.I g-4' W44.F CREEK NUCLEAR OPERATING CORPORATION x
Bart D. Withers Presidertt and Chief Executive omcor December 1,1987 WM 87-0324 U. S. Nuclear Regulatory Commission l
ATTN: Document Control Desk Washington, D. C. 20555
Reference:
Letter dated November 2, 1987 from L. J.-Callan, NRC, to B. D. Withers,.WCN00
Subject:
Docket No. 50-482. Response to Violation 482/8722-01 Gentlemen:
Attached is a detailed response to
/iolation 482/8722 which.was documented in the Reference.
Violation 482/8722-01 concerns a failure' to perform a surveillance in accordance with the procedure which requires.the electric motor driven fire pump be alternately started from the control' room and local panel.
If you have any questions concerning this matter, please contact me or Mr..
O. I.. Maynard of my staff.
l l
Very truly yours,
.i Y
JL2 Bart D. Withers l
President and Chief Executive Officer BDV/jad Attachment i
i ocs J. E. Cummins (NRC), w/a l
C. A. Hackney (NRC), w/a R. D. Martin (NRC), w/a 1
P. V. O'Connor (NRC)', 2 w/a I
. 1 8712080096 871201 PDR ADOCK 05000482 0
PDR I
I P.O. Box 411/ Burlington, KS 66839 / Phone: (316) 364-8831 An Equal opportunny Employer M/F/HC/ VET f
g i
________._u.___.___
Attachment to VM 87-0324 Page 1 of 2 December 1, 1987 Violation (482/8722-01): Pailure to Perform Surveillance in Accordance with Procedures Pinding Technical Specification (TS) 6.8.1 requires that,
" Written procedures shall be established, implemented, and maintained covering...a..
The. applicable procedures recommended in. Appendix A of RG 1 33, Revision 2,
.Pebruary 1978." Section 8 of Appendix A of RG 1 33 states that activities.related to surveillance tests should be covered by written procedures.
Administrative Procedure ADM 02-300, Revision 8, " Surveillance Testing," and j
Surveillance Test STS PP-602, Revision 5, '" Electric Motor Driven Pire Pump.
1PP01PA - Monthly Operation" had been established and ' implemented in accordance with the above TS.
Sections 5.2 and 5.3 of STS PP-602 required that'the electric mot'or driven fire pump be started using the switch on the local panel during the monthly
~
tests for January, March, May, July, September, and November.
Daring the alternate months the procedure required that the pump should be started from the control room.
Contrary to the above, during'the' performance of Surveillance. Test STS PP--
602, Revision 5,
" Electric Motor Driven Fire Pump 1PP01PA
~ Monthly Operation,
" on April 1, 1987, the pump was started from the control room and was not started again from the control room during the performance of the surveillance test until August 1, 1987.
Reason Por Violation:
STS PP-602 had been performed on May 1, 1987, which' started the electric motor driven fire pump from the local panel as required by sections 5 2 ' and 5.3 of the surveillance procedure.
The monthly test was next scheduled bo be performed on June 1,
- 1987, which would have started the pump from the control room. On May 30, 1987, control room. personnel decided it was a good time to perform STS PP-602 instead of waiting until, June 1, 1987, when it was scheduled. They subsequently performed the surveillance, tfollowing the procedural requirements to start the pump locally.in the ' month of: May.
~The:
surveillance was next performed on July 1, 1987, which again required starting the pump locally.
i The reason for this violation is a failure of control room personnel-to recognize that performance of the surveillance two days early would result' q
in two consecutive starts from the local panel, j
i a
-l 1
1 1
_--Q
l
\\
Att'adhment to VM 87-0324
' age 2 of 2 j.
?
fi December 1, 1987 g,
1 1
t
/
,y(
Correottve Steps VMeh Have Been Teken and Results Achieved:-
S.
Surveillance pro ddure STS PP-602,
" Electric Motor Driven Fire Pump 1FP01PA l:"
- Monthly Operation" has been rescheduled by the operations surveillance-
/ \\
coordim!or to be~ performed on 4he fifteenth day of each month instead of
,A the ftrat day of each month.
Ren6heduling the performanceLdate of this survoi.11ance wi1I4 ensure-the 37ece6yre is performed during the' month it is-schedtled.
>a.
r..
.1
,1 l
Corrective Sttge Which Vill 1% sTaken.Th < Avoid Further Violations:
~~
~
m.
..'k I
/~
g L
N To ensure the' monthly surveillance is performed during'. each month 'of.
the=
l cale%q yesr, 'its performance date has.been changed from the first of each
(
mon.4 to t he> fif teenth of each month.
Thip will prevent consecutive starts form the dtme location in the event the surveillance.is performed early.
Date When Pall Compliance Wil.1.Be Achieved:'
Pullcomhlianedhasbeenachihved.
i.,
s,.
,. i N u\\,
g g
4 i
i
\\
v 3
I
,1 4.,.
f
)I 1,.
g l
N
.f W g l
l l q l
k
(
1
\\
\\
v
'J k
3 i
- r. N.
J y
F,
.1 r
% /
g, k
),1-1 i
rl t
s
, \\..
i k
N
,I J'
'q,4
.c
- (.
. 7, x
)
a-
, n, x
e
-