IN RESPONSE, PLEASE I
[
UNITED STATES
' t.,
NUCLEAR REGULATORY COMMISSION
/2,d[
,j W ASHIN GTON, 0.C. 20555
'ko,,,,,,[
December 7, 1987 OFFICE OF THE SECRETARY MEMORANDUM FOR THE RECORD rp_
FROM:
Samuel J.
Chilk, Secr p
SUBJECT:
RISPING BY COMBUSTION ENGINEERING ON NEW GT IDARDIZED PLANTS, 2:00 P.M.,
MONDAY, NOVEMBE 3 0',
1987, COMMIS-SIONERS' CONFERENCE ROOM, D.C.
OFFICE (OPEN TO PUBLIC ATTENDANCE)
The Commission was briefed by representatives of Combustion Engineering, Inc. on the status and efforts to develop a standardized nuclear power station (System 80+) for design certification.
I l
Presentations by Combustion Engineering representatives were I
made by the following:
- Dr.
S.T.
Brewer Senior Vice President Nuclear Power Systems
- A.E.
Scherer, Director Nuclear Licensing
- Dr.
R.A. Matzie, Director ALWR Project Office
- R.E. Newman Vice President Nuclear Systems
- Dr. M.D. Green, Manager Standard Plant Licensing Combustion Engineering stated that it would address at a later date hgw it intends to achieve a severe core damage frequency of 10 with high level of confidence.
The Commission stressed its expectation that a standardized plant be designed as complete as possible with focus on optimization of maintenance and surveillance testing.
hk PDR PT9.7
.\\, There were no requirements placed on the staff at this briefing.
cc: