ML20236W587
| ML20236W587 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 12/03/1987 |
| From: | Silady J COMMONWEALTH EDISON CO. |
| To: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20236W589 | List: |
| References | |
| 3912K, NUDOCS 8712080100 | |
| Download: ML20236W587 (2) | |
Text
-
fm( Commonwealth Edison
- ~
) E Ora First National Plaza. Chicago, Illiriois
.. l'
.4
(
J ' Addr:ss Reply to: Post Office Box 767'-~
- p Nj ' Chicago, Illinois 60690 - 0767
- 1, Decembe'r:3,J1987 ID j
s ff'
,l
'b ll s..g.
~
i
^ UI."Ep a
- Mr.-A. Bert Davis
(/ i j
')
' Regional Administrator-ll
-.U.S. Nuclear' Regulatory Commission:
]
Region III
.799 Roosevelt! Road
- Glen Ellyn, IL 60137
'd')'l 7
Subject:
Quad. Cities Station Units 1 and 2a Revisions to the Safe Shutdown-Report and Fire Hazards.' Analysis NRC' Docket Nos. 501 54 and 50-265 2
~
Reference:
Letter from I.M. Johnson:to'A.B. Davis dated July 23,'1987 q
i o
Dear:
Mr. Davis:
' Enclosed is a copy of the revised pages to the Quad Cities safe Shutdown' Report and Fire. Hazards l Analysis.
These documents'were;previously; transmitted (as enclosures to the Reference) to you and Region'III:in'.,
j preparation for the Appendix R compliance audit,Dwhich is'now scheduled for December'14-18, 1987 These pages include revisions l.to:
- 1) Hot shut <',wn cable discrepancy list Appendix A
- 2) Spurious, operation analyses.- Section'5 and Appendix B.
- 3) Associated circuits - Section 3.3
- 4) Manual actions - Section 7.3
- 5) Timelines - Section 7.2 t.
l _:
- 6) Equipment lists - Section;3.1~.
?.
,y
- Appendix A was revised to incorporate modifications-installed lduring:,.
q L
the last year. These changes required' updating ofLthe'.manualfactionilist.
Our' pre-audit review required revision'to the spurious; operation analyses,.
8712080100 871203 h
S y.
PDR.ADOCK 05000254 J
..-i,..
I, p
PDR a
~
A l<
g0 l) a'g OL n
a?
3
f-'
/
y/
l 1
A.B. Davis December 3, 1987 associated circuits discussion, and the timelines for reactor water makeup.
Lastly, the equipment lists were updated to include all Appendix R equipment.
Previously, the lists included only electrically operated equipment. Also, control instrumentation was eliminated from the list since credit is not taken for this' instrumentation and changes were made to the reactor level instrumentation as a result of the pre-audit review.
Please contact this office should further information be required.
Very truly yours, d
J. A. Silady Nuclear Licensing Administrator 1m 1
l Enclosure I
cc:
T. Ross - NRR (w/ Encl)
T. Murley - NRR Director (w/o Encl)
J. Holmes - RIII (w/ Enc 1, 2 sets) j Quad Cities Resident Inspector (w/o Encl) l l
1
)
i l
t l
3912K l
l
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _