PN-75-084:on 750901,licensee Reported That Circumferential Crack Was Found on an Unisolatable Section of 6-inch Primary Coolant Cleanup Sys Line Return from Primary Side to B SG
ML20236V306
Person / Time
Site: Dresden Constellation icon.png
Issue date: 09/02/1975
From: Jennifer Davis, Thornburg H, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-084, PN-75-84, NUDOCS 9808030071
Download: ML20236V306 (1)


Text

f p y c l'll 6

/LBf PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE m.

a.= September 2, 1975

(~ p PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -PN-75-84 ,p i

s This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 9:00 a.m. on the date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT

. NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.

. .a - . .. .

Facility: Commonwealth Edison Company (Dresden Unit 1)

Subject:

PIPE CRACK ON 6-INCH CLEANUP LINE The licensee reported that on September 1, 1975, a circumferential crack was found on an unisolatable section of the 6-inch primary coolant cleanup system line return from the primary side of the "B" steam  !

generator. The approximately one inch long crack was in the heat i affected zone of the weld between the 6-inch line and a 15-inch long  !

weldolet. The crack was found af ter humidity and dew cell indications

- were cbserved in the sphere. @

No radioactive releases were encountered. The unit is shut down for l

!, investigation of the pipe crack. l An inspector has been dispatched to the site.

The licensee will issue a press release. IE:III will issue a press release. The state of Illinois has been notified.

Region III received notification of this occurrence by telephone from The Operating Engineer at 1600 hrs on September 1, 1975.

Contact:

RFWarnick, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541 Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kammerer, CA L. V. so'ssick, EDO D. F. Knuth, IE J. A. Harris,.PA .

B. C. Rusche, NRR H. H. Brown, ISP T. J. McTiernan, AIA K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted: P Bldg 2h; H St N h ; MNBE  ; Luge p [ O "

I

  • l

.$)D I = PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE 9808030075 750902 PDR ikE PN-75-084 PDR