ML20237A108

From kanterella
Jump to navigation Jump to search
Forwards Corrected Page 1 of Sept 1987 Monthly Operating Rept,Correcting Cumulative Hours in Reporting Period
ML20237A108
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/08/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20237A110 List:
References
NUDOCS 8712140265
Download: ML20237A108 (1)


Text

__

j

=;

q Alabama Power Company m

600 North 18th Street.

Post office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835.

m

' R. P. Mcdonald AlabamaPower Senior Vice President the southem electnc system December 8, 1987 Docket No. 50-364 U. S. Nuclear Regulatory Comnission ATIN: Document Control Desk

.. Washington, D. C.

20555 Joseph M. Farley Nuclear Plant l

Unit 2 Monthly operating Data Report Attached are two (2) copies of'page one of the September 1987 Monthly.

Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications which has been revised to correct the cumulative hours in the reporting period.

If you have any questions, please advise.

Yours very truly, kh R. P. Mcdonald RPWJGS:mab Attachments xc: Director, OE (10 copies)

Director, RII (1 copy)

M 8712140265 871208

@7

~PDR ADOCK 05000364 R

i i

PDR,

_-