Text
t l
l i
1, maine 9ankee i
j Mcar7 t h 1 y Statistical R e p ca r-t f= car-A ug u nst 1997 8712080029 870831 PDR ADOCK 05000309 I}s\\s R
. _ ; j
,~
a l
50-309-l OPERATING ~ DATA. REPORT Dockst'No.:
Dates.
02/Sep/87:
Completed By.
J.MJ TAYLOR Telephone:
207-882-6321:
l
>1.
Unit Name.......................................
Maine' Yankee'
-j
- 2. Reporting Period................................
Auaust 1987-j
- 3. Licensed' Thermal Pcwer (MWt)....................
-2630
- )
4.
Nameplate. Rating (Gross MWe)....................
864
- 5. Design Electrical Rating (Net MWe)..............
825-f6. Maximum Dependable Capacity (Gross'MWe).........
850 7.- Maximum Dependable Capacity (Net MWe)...........-
810
.)
8.'If. Changes in Capacity Ratings (Items' Number 3-7)-
~j I
Since Last~ Report,.Give Reasons:
NO CHANGES 1
L i
J i
- 9. Power Level to Which Restricted, ifcAny (Not MWe) 93 % -
- 10. Reasons' f or Restrictions, if Any:
Low oressure-turbine THIS MONTH YEAR-TO-DATE-CUMULATIVE 1 1..
Hours In Reporting Period 744.00 5.831.00
- 12. Number of Hours Reactor q
Was Critical...........
219.37 2.795.43 102.924.32
- 13. Reactor Reserve Shutdown Hours..................
0.00 0.00 0.00
- 14. Hours Generator On-line..
179.73 2.4B6.'39
-99.826.08-
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00' O.OO
- 16. Gross Thermal Energy Generated (MWH)........
392.784.00 5.494.633.00 226.751'.945.00
- 17. Gross Electrical Energy 74.400.530.00' Generated (MWH)........
123.790.00 1.779.520.00
- 18. Net Electrical Energy 71.140.854.00 l
Generated (MWH)........
119.180.00 1.712.783.00-
- 19. Unit Service Factor......
24.16 42.64 76.90
- 20. Unit Availability Factor.,
24.16 42.64-77.60
- 21. Unit Capacity Factor y
(Using MDC Net)........
19.78 36.26 L69.30
- 22. Unit Capacity Factor 1
67.51 (Using DER Net)........
19.42 35.60
- 23. Unit Forced Outage. Rate..
75.67 35.21 7.51 q
- 24. Shutdowns Scheduled Over Next 6 Months:
NONE i
1
- 25. If Shutdown at End of Report Period,. Estimated Date of1Startups-N/A-I l
- )
a 3
t
L 1
l Dockot No 50-309 Unit Names.
. Maine Yenkee l
Date:
01/Sep/87' Completed.By: J.M.-Taylor
-Telephone:
207-882-6321 i
Report Month: August, 1987 NARRATIVE
SUMMARY
OF. OPERATING EXPERIENCES:
1 At the beginning of the. month,the~ unit'was in a cold shutdown!
condition f or main turbine-repair.
On;22 August cotamenced. reactor startup.
~
On'24 August the unit was phased to the grid..The unit was taken commenced.-
j off-line and the turbine balanced. The unit was'rephased and? loading.
]
On 26 August power. was ' held at : 88% whil e. mymetric. of f set. calibrat:
-ion was completed.: Loading was resumed..
On 27 August power-was held at-96% for. data collection.
On 28 August loading resumed.
At the end of the month power was at.98%.
+
j
.)
i
!.i 1
'l s
e
' AVERAGE DAILYJUNIT POWER LEVEL FDR AUGUST 1987 Docket No.:"
'50-309 Unit:
Maine Yankee Date:
'01/Sep/87 Completed By:
J.M.
TAYLOR Telephone:
207-882-6321 Day' Avg. Daily Power Level Day Avg. Daily-Power Level-1
.(MWe-Net)
(MWe-Net)
H
]
1 O
16 0.
i 2
O 17 O
3 O
18 O
i,
,i 0
4 O
19 5
O 20 O'
6 O
21 O
1 1
O I
7 O
.Z2 8
O 23' O'
9 O-24 50.
10 O
25 381 1
11 O
26 638.
1 1
12 0
27 763 13 O
28-775 14 O
29 784 1
i 15 O
30 784.
i I
...................1 791:
i i
i I
I
UNIT SHUTDOWNS AND POWER REDUCTIONS DockGt No.:
50-309 FOR AUGUST 1987 Units Mnin] YcnkO3 Date:
02/Sep/87 Completed By:
J.M.
TAYLOR Telephone:
207-882-6321 Page:
'1 of 1 Nurber 24-87-10 25-87-10 Dnto 870718 870824 Typa (1)
F S
Duretion (Hours) 558.9 5.4 R]cron (2)
B B
M2thod (3) 1 1
LER #
N/A N/A System Cod] (4)
HA HA Component Coda (5) turbin turbin main turbine main turbine vibration vibration Ccuee and Corrective Action 1.
TYPE:
2.
REASON: (cont) 4.
SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)
Entry Sheets for 2.
REASON Licensee Event Report A-Equipment Failure 3.
METHOD:
(LER) File (NUREG.0161)
B-Maintenance or Test 1-Manual C-Refueling 2-Manual Scram 5.
COMPONENT CODE:
D-Ragulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &
4-Other (Explain) as above.
License Examination
y MaineYankee r
FIELIABLE ELECTRICITY FOR MAINE SINCE 1972 EDISON DRIVE. AUGUSTA, MAINE 04330. (207) 622-4868 q
i
(
j NT September 8,.1987 MN-87 GDH-87-214 Office of' Resource Management United States Nuclear Regulatory Commission
.Hashington, D. C.
20555 Attention:-
Mr. Richard A. Hartfield,. Chief.
l Management Information Branch j
f
References:
(a)
License No.. DPR (Docket No. 50-309) l-
-(b) NUREG-0020, Licensed Operating Reactors Status Summary Report
Subject:
Maine Yankee Monthly Statistical Report Gentlemen:
Enclosed you will find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for August,1987.
Very truly yours, MAINE YANKEE
(
bfW l
G. D. Whittier, Manager
- Nuclear Engineering and Licensing ~
GDH/bjp Enclosure
- g cc
- Mr. Victor Nerses M
Mr. Hilliam T. Russell 9@
Mr. Pat Sears
-i Mr. Cornelius F. Holden 4
1 se
>\\
N l
9126L-LM0 1
-_ _ ___.- I O