Mod 120 to Contract NRC-02-97-009
ML20236W614
Person / Time
Issue date: 08/04/1998
From: Meehan B
NRC OFFICE OF ADMINISTRATION (ADM), SOUTHWEST RESEARCH INSTITUTE
To:
References
CON-NRC-02-97-009, CON-NRC-2-97-9 NUDOCS 9808060105
Download: ML20236W614 (5)


Text

_ _. _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _. _. _ _ _ _ _ _,

8 b

3CD AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT g Of 3{

{ A REQUISITION 9URCHASE Rt Q NO 6 PROJECT NO Ut apphcabtel 2 AMENOMENTMODIFICATION NO s EFFECTIVE DATE 120 8/4/98 l NMS-97 009 5/7/98 s.155utD 3Y

. 7 ADwNisTERED SV #t olhos than 4 tem 6)

CODE CODE --

U.S. Nuclear Regulatory Cormiission Division of Contracts and Property Mgt.

Attn: T-7-I-2 Unhington DC 20555 i

8 NAME AND ADDRESS OF CONTRACTOR (No., etteet. county. state and zip Code)

(X) 9A AMENDMENT oF SOUCITAflON NO se DATEo(SEE ITEM HI Southwest Research Institute 6220 Culebra Road, PO Drawer 28510 toA. MOomATION OF C NTRACToHDER NO L C atri s dent, CNWRA 210-522 5158 TIN # 74-1070544 -

Con # NRC-02-97 009 10B. DATED (SEE ITEM 131 CooE

[r ACitrTY CODE X

10-15 1987

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended [is not extended.

Off,rs must acknowledge receipt of this amendment pnor to the hour and date specified in the solicitation or as amended, by one of the following methods:

(I) By completing items 8 and 15, and returning copies of the amendment; tb) By acknowledging receipt of this amendment of each copy of the offir submitted, or ic) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solic. station and this amendment, and is received prior to the opening tour

__ argfate specified.

12 ACCDuNTING AND APPROPRIATION DATA tit eequired) tuA

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFjES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

IX)

A. THis CHANGE ORDER 15 ISSUED PURSUANT TO LLpecify austentyl THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON?RACT ORDER NO, IN ITEM 10A.

B THE ABOVE NUMBERED CONTRACTIORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES isuch as changes in paymg office, appropnanon date, etc.)

SET foRTH IN ITEM 14. PURSUANT TO THE AUTHORITY OF F AR 43103M C THGs SUPPLEMENTAL AGREEMENT IS ENTERED INTO NRSUANT TO AUTHOftlTY OF:

D. OTHER ($pecely type of mndshcahon end author <tyl

@ is not, is required to sign this document and return copies to the issuing office.

E. IMPORTANT: Contractor is DESCRIPTION OF AMENDMENT /MODIFICAftON forganized by UCF seccon headmgs. mcludmg sehenanon/ contract subject metter where taasible.)

Please see attached.

m 0l Y

DIO E c.,pt es previoses herem, all teems end conditsons of the document referenced on item 9A or 10A. as heretofore changed, semains unchanged and en tull fort.e and effect ISA fGME AND TITLE OF slGNER (Type et pnnt) 16A NAME AND TITLE OF CONTRACTING OFFICER 0 ype or pnnt)

Barbara D. Meehan 16C. DAtt SIGNED 153 CONTRACinR/OrFrHOR 15C. DATE $1GNED 16.g TfD ST ATEs OF AMERICA e'.2CSM,s..A_4U, b_,am.n, 0,,.ce,,

A ml t< qP dE L

n L

+

ne eo C

.e o,..; eon._ed to..n, sT ANDARD FORM 30 IRE V.10 83) 9800060105 900004 (rEJ J ONJR _

l Description of Changes Incorporated by Modification No 120 to NRC-02-97-009 Page 2 The purpose of this modification is to change the names of some of the Program Element Managers and Project Officers. Accordingly, the following changes are made:

Section G.3.1.C is revised to change the name of the Program Element Manager for the Total System Performance Assessment and Technicalintegration Element, the DOE Aluminum-Based Spent Nuclear Fuels Disposition Program Operations Plan and the Container Life and Source Term Element, and to change the name of the Project Officer for Quality Assurance as shown on the attached change pages 28 and 29.

All other terms and conditions of this contract, including the ceiling amount for the second renewal period of $87,611.477.00, remain the same.

A summary of new obligations for the second renewal period of this contract is given below:

Job Code D1035 (HLW)

Total FY97 Obligation amount S445,000 (see Spent Fuel (CIS) below)

Total FY98 Obligation amount S10.773.270 Cumulative Total of NRC Obligations for JC 1035 (HLW) S11.218.270.

1 l

Job Code D1035 (Spent Fuel (CIS))

Total FY97 obligation amount S200,000 Total FY98 obligation amount 5250,000 Cumulative Total of NRC Obligations for JC 1035 (SP CIS) 5450,000.

Job Code J5164 (Tand Waste Remediation) l Total FY98 obligation amount $250,000 Cumulative Total of NRC Obligations for JC J5164 5250,000.

Job Code J5206 (Spent Fuel Dry Transfer)

Total FY97 obligation amount $25,000.

l Total FY98 obligation amount $200,000.

Cumulative Total of NRC Obligations for JC J5206 5225,000.

o Descnption of Changes incorporated by Modification No 120 to NRC-02-97-009 Page 3 Job Code J5210 (Aluminum-Based Spent Fuels)

Total FY98 obligation amount $125,000.

Cumulative Total of NRC Obligations for JC J5210 $125,000 Job Code J5186 (TMI-2 Fuel Debris)

Total FY98 obligation amount $175,000.

Total FY98 deobligation amount S8,000.

Cumulative Total of NRC Obligations for JC J5186 $167,000.

Job Code J5226 (Private Fuel Storage)

Total FY98 obligation amount $158,000 Cumulative Total of NRC Obligations for JC J5226 S158.000 This modification does not obligate new funds.

l

)

l 1

I NRC-02-97-009 Modification No 120 '

Page 28 C.

The NRC PEMs POs and areas of work for which they are designated are as follows:

COPS /KTl Subtasks Erogram Element Manager Project Officer Management, Planning, Deborah DeMarco None and Computer Support (Subtask 158)

I-l Quality Assurance Deborah DeMarco Ted Carter (Subtask 159) l Igneous Activity John Trapp None (Subtasks 461,462) q Structural Deformation &

Philip Justus None Seismicity (Subtasks 471,472)

Evolution of Near-Field Bret Leslie None Environment (Subtasks 561. 562)

Container Life & Source B. Jennifer Davis None Term (Subtasks 571,572)

Thermal Effects en Flow Jeffrey Pohle None (Subtask 661)

Repository Design & Thermal-mechanical Effects Banad Jagannath None (Subtask 671)

TSPA & TechnicalIntegration James Firth None Consolidated Document System (Subtasks 761,762,763. 764)

Revision to EPA and NRC Timothy McCartin None Regulations (Subtask 771) l-Isothermal Flow Neil Coleman None (Subtasks 861,862,864)

Radionuclides Transpod John Bradbury None (Subtask 871)

, - -.w.

NRC-02-97-009 i

Modification No.120 '

f Page 29 Waste Solidification Systems Jack Parrott None (Operations Plan)

Hanford Tank Waste System Michael Tokar (Operations Plan)

Subtask 3.1.1 and 3.1.6 Amy Bryce Subtask 3.1.2 Robert Shewmaker

. Subtask 31.8 Robert Lewis Subtasks 3.1.3, 3.1.4, and 3.1.5 Rex Wescott Subtask 3.1.7 John Spraul Spent Fuels Project Office Mark Delligatti (Operations Plan)

TMI 2 Fuel Debris Michael Radda*z Dry Transfer System Michael Raddatz Central Interim Storage Michael Raddatz Private Fuel Storage None DOE Aluminum-Based Spent Nuclear Fuels Disposition Program (Operations Plan)

Richard Weller None G.3.2 - Technical Assistance HLW and TWRS,Sconsors A.

The individuals listed in "C" below are hereby designated as Technical Assistance HLW and TWRS Sponsors The individual Technical Assistance HLW and TWRS Sponsors have overall technical responsibility for the work placed at the CNWRA, within their respective 1

areas, as detailed in paragraph C. below and are responsible for: (1) identifying, prioritizing and recommending work to be placed at the CNWRA; (2) monitoring the CNWRA's progress to ensure that work completed is commensurate with resources expended and is on schedule including surveillance and assessment of performance, and recommending to the NRC CO changes in requirements; (3) interpreting the scope of work as required; (4) performing technical evaluations a:

necessary; (5) performing technical reviews and acceptances as required; and (6) j assisting the CNWRA in the resolution of technical problems encountered during performance. Within the purview of this authority the Technical Assistance Sponsors are authorized to resiew all costs requested for reimbursement by the CNWRA which are associated to their particular program area and submit recommendations for approval, disapproval, or suspension for supplies / services j

required under the contract to the NRC CNWRA PM. The NRC CO is responsible 1

for directing or negotiating any changes in terms, conditions, or amounts cited in the contract and elements.

B.

The Technical Assistance Sponsors are not authorized to approve or request any action which results in or could result in an increase in contract cost or terminate the contract, settle any claim or dispute arising under the contract or issue any unilateral directive whatsoever.