Text
- _ _ _ _ _ _ _ - - _ - _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ - _ - - - - - _. _
Entrgy operations, Inc.
PO Box 756 t
l Port Grbson. MS 39150 Tel 601437 6408 l
Fax 601437 2795 Joseph J. Hagan August 3, 1998 ES207 Grand Gulf Nuclear Station l
U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Response to NRC Request for Additional information Regarding Reactor ?ressure Vessel Integrity at Grand Gulf Nuclear Station l
GNRO-98/00060 l
I Gentlemen:
By letter dated April 27,1998, the NRC staff requested additional information related to reactor pressure vessel (RPV) integrity at Grand Gulf Nuclear Station (GGNS). Specifically the Staff requested that the RPV weld chemistry values that had been previously submitted l
as part of the GGNS licensing basis to be re-evaluated in light of new information presented l
in the BWR Vessel and Internals Project (BWRVIP) report " Update of Bounding Assessment of BWR/2-6 Reactor Pressure Vessel Integrity issues (BWRVIP-46)." The Staff requested that an assessment of this new information be done to determine whether any values of RPV weld chemistry needed to be revised for GGNS. The Staff also requested that if any of the questions included in the Request for Additional Information l
(RAI) did not apply to GGNS that a certification be provided that previously submitted l
evaluations remain valid. The attachment to this letter provides the GGNS response to this request. The rest i of our re-evaluation, which considered the new information from BWRVIP-46, co l,irms that there is no change to previously reported values for the limiting weld material for GGNS. Therefore, the P-T limit curves previously approved by the NRC in t
Amendment 132 of the GGNS Operating License, are still valid and in compliance with 10 CFR 50.55 Appendix G.
}
Yours truly, h
j I
g v
WKH/WBB attachment cc:
(See Next Page j
1 9808070170 980803 "
1 PDR ADOCK 05000416 P
PDR,,
L 2
GNRO-98/00060 page 2 of 2 a
cc:
Ms. J. L. Dixon-Herrity, GGNS Senior Resident (w/a)
{
Mr. L. J. Smith (Wise Carter) (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. E. W. Merschoff (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 for. J. N. Donohew, Project Manager (w/2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 I
L_______________________________________________
GNRO-98/00060
[
Att: chm:nt 1 page 1 of 3 I
Attachment j
l NRC Request for Additional Information, GL 92-01, Revision 1, Supplement 1 I
}
I 1
1.
Assessment of Best-Estimate Chemistry Staff Request:
The staff recently received the BWRVIP " Update of Bounding Assessment of BWR/2-6 Reactor Pressure Vessel Integrity issues (BWRVIP-46)"
Based on this information, in accordance with the provisions of Generic Letter 92-01, Revision 1, Supplement 1, the NRC requests the following-
{
l An evaluation of the bounding assessment in the reference above and its applicability to I
the determination of the best-estimate chemistry for all of your beltline welds. Based upon this reevaluation, supply the information necessary to completely fill out the data 4
requested in Table 1 for each RPV beltline weld material. If the limiting material for your vessel's P-T limits evaluation is not a weld, include the information in Table 1 for the 1
limiting material also.
i GGNS Response:
j The BWRVIP-46 report indicates that a thorough search of the Chicago Bridge & Iron (GGNS RPV fabricator) quality assurance records has been completed by ATI Consulting and General Electric. Also, no additional data was found to change the limiting Ni and Cu values used in previous GGNS RPV integrity evaluations. Table 2-1 of l
BWRVIP-46 indicates that the GGNS Limiting Weld Cu Range is 0.06% and the Limiting j
Weld Ni Range is 1.08%. As indicated by these values, there is no change to previously l
reported values.
)
Table 1 of this response provides the specific information requested by the NRC for each heat of weld material contained in the GGNS RPV beltline region. Based on reviews performed by the BWRVIP and its contractors, the information is unchanged and weld
)
heat number 627260 is still the limiting material. The values listed in Table 1 are those used to develop the P-T Limit curves that were submitted to the NRC and approved via l
Amendment 132 to the GGNS Operating License.
l 1
l l
i l
1 l
l i
l
1
- GNRO-98/00060 Attichm:nt 1 page 2 of 3 2.
P-T Limit Evaluation Staff Requests:
If the limiting material for your plant changes or if the adjusted reference temperature for the limiting materialincreases as a result of the above evaluations, provide the revised P.Tuoy value for the limiting material. In addition, if the adjusted RTuo7 value increased, l
provide a schedule for revising the P-T limits. The schedule should ensure that j
compliance with 10 CFR 50 Appendix G is maintained.
GGNS Response:
t As indicated in 1 above, the newly developed information contained in BWRVIP-46 does not change the chemistry values of weld materials used in the GGNS RPV beltline area.
Therefore, the P-T limit curves approved by the NRC with Amendment 132 to the GGNS Operating License are still valid and in compliance with 10 CFR 50.55 Appendix G. The values for the adjusted RTwor for each beltline weld material are contained in Table 1.
The values listed for weld material heat number 627260 are the same as the values used to develop the P-T limit curves for GGNS.
t I
i i
L L
I
.w _-_ _-_-_
7 3 6 8 R E g
1 1
5 A
5 2 n
ig 5
5 r
8 9 9 8 1
a 7 8 4 8 6 M
0 3
1 4
1 4 2 2
1 1
3 5
5 9
4 1
g.U 8 9 2 9 3 3
0 0
I 7
5 1
1 1
2 g,.U 00 0 0 0 I
l r
a o i 3 n 0 0 0 0 0 ti Tg 3 2 4 6 8 n
R I
g f
n 1
oi n e lub e e e e e diF l
l l
b l
b b omC l
h r
a a a a b
te e TTTTT aMe t
T D
)
yF dl rC a
a ei t
e s
n ri (
r 2
7 1
0 a
1 g e mr 3 4 2 4 2 e
t is a et o
s n
AMh i
c l
Ca le t
F b
V De)
P c
000 0 0 n"
R I
5 5 5 5 5 L e0 S
Olu1 2 2 2 2 2 N
x 0 0 0 0 0 EF(
G G
e h
e t
t l 8 4 2 4 0 o
r t
a e mk) f s
Bi ic%0 0 8 0 0 l
e a
0 tsN(
1 1
1 1
i r
E ta e
m l
g e
n r
i t
t a e) 63 2 3 1
it m p% 0 0 0 0 0 i
s p
m e
Si o( O00 0 0 l
t l
sC l
E a
r e
v o
e 1
r.
e ci o B
1 h
V i W N '0 a
5 t
7 4 9 P
l d n 2 6 2 0 K is 8
l t
6 7 6
1 t
Rel i
s e
P e 7 6 6 7 2 h
l WI 2 2 P 2 2 T
6 6~5 6 4
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE NO. NPF-29 i
DOCKET NO. 50-416 l
(
IN THE MATTER OF l
i ENTERGY MISSISSIPPI, INC.
and SYSTEM ENERGY RESOURCES, INC.
snd SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION and ENTERGY OPERATIONS, INC.
i AFFIRMATION
!, J. J. Hagan, being duly sworn, state that I am Vice President, Operations GGNS of Entergy Operations, Inc.; that on behalf of Entergy Operations, Inc., System Energy Resources, Inc., and South Mississippi Electric Power Association I am authorized by Entergy Operations, Inc. to sign and file with the Nuclear Regulatory Commission, this application; that I signed this application as Vice President, Operations GGNS of Entergy Operations, Inc.; and that the statements made and the matters set forth therein are true and correct to the best of my knowledge, information and belief.
l
/ )
J.'
a an STATE OF MISSISSIPPI COUNTY OF CLAIBORNE SUBSCRIBED AND SWORN TO before me, a Notary Public, in and for the County and State above named, this 3