ML20236V184

From kanterella
Jump to navigation Jump to search
Ack Receipt of 980716 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-352/98-03 & 50-353/98-03.Actions Will Be Reviewed During Future Insp of Licensed Activities
ML20236V184
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/27/1998
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
50-352-98-03, 50-352-98-3, 50-353-98-03, 50-353-98-3, NUDOCS 9807310353
Download: ML20236V184 (3)


See also: IR 05000352/1998003

Text

. _ _ _ _ _ _ _ _ _ _ _ _ _

___ - _-

.

.

July 27, 1998

Mr. G. Rainey, President

PECO Nuclear

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, PA 19087-0195

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NOS. 50-352/98-03

AND 50-353/98-03

Dear Mr. Rainey:

This refers to your July 16,1998 and your July 21,1998 correspondences, in response to

our June 18,1998 letter.

Thank you for informing us of the corrective and preventive actions documented in your

letter. These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely,

Original Signed by.

)

Clifford J. Anderson, Chief

l

'

Projects Branch 4

Division of Reactor Projects

Docket Nos. 50-352;50-353

cc w/ copy of Licensee Response Ltr:

T. Moore, Manager, Experience Assessment

Secretary, Nuclear Committee of the Board

Commonwealth of Pennsylvania

f

cc:

!

G. Edwards, Chairman, Nuclear Review Board and Director - Licensing

f

'

l

J. VonSuskil, Vice President - Limerick Generating Station

4

i

9807310353 980727

PDR

ADOCK 05000352

0

_ PDR

l

a

1

i

i

0FFICIAL R2 CORD COPY

IE:01

!

l

- _ _ _ - _ - . - - _ _ _

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ - - _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ .

_ .

_ _ _ _ _ _ _ _ _ - .

.

Mr. G. Rainey

2

Distribution w/ copy of Licensee Response Ltr:

Region I Docket Room (with concurrences)

C. Anderson, DRP

D. Florek, DRP

R.Junod,DRP

NRC Resident inspector

Nuclear Safety Information Center (NSIC)

PUBLIC

Distribution w/ encl: (Via E-Mail)

B. McCabe, OEDO

R. Capra, PDI-2, NRR

inspection Program Branch, NRR (IPAS)

8. Buckley, PD 1-2, NRR

M. Thadani, PD 1-2, NRR

R. Correia, NRR

F. Talbot, NRR

M. Campion, ORA

DOCDESK

DOCUMENT NAME: A:\\RL9803. LIM

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment /epqloyyre

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

Rl/DK

l

Rl/DRP

l

f

NAME

DFlpfek )

CAnderson c/#

_

DATE

O @ 98

07/37/98

'

_

OFFICIAL RECORD COPY

____

_ _ _ _ _ _ _ _ _ _ _ ~

_ _ - _ _ -

_ _ _ .

-

- _ _ _ _ _ _ - _ __ _ _ -

"

4.

,

.

~ Mr.' G. Rainey

2

' Distribution w/ copy'of Licensee Response Ltr:

,

. Region i Docket Room (with concurrences)

B. McCabe, OEDO

R. Capra, PDI-2, NRR

~

B. Buckley, PD 1-2, NRR

M. Thadani, PD 1-2, NRR

. R. Correi:,, NRR :

. "..

F.' Talbot, NRR

C. Anderson, DRP .

,

D. Florek, DRP

M. Campion, ORA

R. Junod, DRP

NRC Resident inspector

t-

Nuclear Safety information Center (NSIC)

PUBLIC

' Inspection Program Branch, NRR (IPAS)

-DOCDESK

,

l

l

C0CUMETT NAME: A:\\RL9803'. LIM

'See previous concurrences

'

To receive e copy of this document, indicate in the box: "C" = Copy without

l

attachment / enclosure

"E"'= Copy with attachment / enclosure

"N" = No copy

!

OFFICE

  • Rl/DRP

l

"Rl/DRP

l

NAME

DFlorek/DF

CAnderson/CA

DATE

07/27/98

07/27/98

OFFICIAL RECORD COPY

l

l

l_.'

- - _ - - _ _ _ - - _ _ _ _ _ - - - - _ _ _ _ _ _ - _ - _ _ _ - _ _ _ _ _ _ _ - _ _ - - - _ _ - _ - _ . - - - . _ _ _ _ _ _

- _ _ _ _ _ . _ . - . .

_ _ _ _ _

_ _ _ _ _ .

_.

_

James D. von Suskil

'

/

.

Vx:s Presdent

Limanck GenerttnD station

PECO NUCLEAR

Pecc ene,g, c ,,,

A Unit of PECO Energy

$a[1

Sanatoga. PA 19464-0920

610 718 3000 / Fax 610 718 3008

Pager 1800 672 2285 #0271

Internet address: jvonsuskil@peco-energycom

10 CFR 2.201

July 16,1998

Docket Nos. 50-352

50-353

License Nos. NPF-39

NPF-85

U.S. Nuclear Regulatory Commission

Attn.: Document Control Desk

Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2

%Ng

9T <d3

Reply to a Notice of Violation

NRC Integrated Inspection Report Nos. 50-352/9Mtfand 50-353/9M

Attached is PECO Energy Company's reply to a Notice of Violation for Limerick

Generating Station (LGS), Units 1 and 2, that was contained in your letter dated June

{

18,1998. The NoJce identified one violation concerning plant conditions not accurately

reflected in the Operations unified control room log (UCRL). The attachment to this letter

provides a restatement of each violation followed by our reply.

If you have any questions or require additional information, please contact us.

Very truly you ,

J

Betachment

)

cc:

H. J. Miller, Administrator, Region I, USNRC

w/ attachment

A. L. Burritt, USNRC Senior Resident inspector, LGS

l

"

l

1

i

j

h?

'

b. .

.

,

.

.

,..

Docket Nos. 50-352 and 50-353

.'

July 16,1998

Page 2

bec:

G. R. Rainey - CB,63C-3

w/ attachment

J. D. von Suskil - SMB1-1

"

R. W. Boyce - CB, 63C-3

"

M. P. Gallagher - GML5-1

"

J. A. Hutton - GML5-1

"

G. D. Edwards - CB,62A-1

"

.

J. E. Cohen - SSB4-3

"

l

T. A. Moore - SSB2-4

"

l

LGS ISEG - SSB4-2

"

l

NRB Chairman - CB,62A-1

"

l

Secretary, NCB - CB,62A-1 (11 copies)

"

(

PA DEP BRP inspector- SSB2-4

"

OEAP Coordinator - CB,62A-1

"

Correspondence Release Point - SMB1-2

"

DAC - SMB1-2

"

,-

l

t

I

,

l

_ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - _ .

_ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _

. _ - _ _ _ _ _ _ _ _ _ _ _ _ . .__.

e.

s

.

Attachment

.'

Docket Nos. 50-352 and 50-353

l

July 16,1998

Page 1 of 2

Repiv To a Notice of Violation

Violation A

Restatement of Violation

During an NRC inspection conducted on March 17,1998 through May 18,1998, a violation of

NRC requirements was identified. In accordance with the " General Statement of Policy and

Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

Appendix B, Criterion XVI, of 10 CFR 50 states, in part, that measures shall be

established to assure that conditions adverse to quality, such as nonconformances are

promptly identified and corrected. In the case of significant conditions adverse to

quality, the measures shall assure that the cause of the condition is determined and

corrective action taken to preclude repetition.

Contrary to the above, measures established to correct nonconformances regarding log

entries, identified in violation 97-10-01, did not preclude repetition of a similar problem,

as evidenced by the following examples:

1.

On April 4,1998, operators declared the D-13 emergency diesel generator

inoperable. This condition consequently rendered the control room emergency

fresh air supply (CREFAS) system inoperable, however operators did not enter

in the control room unified log that they had entered the Unit 2 CREFAS

Technical Specification limiting condition for operation (LCO) 3.7.2.a.1.

2.

On April 4,1998, with the D-13 emergency diesel generator inoperable and the

'B' CREFAS system inoperable, the operators did not enter in the control room

unified log that they had entered the Unit 2 CREFAS Technical Specification

LCO 3.7.2.a.3.

This is a Severity Level IV violation (Supplement I).

REPLY

Admission of the Violation

PECO Energy acknowledges the violation.

l

_ _ _ - _ _ _ _ - _ - _ _ _ _ _ _ - _ _ _ _

t

<z

,

l

l

Attachment

'

i

'

.'

Docket Nos. 50-352 and 50-353

July 16,1998

Page 2 of 2

l

I

Reasons for the Violation

The management expectation for logging of LCOs was not effectively reinforced to Operations

.

)

shift management. As a result, a common practice of logging only the most restrictive TS

I

<

action developed and shift management did not recognize this practice as a deficiency.

I

Responses to previous logging deficiencies focused on individual performance lapses and did

I

not involve an assessment of overall compliance with the expectations for log entries. As a

{

result, previous corrective actions did not address the underlying causes for the most recent

'

deficiencies as cited in this notice of violation.

-

Corrective Actions Taken and Results Achieved

The appropriate UCRL regulatory action entry for the Unit 2 CREFAS TS action due to the

!

inoperability of the D-13 emergency diesel generator was created on May 14,1998.

1

$

!

The appropriate UCRL regulatory action entry for the Unit 2 CREFAS TS action due to the

inoperability of the D-13 emergency diesel generator and 'B' CREFAS was created on June 13,

1998.

The Senior Manager of Operations promptly reinforced the expectation that all applicable TS

actions be logged in UCRL.

i

Shift managers have incorporated the reinforcement for TS action logging in their routine

-

reviews of operator logs.

Corrective Actions to Avoid Future Noncomollance

l

Shift managers will conduct additional face-to-face briefings with all cenior licensed operators to

)

reinforce log-keeping expectations. These briefings are expected to be completed by August

l

15,1998.

l

~

Operations initiated a review of log-keeping guidance, including industry standards and best

practices. Guidance for operator log-keeping will be revised to incorporate the results of this

!

review. This is expected to be completed by August 15,1998.

,

Date When Full Compliance was Achieved

>

Full compliance was achieved on June 13,1998 when the required UCRL entry for the

inoperability of the D-13 emergency diesel generator and 'B' CREFAS was created.

'

,

l

l

1

j

Jame2 0 van Suikd

  • * *

A

Vce President

Umench Gensrating Stacco

.

.

=r

PECO NUCLEAR

-co ,,,, co,n,,,

--

Po

A Unit of PECO Energy

W81\\

sanatoga. PA IS464 0920

T .'

610 718 3000 / Fax 610 718 3008

,

<

'

Pager 1800 672 2285 *0271

1

Internet address: jvonsuskd@peco enerQYCom

10 CFR 2.201

July 21,1998

Docket Nos. 50-352

50-353

License Nos. NPF-39

NPF-85

,

U.S. Nuclear Regulatory Commission

Attn.: Document Control Desk

Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2

Correction to July 16,1998 Reply to a Notice of Violation

NRC Integrated Inspection Report Nos. 50-352/98-03 and 50-353/98-03

The purpose of this letter is to provide a correction to the cover letter for the subject

Limerick Generating Station Reply to Notice of Violation dated July 16,1998. The cover

letter for the reply incorrectly referenced NRC Integrated Inspection Report Nos. 50-

-

352/97-10 and 50-353/97-10. The correct reference is Integrated inspection Report

Nos. 50-352/98-03 and 50-353/98-03. This correction has no impact on the content of

the original reply and, therefore, a copy of the original reply has not been included with

this letter.

If you have any questions or require additional information, please contact us.

Very truly yours,

l ---

h , ' G ' (/

..

!

cc:

H. J. Miller, Administrator, Region I, USNRC

A. L. Burritt, USNRC Senior Resident inspector, LGS

1

!

musg1

1