Text
,
-_ _ - _ _____ _
_ _ - _ _
'
'
j
In Reply Refer To:
DEC ;l 1987
Dockets: 50-313/87-32
50-368/87-32
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
P. O. Box 551
Little Rock, Arkansas
72203
Gentlemen:
This refers to the inspection conducted by Messrs. J. I. Tapic, G. L. Madsen,
T. O. McKernon, and G. A. Pick of this office during the period
September 14-18, 1987, of activities authorized by NRC Operating
Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, and to the discussion of
our findings with Mr. J. Levine and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included reporting of nonroutine events,
records retention program, and followup on generic letters and previously
identified items. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
The results of the inspection in the area of Containment Integrated Leakage
Rate Testing will be forwarded to you under separate cover at a later date.
Three open items are identified in paragraphs 4.b, 5, and 6 of the enclosed
inspection report.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
AC:DRP/C0
RSB/0S
C:0PS ,i
C:RPB
C RP/A
JITapia;df
WCSpid e
JEGagliardo
- PJaudon
GLMadseh g
%
'
8 tT/87
// /Pf 87
((
/87
h /p /87
l
d/2fr/87
/
DRS/PSS D /
DRS/P[
D:DRb
gf
TMcKernon
GPic
LJCallan
// /af/87
g/9/87
g / d/87
'
8712040334 871201
ADOCK 05000313
G
_ - _ _ - _ _
l
_ _ _ _ _ _ _ _ _ _ _
.
.,
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signc& By
L L Callan
i
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix 8 - NRC Inspection Report
50-313/87-32
50-368/87-32
cc w/ enclosures:
J. M. Levine, Director
Site Nuclear Operations
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas
72801
Arkansas Radiation Control Program Director
bec to DM8 (IE01)
bec distrib. by*RRI
RIV:
- DRP
R. D. Martin, RA
RPSB-DRSS
- Section Chief (PS/A)
- D. Weiss, RM/ALF
- RIV
- DRS
- MIS System
- RSTS Operator
- Project Engineer, PS/A
- R.
Hall-DRSS
- G. Dick, NRR Project Manager
J. Tapia
G. Madsen
T. McKernon
G. Pick
l
l
- w/766
___i____________._..._