MONTHYEARML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17335A5201999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp Unit 1.With 990208 Ltr ML17335A5191999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp,Unit 2.With 990208 Ltr ML17335A4831998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 2.With 990108 Ltr ML17335A4841998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 1.With 990108 Ltr ML17335A3951998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 2.With 981207 Ltr ML17335A3941998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 1.With 981207 Ltr ML17335A3331998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Plant,Unit 1.With 981105 Ltr ML17335A3381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Power,Unit 2.With 981105 Ltr ML17335A2931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 2.With 981005 Ltr ML17335A2941998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 1.With 981005 Ltr ML17335A2131998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 2.W/980903 Ltr ML17335A2151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 1.W/980903 Ltr ML17335A1741998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 2.W/980806 Ltr ML17335A1731998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 1.W/980806 Ltr ML17334B8171998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Plant Unit 2.W/980706 Ltr ML17334B8131998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Station,Unit 1.W/980706 Ltr ML17334A7511998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 2.W/980609 ML17334A7521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 1.W/980609 Ltr ML17334B7921998-04-30030 April 1998 Addendum to Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Station,Unit 2 ML17334B7721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Plant,Unit 1.W/980506 Ltr ML17334B7911998-03-31031 March 1998 Addendum to Monthly Operating Rept for Mar 1998 for DC Cook Nuclear Plant,Unit 2 ML17334B7171998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980407 Ltr ML17334B7181998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980407 Ltr ML17334A6831998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980309 Ltr ML17334A6811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980309 Ltr ML17334B7901998-02-28028 February 1998 Addendum to Monthly Operating Rept for Feb 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6481998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2.W/980209 Ltr ML17334B7891998-01-31031 January 1998 Addendum to Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6051997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 2 ML17334A6021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 1.W/980108 Ltr ML17334B6711997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 2.W/971208 Ltr ML17334A6061997-11-30030 November 1997 Revised Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Station,Unit 2 ML17334B6651997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 1.W/971208 Ltr ML17333B1421997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Donald C Cook Nuclear Plant,Unit 1.W/971110 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17335A5641999-10-18018 October 1999 LER 99-024-00:on 990708,literal TS Requirements Were Not Met by Accumlator Valve Surveillance.Caused by Misjudgement Made in Conversion from Initial DC Cook TS to W Std Ts.Submitted License Amend Request.With 991018 Ltr ML17335A5531999-10-0707 October 1999 LER 99-023-00:on 990907,inadequate TS Surveillance Testing of ESW Pump ESF Response Time Noted.Caused by Inadequate Understanding of Plant Design Basis.Surveillance Tests Will Be Revised & Implemented ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5481999-09-30030 September 1999 Non-proprietary DC Cook Nuclear Plant Units 1 & 2 Mods to Containment Sys W SE (Secl 99-076,Rev 3). ML17335A5451999-09-28028 September 1999 Rev 1 to Containment Sump Level Design Condition & Failure Effects Analysis for Potential Draindown Scenarios. ML17326A1291999-09-17017 September 1999 LER 99-022-00:on 990609,electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads,Was Discovered. Caused by Lack of Understanding of Design of Plant.No Immediate Corrective Actions Necessary ML17326A1481999-09-17017 September 1999 Independent Review of Control Rod Insertion Following Cold Leg Lbloca,Dc Cook,Units 1 & 2. ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1121999-08-27027 August 1999 LER 99-021-00:on 990728,determined That GL 96-01 Test Requirements Were Not Met in Surveillance Tests.Caused by Failure to Understand Full Extent of GL Requirements. Surveillance Procedures Will Be Revised or Developed ML17326A1011999-08-26026 August 1999 LER 99-020-00:on 990727,EDGs Were Declared Inoperable.Caused by Inadequate Protection of Air Intake,Exhaust & Room Ventilation Structures from Tornado Missile Hazards. Implemented Compensatory Measures in Form of ACs ML17326A0911999-08-16016 August 1999 LER 99-019-00:on 990716,noted Victoreen Containment Hrrms Not Environmentally Qualified to Withstand post-LOCA Conditions.Caused by Inadequate Design Control.Reviewing Options to Support Hrrms Operability in Modes 1-4 ML17326A0771999-08-0404 August 1999 LER 98-029-01:on 980422,noted That Fuel Handling Area Ventilation Sys Was Inoperable.Caused by Original Design Deficiency.Radiological Analysis for Spent Fuel Handling Accidents in Auxiliary Bldg Will Be Redone by 990830 ML17335A5461999-08-0202 August 1999 Rev 0 to Evaluation of Cook Recirculation Sump Level for Reduced Pump Flow Rates. ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0741999-07-29029 July 1999 LER 99-018-00:on 990629,determined That Valve Yokes May Yield Under Combined Stress of Seismic Event & Static,Valve Closed,Stem Thrust.Caused by Inadequate Design of Associated Movs.Operability Determinations Were Performed for Valves ML17326A0661999-07-26026 July 1999 LER 99-017-00:on 990625,noted That Improperly Installed Fuel Oil Return Relief Valve Rendered EDG Inoperable.Caused by Personnel Error.Fuel Oil Return Valve Was Replaced with Valve in Correct Orientation.With 990722 Ltr ML17326A0651999-07-22022 July 1999 LER 98-014-03:on 980310,noted That Response to high-high Containment Pressure Procedure Was Not Consistent with Analysis of Record.Caused by Inadequate Interface with W. FRZ-1 Will Be Revised to Be Consistent with New Analysis ML17326A0491999-07-13013 July 1999 LER 99-016-00:on 990615,TS Requirements for Source Range Neutron Flux Monitors Not Met.Caused by Failure to Understand Design Basis of Plant.Procedures Revised.With 990713 Ltr ML17326A0331999-07-0101 July 1999 LER 99-004-01:on 971030,failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed Was Noted.Caused by Ineffective Mgt of Tss.Chemistry Personnel Have Been Instructed on Requirement to Follow TS as Written ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0151999-06-18018 June 1999 LER 99-014-00:on 990521,determined That Boron Injection Tank Manway Bolts Were Not Included in ISI Program,Creating Missed Exam for Previous ISI Interval.Caused by Programmatic Weakness.Isi Program & Associated ISI Database Modified ML17325B6421999-06-0101 June 1999 LER 99-013-00:on 990327,safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Have Led to ECCS Pump Failure.Caused by Inadequate Original Design Application of Si.Throttle Valves Will Be Developed ML17325B6311999-06-0101 June 1999 LER 99-S03-00:on 990430,vital Area Barrier Degradation Was Noted.Caused by Inadequate Insp & Maint of Vital Area Barrier.Repairs & Mods Were Made to Barriers to Eliminate Degraded & Nonconforming Conditions ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17325B6351999-05-28028 May 1999 LER 99-S02-00:on 990428,vulnerability in Safeguard Sys That Could Allow Unauthorized Access to Protected Area Was Noted. Caused by Inadequate Original Plant Design.Mods Were Made to Wall Opening to Eliminate Nonconforming Conditions ML17265A8231999-05-24024 May 1999 LER 98-037-01:on 990422,determined That Ice Condenser Bypass Leakage Exceeds Design Basis Limit.Caused by Pressure Seal Required by Revised W Design Not Incorporated Into Aep Design.Numerous Matl Condition Walkdowns & Assessments Made ML17325B6001999-05-20020 May 1999 LER 99-012-00:on 990420,concluded That Auxiliary Bldg ESF Ventilation Sys Not Capable of Maintaining ESF Room Temps post-accident.Caused by Inadequate Control of Sys Design Inputs.Comprehensive Action Plan Being Developed ML17325B5861999-05-10010 May 1999 LER 99-002-00:on 990415,discovered That TS 4.0.5 Requirements Were Not Met Due to Improperly Performed Test. Caused by Incorrect Interpretation of ASME Code.App J Testing Will Be Completed & Procedures Will Be Revised ML17325B5811999-05-0404 May 1999 LER 99-011-00:on 990407,air Sys for EDG Will Not Support Long Operability.Caused by Original Design Error.Temporary Mod to Supply Makeup Air Capability in Modes 5 & 6 Was Prepared ML17325B5771999-05-0303 May 1999 LER 99-010-00:on 990401,RCS Leak Detection Sys Sensitivity Not in Accordance with Design Requirements Occurred.Caused by Inadequate Original Design of Containment Sump Level. Evaluation Will Be Performed to Clearly Define Design ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5581999-04-16016 April 1999 LER 99-006-00:on 990115,personnel Identified Discrepancy Between TS 3.9.7 Impact Energy Limit & Procedure 12 Ohp 4030.STP.046.Caused by Lack of Design Basis Control.Placed Procedure 12 Ohp 4030.STP.046 on Administrative Hold ML17325B5471999-04-12012 April 1999 LER 99-009-00:on 990304,as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit Occurred.Cause Investigation for Condition Has Not Been Completed.Update to LER Will Be Submitted,Upon Completion of Investigation ML17325B5321999-04-0707 April 1999 LER 99-S01-00:on 990308,discovered That Lock for Vital Gate Leading to Plant 4KV Switchgear Area Was Nonconforming & Vulnerable to Unauthorized Access.Caused by Inadequate Gate Design & Inadequate Procedures.Mods Are Being Made to Gate ML17325B5161999-04-0101 April 1999 LER 99-007-00:on 981020,calculations Showed That Divider Barrier Between Upper & Lower Containment Vols Were Overstressed.Engineers Are Currently Working on Analyses of Loads & Stress on Enclosures ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5221999-03-29029 March 1999 LER 99-001-00:on 960610,degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations,Identified on 990226.Caused by Inadequate Understanding of Design Basis.Additional Investigations Ongoing ML17325B4801999-03-18018 March 1999 LER 99-004-00:on 971030,failure to Perform TS Surveillance Analyses of Rc Chemistry with Fuel Removed Was Noted.Cause of Event Is Under Investigation.Corrected Written Job Order Activities Used to Control SD Chemistry Sampling ML17325B4741999-03-18018 March 1999 LER 99-005-00:on 940512,determined That Rt Breaker Manual Actuations During Rod Drop Testing Were Not Previously Reported.Caused by Lack of Training.Addl Corrective Actions,Including Preventative Actions May Be Developed ML17325B5671999-03-0202 March 1999 Summary of Unit 1 Steam Generator Layup Chemistry from 980101 to 990218. ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17325B4571999-02-24024 February 1999 LER 99-003-00:on 990107,CR Pressurization Sys Surveillance Test Did Not Test Sys in Normal Operating Condition.Caused by Failure to Recognize Door 12DR-AUX415 as Part of CR Pressure Boundary.Performed Walkdown of Other Doors 1999-09-30
[Table view] |
Text
_----
p-N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 l
DATE F/3/87 COMPLETED BY CLIMER TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2 -----------------------
- 2. Reporting Period AUG 87 l notes l
- 3. Licensed Thermal Power (MWt) 3411 ! l
- 4. Name Plate Rating (Gross MWe) 1133 l l
- 5. Design Electrical Rating (Net MWe) 1100 l l S. Maximum Dependable Capacity (GROSS MWe) 1100 l l
- 7. Maximum Dependable Capacity (Net MWe) 1060 -----------------------
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions. If Any:
This Mo. Yr. to Date Cumm.
- 11. Hours in Reporting Period 744.0 5831.0 84719.0 626.8 4316.6 58905.9
- 12. No. of Hrs. Reactor Was Critical 0.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours 626.5 4293.9 57537.2
- 14. Sours Generator on Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 1485651 11237287 176928491
- 16. Gross Therm. Energy Gen. (MWH) 57783600
- 17. Gross Elect. Energy Gen. (MWH) 445290 3565560
- 18. Net Elect. Energy Gen. (MWH) 422137 3406204 55641040 84.2 73.6 69.9
- 19. Unit Service Factor 84.2 73.6 69.9
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net) 53.5 55.1 63.8
- 22. Unit Capacity Factor (DER Net) 51.6 53.1 62.3
- 23. Unit Forced Outage Rate 0.0 24.8 15.5
- 24. Shutdowns Schedulad over Next Six Months (Type,Date,and Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
Est. rnenrn em enrvice is Unir cnvrnntiv a,, e wm rm mn i n e nn nn c n /su rv e ul a n n n nuengo
- 26. Units in Test Sta tus (Prior to Commercial Operation): 10-2-87.
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION h
a>
y(I 1
, \\
8712070413 870831 PDR ADOCK 05000316 R PDR
- - - - - - - - - - - - - _ ___a
3 .
', ' AVERAGE DAILY' POWER LEVEL (MWe-Net) 4 DOCKET NO. 50-316 '
' UNIT. . TWO DATE 9/3/87 COMPLETED BY. -CLIMER TELEPHONE 616.-465-5901 MONTH- AUG 87 AVERAGE DAILY .
AVERAGE DAILY POWER LEVEL. DAY- POWER LEVEL' DAY 668 17 816 1-502 18 817 2
769 19 816-3 783 20 814 4
822 21 814 5
818 22 813 6
800 23 818 7
364 24 818.
8
- 306 25 821 9
435 26 792 10 455 27 15 11 463 28 0 22 0 13 462 29 457 30- 0
- 14 '
514 31 0 15 16 816 l
l I
9
k . 5 8 ee 8 h niin oot l c t M
o t6 sh ul no o S4 mrnt mrr ii tb a h e e
(
6C7 oee oeeermt rs sh e a ee s s el si 1 8 . ) rsd% uh p me nF 3 . - L6 f nn0 f nnT wod hl ae I eo8 ee ot a d t m el kM 0 C. 8-1 dd c ddd p r u c
. 6 en o enn .
- d. g nt p nsIF e e 5D9J( e e
e c coh t coos % ee wa s s af(
nI i
l n uct uccr0 sd oht n e i.ksa t
e d t n s O. EEyE t e nse d ud d e8 o e n eeoe eens pe t a ep c
N MTmN s
s e e Gahe s
i rt i nemb usl A DAl l 0 0 Ceamec rtSi a - r r
aaehi u h no e p T NI E El &uR st A u st md t t soo W re$ys) N KG T Tf E t. eAn t e e
ai wli ee t ai wll n
oo1 r y
yt i c h
e Pe n1 n se sv1 t e6 M' N t
- R s e v h r il ct eo rar EfEE0 e
WI rE eT s
a e rct rca vt ac o B ts C r e
ea s ea pd i a n it 1 w f na wf nme t r o d c na 4 5
( o p o ow .
o po ounpr ae rn i
t i e t gt y t gd u t e u g r r nia r net s g . a o %i nd o% i ee i 6 c e ih ne t 0 nu t0 nf r nm1 r d t c 4 a e c4 a ia8 a
e ol h a eem a eo ed s l na me0 d t7 p n in R t cT s R t caw as8 A f o e
S s s
N Z Z Z at I
M Z Z Z Z
nt a
aSl
. e ina 1
7 - gP5 43O Z Z
Z Z Z e ci c m p
M Z Z Z SsE M 8 Z n Z Z I
E 9 :
ae s(
ll e amniene l
1 R he e s as nte hh M T eMMA g1U S Z e 4 E 2Z U Z MI234 T
M G GEN Z Z
( U [
P Ag 3 t
i i " '
N f N
A p
- g S e i e s n e r N t s n e i '
A e W T e c s p A / t m
/
D R k il e N a Wt O i R N L
h s
I P ea E h IR O
R m a
S m:
T . UMg6 )
I N
I "c n e I
"tg5$; 4 4 1 i a
s n
e I
m ek E nI ke B A (t
e es c&
}$2 E li i
mT i g en ui a
Fe c e
s en Rae t
5 t yI -
g* 7 ns e e gn e
O 0 mneNah ns n e j 1 1 : pt el ai n minna ii ue g i ta e e S F s
sEMl e
s l
N(n I@L S MABCIIFC 2
2 8 6
- e t 0 0 2
_ a 8 8 8 l l
f 0 0 0 c i
_ 7 7 7 8 8 8 d l e i
el c ei nh
_ i s F S 1 2 3 : :
- e. 8 8 8 :I S H 1 1 1 I
!]ji' 2
y' 2
M t d 1 i 1 -
n n, 0 U f G. .
m 9 I A 5 2 o k - r N.
o . 5 f et e e i N ,
o r 6 o h n ,c t C S 4 t ed nea e e c I
_ 5 6 7 2 rt eahd s a sa c 1 . 8 . ) suxt nT -s .,
3 C - L 6 e aF ece e m.atI s nF . e m
- 8 1 g a
ut ed n) i c iDk.R e
c e 0
5 D 9 J (
- . 6 P e v re d
e .h ni .v a s e d n( I f' Sse e
l i l d t oaer t s e 'l a l n e s e l e cmge nks e a O EEVE t a cos t at e as I s e S N MTmN e t e t engat - aci ep -
A BAl 0 ne e c i
sli n uo Gahe s T l 1 Cne npmihot e i
gS N s E NI TEl ss M P Ae t e i mret des ye) M K T E. E. eAn oebi en dPm en1 k e6 k CG P l s u
e v
t ct o es wcr nu n so nv1 ElEE0 i
n D) U T a e nsdi yat l
f ME T
C P r
a ewomtl r ll e 4 5 L r e ,t leni eed2 wd sb rve0 eiorrt0 S nsruua1 rgypcsm7 eil n i8 vsaeod t oenh cnss
. . Cd at( aei e
W m s
a s )n H n ia 1- 7 gite s a&l cp M 8 gg c4 s M 9 S6E e I 1 :llaa ei n E
en nne uuis eci t -
I I T l
- - t
~
E G T
U gu$ ,
Mi234 .
M I
P A
g 3 D i * '
N l i
p A p
, S e
W T ns e evn.p R m
)
M O AEeN I
hs H
P a I E n R
I R im S .lIiI a m
T :
"teUd G ) I' -
N I
I ygg i n
a e
n n
t i
n
%* }g .l p e l a' .
f6 m ik nI p
E k im
- (t e es e&
c l
I 3 ,
.di mT l
e a
sl g
a n i 1, s
l a es e aesvhe Fec .Rla6 n- yiafu ~s 4 g
ns on g=f s e s a
etQ. n.eh e E nm ae : ncs s
j e l
et cl usi : e udae i
el tse gec h
. cl* rd p M efMhNOA i i a - 4(I t
IN RABCDFFGI Il 2 e
bs l I a
' e di d el cea nh IL )
- 2. : 7 i.. 1S 7 H " /i 1 'l C
i . , >
y .. 7-- '
L .
[v 1:
i .,
DOCKET N0: 50-316 y .g UNIT NAME: D.C. Cook Unit 2 i' COMPLETED BY: Jo L."St. Amand-p j- i TELEPHONE: (615)465-5901 6 '
DATE: Sept. 8, 1987 PAGE: 1 of 2 a
p/ ,
MONTHLY OPERATIN_G ACTIVITIES - AUGUST 1987
$ !- HIGHLIGHTS 3 7 ,Tre reporting period began with the unit in Mode 1 at the 801 power limit administratively imposed,to minimize steam generator tube l degradation.
On 8-1-87 power was reduced ?.o 40% to allow cleaning of the A-Soeth condenser hal f. Power was returned to 80% at 1940. hours on 0-2-87,.
On 8-8-87, power was again reduced ".o termit cleaning of all nain condenser .
halves and both feedpump condelsers. P w er was increased to 517 on 8-10-87, '
whereiit remained until 8-16-8/, when 'it was increased to 80%.
On 8-if-87, a unit shutdown was started as a precautionary measure af ter fin (ing' indications that the reactor coolant pump hatch bolts were not installed as designed, Further analysis bad investigations are to be conducted while the unit is out of service. Concurrently with the shutdown, a surveillance and maintenance outage is to be conducted.
\
? The reporting ieriod ended with the unit in Mode 5. The estimated return to y 9 ' service dri 4 Oct.ober 2, 1987.
- H Gross Electricai Generation for the month of August was 445,290 MWH.
i
SUMMARY
8-1-87 "0000 Unit b in Mode 1 at 80% power.'
1333 Started power reduction for concenser' cleaning.
8-2-f7 0215 Stoqxd power reduction at 40%.
1015 Began increasing power.
?)40 Power at 80%.
4 8-8;d7 2366 Start power reduction for condenser cleaning.
.p
_ _ _ _ _ _ _ _ _ ___ ._ _ - 1.J
- , ' r, l
i 4 0602 Westmainfeedpump'$ff.
0809 Stabilized power at 40%.
1300 Uncoupled we'st main feedpump from turbine; pump is seized.
1420 West main feedpump on turning gear.
8-10-87 0200- Started power, increase.
0505 Stopped power increase at 51%.
8-15-87 2324 Stheted increasing power.
8-1.6-87 0130 Pover steady at 80%.
8-26 2127 Unit shutdown started due to finding indications of reactor (Further coolant examination riump hatchunit requires bolts incorrectly) installed.
shutdown.
2140 N 'a.d NRC of power reduction.
8-27-87 0231 Tripped itain turbine.
0236 Entered Mode 2.
0245 Entered Mode 3. All control rods inserted.
0303 All shutdown rods inserted.
0304 Reactor trip breakers opened.
1034 Entered Mode 4. _
2145 Entered Mode 5.'
The reporting period. ended with the unit in Mode 5 for repairs to the reactor coolant pump hatch bolts being performed concurrently with a maintenance and surveillance outage, i
) 1
=-- ---
gy, ,;
3
!;fd$
f:
d-
. o N #f6 DOCKET N0. 50-316
,,, UNIT NAME D.C.Coold-Unit Nd. 2 '
fN , , DATE Sept. 8, 1987 T COMPLETED BY J. L. St. Amand TELEPHONE. (616) 465-5901 'I PAGE 1 of 1 d
,~
MAJOR SAFETY-RELATED MAINTENANCE 0 AUGUST, 1987.
l$h- ,
~, '
M The" reactor. coolant pump hatch bolts were found to be installed
>F differently than designed. Investigation, analysis and repairs are continuing. Repairs will be completed prior to returning the unit to service.
M-2' An essential service water expansion joint supplying the west header
. was found ruptured, rendering the west train of ESW and the AB p;p' '
Diesel Generator inoperable. Temporary repairs were completed with non-certified parts, and the systems were considered operable as
.long as the cross-tie valves remain open. ' Replacement with certified parts was accomplished and the west ESW header returned to service.
s I g y >
n
7-
.N*~
p .!
)
,Q o N
,. i ./
/
s 1
~" ?
y t m_lNDIANA & MICHIGANJLECTRlC.C0MPAANL DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106
- ' h '
i (616) 465-5901 .((' l September 9, 1987 j
' Director, Office Of Management Information i and Program Control U. S.1 Nuclear Regulatory Commission .
Washington,'D. C. 20555 l Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the Month of August, 1987 is submitted.
Sincerely, W. G. Smith, Jr.
Plant Manager
.WGS/j d cc: J. E. Dolan M. P. Alexich R. W. Jurgensen f/
R. O. Bruggee /
R. C. Callen (g/
C.'A. Erikson ,
D. W. Paul . 0< N ' '
D. R. Hahn )-
O J. J. Markowsky E. A. Morse g@f [p/ l
-PNSRC File 9V ,/
INPO Records Center '
ANI Nuclear Engineering Department ge>
T. R. Stephens jy
'NRC Region III te'
~B. L. Jorgensen S. L. Hall D. A. Timberlake
/
\s l