Forwards Insp Repts 50-352/98-04 & 50-353/98-04 on 980519-0706 & Nov.Violation Involves Inadequate Testing for Which C/As Were Less than Adequate
ML20236X797
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/05/1998
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20236X800 List:
References
50-352-98-04, 50-352-98-4, 50-353-98-04, 50-353-98-4, NUDOCS 9808100265
Download: ML20236X797 (3)


See also: IR 05000352/1998004

Text

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ . _ _ - _ _ _ _ _ _ - _ _ _

9 $

August 5, 1998

1

Mr. G. Rainey, President

PECO Nuclear

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, PA 19087-0195

SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-352/98-04,50-353/98-04

AND NOTICE OF VIOLATION

Dear Mr. Rainey:

This refers to the inspection conducted on May 19,1998, through July 6,1998, at your

Limerick Units 1 and 2 reactor facilities. The enclosed report presents the results of this

inspection.

During the 7-week inspection period covered by this report, the conduct of activities at

Limerick Units 1 and 2 was generally characterized by safe and conservative operations

and decision making. Your operators maintained both units at essentially 100% power

following their respective unit start-ups from their outages.

The inspectors reviewed several incidents during this inspection period that challenged

your control room operators and staff. These included, an inadvertent standby liquid

control system actuation, both subsystems of the reactor protection system being

inoperable concurrently, and main steam bypass valve operation during the Unit 1 reactor

start-up. Although your operator's response was acceptable, all of these instances

involved areas for procedure improvement. Further, during the overhaul of the D14

emergency diesel generator, several procedure adherence deficiencies were noted cross-

departmentally. Examples of procedure adherence deficiencies noted in this inspection

report and in prior reports indicate declining performance in this area.

Based on the results of this inspection, the NRC has determined that violations of NRC

requirements occurred. These violations are cited in the enclosed Notice of Violation

(Notice) and the circumstances surrounding them are described in detail in the subject

inspection report. The first violation is of concern because it involves inadequate testing

for which your corrective actions were less than adequate. The second violation is of

concern since the missed report appears to have occurred as a result of an inadequate

process. You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. Tne NRC will use your

response, in part, to determine whether further enforcement action is necessary to ensure

compliance with regulatory requirements.

\

9808100265 980805

PDR ADOCK 05000352

G PDR

OFFICIAL RECORD COPY IE:01

l

t _- a

____

_ _ _ _ _ _ _ - _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

$ %

Mr. G. Rainey 2

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR),

Sincerely,

Original Signed by:

Clifford J. Anderson, Chief

Projects Branch 4

Division of Reactor Projects

Docket Nos.: 50-352,50-353

License Nos: NPF-39, NPF-85

Enclosures:

1. Notice of Violation

2. NRC Inspection Report 50-352/98-04,50-353/98-04

cc w/encis:

G. Edwards, Chairman, Nuclear Review Board and Director - Licensing

J. VonSuskit, Vice President - Limerick Generating Station

T. Moore, Manager, Experience Assessment

Secretary, Nuclear Committee of the Board

Commonwealth of Pennsylvania

l

l

,

I

6 i

Mr. G. Rainey -3

Distribution w/encis:

Region I Docket Room (with concurrences)

H. Miller, RA/W. Axelson, DRA (1)-

C. Anderson, DRP

D. Florek, DRP-

R.Junod,DRP

NRC Resident inspector

Nuclear Safety Information Center (NSIC)

PUBLIC -

!

Distribution w/encis: (Via E-Mail)

B. McCabe, OEDO

R. Capra, PDI-2, NRR

inspection Program Branch, NRR (IPAS)

B. Buckley, NRR f

i

' M.- Thadani, PD 1-2, NRR

R. Correia, NRR

F. Talbot, NRR

M, Campion, ORA

DOCDESK

n

l

!

i

l

f

l-

l

l

!

!

DOCUMENT NAME: G:\ BRANCH 4\ LIM \ LIM 9804. INS

A - To receive a copy of this document, indicate in the box: "C" = Copy without j

attachment /enclosuIe "E" ~= Copy with attachment / enclosure "N" = No copy  ;

OFFICE Rl/pR@ l Rl/DRP .)

NAME DFlj iJdk, \/ CAnderson rjq i

DATE 08/f/98 '

OU (/98

OFFICIAL RECORD COPY

l

.

_a____-__________-_ __