ML20236V460

From kanterella
Jump to navigation Jump to search
Forwards ...Environ (Thermal Endurance) Test Plan.... Three Sets of Solenoids (Six Total) to Be Tested at Various Temps & Energization States Over 92-day Period & Results Evaluated.Interim Results Will Be Provided When Available
ML20236V460
Person / Time
Site: Perry 
Issue date: 11/23/1987
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20236V462 List:
References
PY-CEI-0IE-0292, PY-CEI-IE-292, NUDOCS 8712040317
Download: ML20236V460 (1)


Text

O THE CLEVELAND ELECTRIC ILLUMINailNG CO.MPANY I

P O.

BOX 97 m

PERRY. OHIO 440s1 s TELE

  • HONE (216) 259-3737 m

ADDRESS-10 CENTER ROAD Serving The Best Location in the Nation Murray R. Edelman PERRY NUCLEAR POWER PLANT 5R VIO PRESIDENT NUCLEAR November 23, 1987 PRIORITY ROUllWG

'PY-CEI/01E-0292 L

,f"q$q 4

ga y pV

_--.Kk p DR Mr. A. Bert Davis T3L _]

Regional Administrator, Region III d

inb U.S. Nuclear Regulatory Commission f1LEde.1, 799 Roosevelt Road Glen Ellyn, Illinois 60137 Perry Nuclear Power Plant Docket No. 50-440 i

Letter PY-CEI/01E-0289 L

Dear Mr. Davis:

l This letter provides the Environmental Testing Plan committed to in our letter, PY-CEI/0IE-0289 L, dated November 13, 1987.

As discussed in the test plan, three sets of Solenoids (6 total) will be tested at various temperatures, and energization states over a 92 day period, and the results evaluated.

Interim test results will be provided to the NRC, as they become available during the 92 day test duration.

If you have any questions, please feel f ree to call.

Very truly yo s,

Murray R. Edelman Senior Vice President Nuclear Group MRE: cab Enclosure cc: