ML20236W137
| ML20236W137 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/28/1998 |
| From: | Jeffery Wood CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 1-1167, NUDOCS 9808050102 | |
| Download: ML20236W137 (2) | |
Text
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
o W*. -
19"'
Davos-Besse Nuclear Power Station E EE M 5601 North State Route 2 m
Oak Harbor Ohio 43449-9760 John K. Wood 419-249-2300 Vice President. Nuclear Fax
- 419-321-8337 Docket Number 50-346 WHEN SEPARATED FROM License Number NPF-3 ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED Serial Number 1-1167 i
July 28, 1998 l
United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001
Subject:
Industrial Security Plan, Revision 18 Ladies and Gentlemen:
In accordance with provisions of 10CFR50.54(p), Toledo Edison (TE) hereby submits one original and three copies of the Davis-Besse Nuclear Power Station Unit Number 1, Industrial Security Plan, Revision 18 (Attachment 1). A report of the changes made to the Industrial i
Security Plan is included with each copy.
Attachment I contains Safeguards Information and pursuant to 10CFR 73.21 is to be withheld from public disclosure.
Should you have any questions or require additional information, please contact Mr. James L.
Freels, Manager - Regulatory Affairs, at (419) 321-8466.
Ve tmly yours, i
l l
D M/laj cc:
A. B. Beach, Regional Administrator, NRC Region III(2 copies) g
}
S. J. Campbell, DB-1 NRC Senior Resident Inspector w/o I/
F A. G. Hansen, DB-1 NRC/NRR Project Manager w/o ti Utility Radiological Safety Board w/o WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED 4
isuua 9808050102 980728 PDR ADOCK 05000346 F
J l
ATTACHMENTS DAVIS-BESSE NUCLEAR POWER STATION UNIT NUMBER 1 REVISION 18 i
I INDUSTRIAL SECURITY PLAN i
i l
L-.-________________._____