Admiral Frank L. Bowman, USN Director, Naval Nuclear Propulsion Department of Energy Washington, D.C. 20585 I

SUBJECT:

NRC STAFF REVIEW OF THE NEW ATTACK SUBMARINE CLASS SAFETY ANALYSIS REPORT

Dear Admiral Bowman:

I am responding to your letter of May 11,1998, concerning review by the staff of the U.S. Nuclear Regulatory Commission (NRC) of the New Attack Submarine (NSSN) class safety analysis report (SAR). In your letter, you gave a brief description of the NSSN reactor plant, along with an NSSN SAR review plan that outlined areas to be covered in the SAR and a proposed schedule for the review.

The NRC should be able to support your schedule, however, we would like to meet with your staff in February 1999 to further discuss the scope and schedule for our review effort.

The review has been assigned Project No. 705, and the Non-Power Reactors and Decommissioning Project Directorate (PDND) will be the pomt of contact for the review.

Dr. Seymour H. Weiss is the Director of PDND and Alexander Adams is the project manager for the review. Dr. Weiss can be reached at 301-415-2170 and Mr. Adams at 301-415-1127.

NRC informed Naval Reactors in a letter dated February 16,1995, that future design reviews would be performed on a reimbursable basis. The details of reimbursement for this review need to be agreed on about 1 year before submission of the SAR to allow the staff to conduct planning for the review.

If you have any questions about our participation in the NSSN SAR review, please contact Dr. Weiss or Mr. Adams at the numbers listed above. We look forward to reviewing the SAR for this important addition to our Nation's defense.

Sincerely, ORIGINAL SIGNED BY:

D" Samuel J. Collins, Director E]!)

Office of Nuclear Reactor Regulation l

Project No. 705

~ i DISTRIBUTION:

(/ b 53 p

E-MAIL HARD COPY l

g f

SHolmes TDragoun Docket File (Project No. 705)

AAdams 4

SCollins/FMiraglia (05-E7) g f O SWeiss j

{

Plsaac WEresian PUBLIC l

y PDoyle MMendonca EHylton

(

TMichaels CBassett PDND r/f RZimmerman (05-E7)

JRoe (012-E5)

OGC (015-B18) d GHill (2) (T5-C3)

Gl

^

t.

s O

f

'b

[h *SEE PREVIOUS CONCURRENCE

  • PDN TECH ED*

P A

PDND:D' DRPM:(A)D*

CFO' SE AA BCalure on SWeiss JRoe/DMatthews JF ch 7/ ~//98 6/9/98 7//) /98 7/1/98 6/15&20/98 7

/98 7tg/98 (f900 N OFFICIAL RECORD COPY DOCUMENT NAME:G:\\SECY\\ ADAMS \\ BOWMAN.WPD o% / p gg g g

Admir:I Frank L. Bownun, USN Director, N:vtl Nucirr Propulsion l

D::partm:nt of En:rgy Washington, D.C. 20585 i

i

SUBJECT:

NRC STAFF REVIEW OF THE NEW ATTACK SUBMARINE CLASS SAFETY ANALYSIS REPORT I

Dear Admiral Bowman:

I am responding to your letter of May 11,1998, concerning review by the staff of the U.S. Nuclear Regulatory Commission (NRC) of the New Attack Submarine (NSSN) class safety analysis report (SAR). In your letter, you gave a brief description of the NSSN l

reactor plant, along with an NSSN SAR review plan that outlined areas to be covered in the SAR and a proposed schedule for the review.

The NRC should be able to support your schedule, however, we would like to meet with l

your staff in February 1999 to further discuss the scope and schedule for our review effort.

l The review has been assigned Project No. 705, and the Non-Power Reactors and Decommissioning Project Directorate (PDND) will be the point of contact for the review.

(

Dr. Seymour H. Weiss is the Director of PDND and Alexander Adams is the project manager for the review. Dr. Weiss can be reached at 301-415-2170 and Mr. Adams at

)

301-415-1127.

NRC informed Naval Reactors in a letter dated February 16,1995, that future design reviews would be performed on a reimbursable basis. The details of reimbursement for this review need to be agreed on about 1 year before submission of the SAR to allow the staff l

to conduct planning for the review.

I 1

l If you have any questions about our participation in the NSSN SAR review, please contact Dr. Weiss or Mr. Adams at the numbers listed above. We look forward to reviewing the SAR for this important addition to our Nation's defense, i

Sincerely, Samuel J. Collins, Director Office of Nuclear Reactor Regulation Project No. 705 DISTRIBUTION:

E-MAIL HARD COPY l

SHolmes TDragoun Docket File (Project No. 705)

AAdams i

Pisaac WEresian PUBLIC SWeiss PDoyle MMendonca EHylton SCollins/FMiraglia (05-E7)

TMichaels CBassett PDND r/f RZimmerman (05-E7)

JRoe (012-ES)

OGC (015-B18)

GHill (2) (T5-C3) f

{

s

\\>b

  • SEE PREVIOUS CONCURRENCE l

PD M

TECH ED*

PDN/ I,.A PDND:D*

DRPM:(A)D*

DONRR l

A BCalure EMton SWeiss JRoe/DMatthews SCollins l

7 8

6/9/98 7/ h /98 7/1/98 6/15&20/98 7/ /98 OFFICIAL RECORD COPY DOCUMENT NAME:G:\\SECY\\ ADAMS \\ BOWMAN.WPD i

i l

l i

L

i Admiral Frank L. Bowm:n, USN Director, Naval Nuctsar Propulsion D::ptrtmtnt of En:rgy Washington, D.C. 20585

SUBJECT:

NRC STAFF REVIEW OF THE NEW ATTACK SUBMARINE CLASS SAFETY ANALYSIS REPORT

Dear Admiral Bowman:

I am responding to your letter of May 11,1998, concerning review by the s f of the U.S. Nuclear Regulatory Commission (NRC) of the New Attack Submarine SSN) class safety analysis report (SAR). In your letter, you gave a brief description f the NSSN reactor plant, along with an NSSN SAR review plan that outlined area to be covered in the SAR and a proposed schedule for the review.

The NRC should be able to support your proposed review and s edule, but we would like to propose one minor modification. We would like to request at the background briefing occur approximately 30 days after submission of the SAR.

e review has been assigned Project No. 705, and the Non-Power Reactors and Decom issioning Project Directorate (PDND) will be the point of contact for the review. Dr.

ymour H. Weiss is the Director of PDND and Alexander Adams is the project manager fo the review. Dr. Weiss can be reached at 301-415-2170 and Mr. Adams at 301-41 -1127. We would like to meet with your staff in February 1999 to determine the scop of the review and budget for the resources required for the review.

NRC informed Naval Reactors in a letter date February 16,1995, that future design reviews would be performed on a reimburs le basis. The details of reimbursement for this review need to be agreed on about 1 year efore submission of the SAR to allow the staff to conduct planning for the review.

1 I

If you have any questions about our participation in the NSSN SAR review, please contact i

Dr. Weiss or Mr. Adams at the nu ers listed above. We look forward to reviewing the SAR for this important addition t oui Nation's defense.

Sincerely, Samuel J. Collins, Director Office of Nuclear Reactor Regulation Project No. 705 DISTRIBUTION:

E-MAIL HARD COPY SHolmes TD goun Docket File (Project No. 705)

AAdams Pisaac resian PUBLIC SWeiss l

PDoyle Mendonca EHylton SCollins/FMiraglia (05-E7) i TMichaels CBassett PDND r/f RZimmerman (05-E7) l l

JRoe (012-E5)

OGC (015 B18) l GHill (2) (TS-C3)

  • SEE PREVIOUS CONCURRENCE PDND:PM*

TECH ED*

P P

D:D DRPM:(A)D*

ONRR AAdams BCalure on SWeiss JRoe/DMatthews Collins 6/11/98 6/9/98 7/ / /98 7/l/98 6/15&20/98 7/ /98 i

OFFICIAL RECORD COPY DOCUMENT NAME:G:\\SECY\\ ADAMS \\ BOWMAN.WPD

)

h Admircl Fr nk L. Bowm:n, USN Dir ctor, Nav:1 Nucl::r Propulsion D pirtm:nt of En:rgy l

/

Washington, D.C. 20585 l

r l

SUBJECT:

NRC STAFF REVIEW OF THE NEW ATTACK SUBMARINE CLAS SAFETY l

l ANALYSIS REPORT I

i

Dear Admiral Bowman:

l l

l am responding to your letter of May 11,1998, concerning revie by the staff of the U.S. Nuclear Regulatory Commission (NRC) of the New Attack ubmarine (NSSN) class safety analysis report (SAR). In your letter, you gave a brief escription of the NSSN j

reactor plant, along with an NSSN SAR review plan that ou ined areas to be covered in the j

SAR and a proposed schedule for the review.

The NRC can support your proposed review and sche ule, but we would like to propose t

one minor modification. We would like to request t at the back-ground briefing occur approximately 30 days after submission of the S

. The review has been assigned Project No. 705, and the Non-Power Reactors and Dec missioning Project Directorate (PDND) will be the point of contact for the review. Dr Seymour H. Weiss is the Director of PDND and Alexander Adams is the project manager or the review. Dr. Weiss can be reached at 301-415-2170 and Mr. Adams at 301-415 127. We would like to meet with your staff in December 2000 to finalize the scope of t e review and to ensure that the appropriate reviewers will be identified and cleared.

NRC informed Naval Reactors in a le er dated February 16,1995, that future design reviews would be performed on a r imbursable basis. The details of reimbursement for this review need to be agreed on abo 1 year before submission of the SAR to allow the staff to conduct planning for the revi If you have any questions ab ut our participation in the NSSN SAR review, please contact Dr. Weiss or Mr. Adams at e numbers listed above. We look forward to reviewing the SAR for this important ad ition to our Nation's defense.

Sincerely, Samuel J. Collins, Director l

Office of Nuclear Reactor Regulation Project No. 705 DISTRIBUTION E-MAIL HARD COPY SHolmes TDragoun Docket File (Project No. 705)

AAdams Pisaac WEresian PUBLIC SWeiss PDoyle MMendonca EHylton SCollins/FMiraglia (05-E7)

TMichae CBassett PDND r/f RZimmerman (05-E7) j JRoe (012-ES)

OGC (015-B18)

GHill (2) (T5-C3)

  • SEE PREVIOUS CONCURRENCE

(

P M

TECH ED*

PDNb:D IN

(A)D

,.DO NRR A

s BCalure on SWeiss JF DCollins 6/(/98 6/[ /98 6/ /98

'6/ /98 6 1/98 6/9/98 OFFICIAL RECORD COPY DOCUMENT NAME:G:\\SECY\\ ADAMS \\ BOWMAN.WPD J

e

. f.

July 28, 1998 j

Admiral Frank L. Bowman, USN Director, Naval Nuclear Propulsion Department of Energy Washington, D.C. 20585

SUBJECT:

NRC STAFF REVIEW OF THE NEW ATTACK SUBMARINE CLASS SAFETY ANALYSIS REPORT

Dear Admiral Bowman:

I am responding to your letter of May 11,1998, concerning review by the staff of the U.S. Nuclear Regulatory Commission (NRC) of the New Attack Submarine (NSSN) class safety analysis report (SAR). In your letter, you gave a brief description of the NSSN reactor plant, along with an NSSN SAR review plan that outlined areas to be covered in the SAR and a proposed schedule for the review.

The NRC should be able to support your schedule, however, we would like to meet with your staff in February 1999 to further discuss the scope and schedule for our review effort.

The review has been assigned Project No. 705, and the Non-Power Reactors and Decommissioning Project Directorate (PDND) will be the point of contact for the review.

Dr. Seymour H. Weiss is the Director of PDND and Alexander Adams is the project manager for the review. Dr. Weiss can be reached at 301-415-2170 and Mr. Adams at 301-415-1127.

NRC informed Naval Reactors in a letter dated February 16,1995, that future design reviews would be performed on a reimbursable basis. The details of reimbursement for this review need to be agreed on about 1 year before submission of the SAR to allow the staff to conduct planning for the review, if you have any questions about our participation in the NSSN SAR review, please contact Dr. Weiss or Mr. Adams at the numbers listed above. We look forward to reviewing the SAR for this important addition to our Nation's defense.

Sincerely, ORIGINAL SIGNED BY:

Samuel J. Collins, Director Office of Nuclear Reactor Regulation Project No. 705 DISTRIBUTION:

E-MAIL HARD COPY SHolmes TDragoun Docket File (Project No. 705)

AAdams Pisaac WEresian PUBLIC SWeiss PDoyle MMendonca EHylton SCollins/FMiraglia (05-E7) l TMichaels CBassett PDND r/f RZimmerman (05-E7)

JRoe (012-E5)

OGC (015-B18) i GHill (2) (TS-C3)

CFO)T-)

  • SEE PREVIOUS CONCURRENCE PDN TECH ED*

PJ A

PDND:D' DRPM:(A)D*

.A BCalure liN on SWeiss JRoe/DMatthews JFunch 7/

98 6/9/98 7/g /98 7/1/98 6/15&20/98 7

/98 7t$ /98 OFFICIAL RECORD COPY DOCUMENT NAME:G:\\SECY\\ ADAMS \\ BOWMAN.WPD L

____.___.__-_.D

f L

p itov g~

4 UNITED STATES NUCLEAR REGULATORY COMMISSION r

f WASHINGTON, D.C. 20565 4 001 July 28, 1998 l

Admiral Frank L. Bowman, USN Director, Naval Nuclear Propulsion Department of Energy Washington, D.C. 20585 l

SUBJECT:

NRC STAFF REVIEW OF THE NEW ATTACK SUBMARINE CLASS SAFETY ANALYSIS REPORT

Dear Admiral Bowman:

I am responding to your letter of May 11,1998, concerning review by the staff of the U.S. ' Nuclear Regulatory Commission (NRC) of the New Attack Submarine (NSSN) class safety analysis report (SAR). In your letter, you gave a brief description of the NSSN reactor plant, along with an NSSN SAR review plan that outlined areas to be covered in the SAR and a proposed schedule for the review.

The NRC should be able to support your schedule, however, we would like to meet with your staff in February 1999 to further discuss the scope and schedule for our review effort.

The review has been assigned Project No. 705, and the Non-Power Reactors and Decommissioning Project Directorate (PDND) will be the point of contact for the review.

Dr. Seymour H. Weiss is the Director of PDND and Alexander Adams is the project maneger for the review. Dr. Weisa can be reached at 301-415-2170 and Mr. Adams at 301-415-1127.

NRC informed Naval Reactors in a letter dated February 16,1995, that future design reviews would be performed on a reimbursable basis. The details of reimbursement for this review need to be agreed on about 1 year before submission of the SAR to allow the staff to conduct planning for the review.

if you have any questions about our participation in the NSSN SAR review, please contact Dr. Weiss or Mr. Adams at the numbers listed above. We look forward to reviewing the SAR for this important addition to our Nation's defense.

Sincerely, i

u o ins, irector Office of Nuclear Reactor Regulation Project No. 705 1