| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Franz J IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| Shared Package | |
| ML20236V685 | List: |
| References | |
| 50-331-98-08, 50-331-98-8, NUDOCS 9808040140 | |
| Download: ML20236V682 (4) | |
See also: IR 05000331/1998008
Text
_
_
_ _ _ .
. _ _ _ _ _ . .__-_____ _ _ __ _ _ _ _ _ -
a targ%
n
UNITED STATES
'K
NUCLEAR REGULATORY COMMIS0lON
\\y)
]
- n
REGION lli
"U
801 WARRENVILLE ROAD
3
\\y
USLE, ILLINOIS 60532-4351
%
July 28, 1998
Mr. John F. Franz, Jr.
Vice President, Nuclear
Alliant Tower
200 First Street SE
P. O. Box 351
Cedar Rapids, IA 52406-0351
SUBJECT:
DUANE ARNOLD INSPECTION REPORT 50-331/98008(DRP) AND
,
Dear Mr. Franz:
l
On June 9,1998, the NRC completed a routine safety inspection at your Duane Amold Energy
L
Center (DAEC) facility. The enclosed report presents the results of that inspection.
..
Based upon the findings during this 6-week period, overall performance was characterized by
safety conscious operations. During this inspection period, improved performance was noted
from the first half of the scheduled refueling outage. The number of self-revealing events, human
i
errors, communication problems, and planning and scheduling deficiencies, as detailed in
inspection Report 50-331/98004, decreased. However, we are concemed about three violations
!
of NRC requirements that were identified. The first violation is of concem because of the
importance of maintaining your drywell free of trash and tools following outage activities. The
i
second violation involved inadequate post-maintenance testing. The third violation involved the
failure to report the condition of the high pressure coolant injection (HPCI) system room
compartment as being outside of ihe design basis due to a postulated high energy line break.
While your staff was proactive in broadening the scope of the evaluation to the HPCI room walls,
NRC intervention was necessary to ensure that this issue was reported as required.
These violations are cited in the enclosed Notice of Violation (Notice), and the circumstances
k
surrounding the violations are described in detail in the enclosed report. Please note that you are
i
i
required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your response. The NRC will use your response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
~ We are also concemed about the three mispositioned valve events that occurred in an 11-day
>
l
period during the refueling outage. Two of the mispositioned valve events resulted in two non-
cited violations. The third mispositioned valve event was found by your staff during the conduct
!
of a surveillance test and did not result in a violation.
,
ADOCK 05000331
/O\\
9908040140 980728
G
\\/j
x.
l
.
J. Franz
-2-
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, the
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
[M
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No.: 50-331
License No.: DPR-49
Enclosures:
1.
2.
Inspection Report 50-331/98008(DRP)
cc w/encls:
E. Protsch, Executive Vice President
Energy Delivery Alliant;
President, IES Utilities, Inc.
G. Van Middlesworth
Plant Manager
K. Peveler, Manager
Regulatory Performance
Chairperson, Iowa Utilities Board
,
,,
_ - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _
,
l
4
J. Franz
-2-
1
i
in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, the
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
/s/ Marc L. Dapas for
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No.: 50-331
l
License No.: DPR-49
Enclosures:
1.
2.
Inspection Report 50-331/98008(DRP)
cc w/encts:
E. Protsch, Executive Vice President,
Energy Deliver / Alliant
President, IES Utilities, Inc.
G. Van Middlesworth,
Plant Manager
K. Peveler, Manager,
Regulatory Performance
Chairperson, Iowa Utilities Board
,
i
l
!
DOCUMENT NAME: G:\\DUAN\\DUA98008.DRP
To receive e copy of this document, indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
OFFICE
Rill
lN
Rlli
l
Rill
l
Rlil
l
NAME
RLanksbury:nhCMS GGrantf$9f) /V
DATE
07/l?/98
07d'd98
07/ /98
07/ /98
OFFICIAL RECORD COPY
f
I
'
..
...
.
.
.
.
,
.
- - . _ _ _ - - - - - - - - _ - - - - - - - _ _ _ _ _ _ _ _ _ _
J. Franz
3-
s
Distribution:
Project Mgr., NRR w/encls
C. Paperiello, Rlll w/encls
J. Caldwell, Rlli w/enets
B. Clayton, Rlli w/encls
SRI Duane Arnold w/encls
DRP w/encls
TSS w/encls
DRS (2) w/encls
Rlli PRR w/encls
PUBLIC IE-01 w/encls
Docket File w/encls
GREENS
LEO (E-Mail)
l
DOCDESK (E-Mail)
j
1
l
l