ML20236Y449
| ML20236Y449 | |
| Person / Time | |
|---|---|
| Issue date: | 08/03/1998 |
| From: | Mearse S NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Patrick W CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES |
| References | |
| CON-FIN-J-5156, CON-NRC-02-97-001, CON-NRC-2-97-1 NUDOCS 9808120202 | |
| Download: ML20236Y449 (3) | |
Text
03 H s # 2 00# B 9(P Q #0 G H I Lt. :6U1-41sZsotiU~
~
~NI[5 1b:40 No.Uv3Yut[v r
~
Jul 9CD
/
t+
p 1
UNITED STATES 3
]
NUCLEAR REGULATORY COMMl8840N wasamcros, o.c. samam JUL 2 8 8 Wesley C. Patrick, Presidesc s
Center for NucteerWasee Regulatory Crr:
y s
$230 Culebra Road PO Drawer 28510 San Antonio, TX 78228 0510 Sut(ect:
Modification No. E to Task Order No. 2 Ureder contract NRC 02-47 001
Dear Dr. Patrick:
in accordance with the task order procedures of the subject contract, this letter deRaitizes Modlecation No. 8 to Task onder No. 2. This effort shall be perfanned in accordanos with I
the enclosed statement of Work and the changes to the Contractor's technical proposal subenitted for this modification. The effective date of this task order modification shaR be July 24,1998.
This enoddication incre'.ses the cost ceiling of this task order from $154,430 to $197,423.
I The amount of $179,150 represents the total entirzated reimburemble costs, the amount of
$5,015 represents the cost of facility capital, and the amount of $13,258 represents the ftxed fee for this task order.
Accountmg Data for Modsficabon No. G to Task Order No. 2 is as follows:
B&R No.: 75015232000 JC No.:
J5156 BOC:
252A Appn. No.: 31X0200 Obligated: 5115.565 (in addition,581,858 was obligated on original contract document and is allotted to this task onter. This increasse the current allocation from 548,886 to $41,858.)
j All other terms and conditior.s of this task order 'eniain the same.
r Please indicate your acceptance of Modification No. S to Task Order No. 2 by having an official authorized to bind your organization, execute three (3) copies of this document in the space provided and return two (2) copies to the U.S. Nuclear Regulatory C-: -
' " =.,
Aten: Mrs. Barbara Meehan, ADM/DCPM/CMB3, Mall Stop T-712, Washington, DC 20066.
You should twenin the third copy for your records.
3 4
~
9808120202 900003 PDR CONTR NRC-02-97-OO1 PDR
GI3580001&dMT00#&GD ILL:SU b415-bos ~
~ ~ ~Ju1 [ti'~$ti~ Ib
- 2( No.UU5 E U37U(
i If you have any questions regarding this matter, please contact Mrs. Meehan on (301) 415-8730.
l Sincerely, l
h
,.. y 3
(,. A haron Mearse, Contracting OIRcor Contreet "5:;: c.;r.; Branch No. 3 Division of Contracts and Property Management Office of Administration
Enclosure:
As stated Accepted:
C) 0 R. B. Kalmbach I
Director, Contractn Title August 3, 1998 Date O
G
NRC/RDI/DCCC/DCB TEL:301-415-5380~
~ ~ ~ 7Fn~ 16 :27 No.oudTo470 <
Ju1 MODIFICATION OF CONTRACT ENTITLLD. TECHNICAL ASSISTANCE FOR REVIEWING LICENSEE SUBMITTALS CONCF.RNING DECOMMISSIONING" CHANGE TO TASK ORDER NO.2
" PERFORMANCE ASSESSMENT ANALYSIS IN SUPPORT OF JEFFERSON PROVING GROUND"
- 1) -
Please modify socion 6.0 (sope of work) of the Stan, ment of Work to change the item l
"G" PA analysis to Traft PA Analysis." This will result in no increase in the level of effort for the task (only a change in name).
2)
Please add an item "H" to section 6.0 (scope of work) of task order 2 and a new delivuable(No. 8801002-006), entitled," Final Performance Asernsment Analysis."
This will nesult in an increase in the level of effort of 0.15 FIE for the new work described in item (3)below.
3)
Item "H," identified in (2) above will read as follows: The contractor will modify the Draft PA Analysis required in paragraph "G" of the scope of work to review - -
from NRC on the Draft PA Analyisis and to make the appropriate indicatel y to this 2-: 2 m 4)
Add the following trips to section 8.0. Meet ngs and Travel. (1) "One three person i
CNWRA trip to Jefferson Proving Oround m attend a Public m.eing for 2 days" and (2) One two person CNWRA trip to NRC Headquarters in Rockvilk, Maryland to brief the NRC Staff on the Draft PA Analysis report. These trips will only be taken at the direction of the NRC TM.
l l
-