C. SUMMER I DATE 12/02/87 COMPLETED BY J. W..HALTIWANGER, TELEPHONE (803) 345-4297 1

NOVEMBER 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

883 17.

890

'2.

884 18.

889 3.-

886 19.

890 4.

885 20.

890 5.

886 21.

889 6.

887 22.

890 7.

886 23.

890 8.

886 24.

889 9.

886 25.

889 10.

885 26.

890 11.

887 27.

891 12.

888 28.

889 13.

888 29.

890 14.

889 30.

889 15.

889 16.-

889 8712140286 871208

.PDR ADOCK 05000395 I

K.

DCD

.e l

" Document'Contbol Desk November Monthly Operating Report Page 2 ATTACHMENT'II l

OPERATING DATA REPORT i

DOCKET NO.

50/395 UNIT V. C. SUMMER I

)

DATE 12/02/87 COMPLETED BY J. W. HALTIWANGER 1

TELEPHONE (803) 345-4297 OPERATING STATUS

1. Reporting Period:

November 1987 Gross Hours in Reporting Period:.

720

2. Currently Authorized Power. Level (MWt): 2775 Max. Depend. Capacity (MWe-Net):

885 Design Electrical Rating (MWe-Net):

900

3. Power Level to Which Restricted (If Any)(MWe_ Net): N/A
4. Reasons for Restrictions:

N/A THIS MONTH YR TO DATE CUMULATIVE

5. Number of Hours Reactor Critical 720.0 5478.4 25924.9
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator on Line 720.0 5392.9 25384.1
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 1,995,917 14,327,446 66,721,766
10. Gross Electrical Energy (MWH) 665,790 4,730,220 22,139,679
11. Net Electrical Energy Generated (MWH) 639,368 4,489,402 21,072,679
12. Reactor Service factor 100.0 68.3 75.5 13.. Reactor Availability Factor 100.0 68.3 75.5
14. Unit Service Factor 100.0 67.3 74.0
15. Unit Availability Factor 100.0 67.3 74.0 1
16. Unit Capacity Factor (Using MDC) 100.3 63.3 69.4
17. Unit Capacity Factor (Design MWe) 98.7 62.2 68.2
18. Unit Forced Outage Rate 0.0 6.1 6.7
19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):

None

20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A l
21. Units in Test Status (Prior to Commercial Operation):

N/A

Document Control Desk November Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS i

DOCKET NO.

50/395 UNIT V. C. SUMMER I i

DATE 12/02/87 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345-4297 NOVEMBER 1987 Method of l

TYPE Shutting F or S Duration Down the Corrective Actions /

No.

Date Reason Forced or (Hours)

Reactor or Comments Scheduled Reducing Power NONE i

)

I i -

Document Control Desk.

November Monthly Operating. Report Page_4 ATTACHMENT IV NARRATIVE

SUMMARY

.OF OPERATING EXPERIENCE l

DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE 12/02/87 4

COMPLETED BY J. W. HALTIWANGER TELEPHONE (803)345-4297 l

1 NOVEMBER 1987

.1 V. C. Summer Nuclear Station, Unit 1 operated at approximately 100 percent power for the entire month of November.1987.

i l

l

[.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _