ML20236V613

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Repts 50-277/87-16 & 50-278/87-16.Corrective Actions:Interim Controls Will Remain in Effect Until Design Criteria Spec Completed & Issued by 871231
ML20236V613
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/02/1987
From: Kowalski S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Johnston W
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8712040409
Download: ML20236V613 (2)


Text

.- -

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET' P.O. BOX 8699 PHILADELPHIA A. PA.19101 S. J, KOW A LSKI

-l VIC E-PR E SID E N T l

\\

Mr. William V. Johnston, Acting Director Docket Nos. 50-277 Division of Reactor Safety 50-278 Region i U. S. Nuclear Regulatory Conmission Attn Doctment Control Desk Washington, D. C. 20555 I

SUBJECT:

Response to Combined Inspection Report Nos. 50-277/87-16; 50-278/87-16 I

Dear Mr. Johnston:

Your letter of August 6,1987 transmitted the subject inspection Report concerning the special safety inspection conducted June 16-19, 1987.

In our response dated September 3,1987, we made the ccnmitment to implement a procedure for controlling additions or changes in the configurations of masonry walls by November 1, 1987.

The purpose of this letter is to inform you that this conmitment was not met.

We apologize for not providing a more timely notification that our stated conmitment would not be met. The need to establish prococural i

control in order to provide confirmation that all' safety related walls were listed was the subject of the inspection violation and required inmediate resolution. Once this effort was adequately addressed, the l

preparation and implementation of a procedure for controlling additions or changes to masonry walls could be undertaken.

In the Interim, control measures are in effect~In the form of a memorandun dated May 28, 1987 to engineering, design, construction and maintenance personnel which requires that attachments to safety related walls be analyzed and approved by the Civil Engineering Section.

-A followup memorandun dated October 14, 1987 re-emphasized the Interim guldance and the need to obtain the approval of Engineering prior to adding, rx)difying or attaching to a masonry wall.

We will be preparing an engineering specification which provides the criteria that must be followed when Installing, renoving, nodifying or attaching equipment directly on, or in proximity to, masonry walls.

Procedural control will be established by incorporating the design criteria specification by reference in existing engineering and plant design control procedures.

/p PDR ADOCK 05000277.

IO 8712040409 871202 G

PDR ~

l l

l e

-g-l l

The design criteria specification will be completed and issued by December 31, 1987. The existing interim controls will' remain in effect untti the specification is placed in effect.

l l

The delay in informing you of this failure to meet our conmitment was discussed with Mr. Anthony Varela, USNRC Region I, on November 30, 1987. He concurred with our request for an extension to this conmittment.

If you have any questions or require additional infonraticn, please do not hesitate to contact us.

Very truly yours, DM0/bts/11198701 cc: Addressee W. T. Russell, Administrator, Region I, '9NRC T. P. Johnson, Resident Site Inspector