PN-75-116:Ofc of Insp & Enforcement Issued IE Bulletin 75-04B.Bulletin Requests Results of FP Insps Performed by Groups Other than NRC at Licensed Operating Power Plants & Description of Actions Taken by Licensees
ML20236U940
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/31/1975
From: Bryan S, Jennifer Davis, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
IEB-75-04, IEB-75-4, PN-75-116, NUDOCS 9807310191
Download: ML20236U940 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ __ __ _

/

+7;-

( PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE October 31, 1975 PRELIMINARY NOTICE OF INSPECTION AND ENFORCEMENT ACTION ----PN-75-116 Facility : Licensees for operating nuclear power plants

Subject:

ADDITIONAL IE BULLETIN RELATIVE TO CABLE FIRE AT BROWNS FERRY NUCLAR POWER STATION

. ., ..The Office,of Inspection and Enforcement has issued IE Bulletin 75-04B. A copy of this Bulletin is' attached. This Bulletin requests the results of fire protection inspections performed by cther groups than the NRC at licensed operating power plants. The Bulletin also requests a description of actions taken by NRC power reactor licensees as a result of such inspections.

The information requested in this Bulletin is considered important l in the continuing review of the consequences of the Browns Ferry fire '

and a determination of appropriate actions to be taken.

This Bulletin was necessitated, in part, by the refusal of NNLPIA =

to provide directly to IE the results of inspections performed by that organization of operating powe'r plants. In a New York Times

(

article of September 22, 1975, a representative of NELPIA is quoted as stating that five operating power plants were not in " substantial compliance" with recommended fire protection standards as a result of inspections performed by NELPIA.

O Y

Contact:

SEBryan,IE x7353 HDThornburg, IE x7353 JGDavis, IE x 7541 b

Distribution : A Chairman Anders Commissioner Mason S. J. Chilk, SECY O-Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE 2, Commissioner Kennedy C. C. Kammerer, CA .

L. V. Gossick, EDO D. F. Knuth, IE J. A. Harris, PA B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA K. R. CEa'pman, NMSS H. K. Shapar, ELD - -

Transmitted: P Bldg VN/) ; E St U ,r ; MNBB g'.w y; Lugef>,v_M .

i ,,

I PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE o

l 9807310191 751031 l PDR I&E l PN-75-116 PDR i

l- ,

l .

mh.

V.kY .IE Bulletin No.75-04B *

)

' Clu1LE FIRE AT BRO'.CS FERRY NUCLEAR POUER STATION p IE BULLETIN NO.75-04B

! l

! }

The review by the NRC of the consequences of the fire at i

the Browns Ferry Nuclear Pouer Station is continuing.

Reports of fire protection-inspections performed by groups {

L j or organizations other than the NRC.and actions tahen or '

planned by licensees as a result of these'other fire i * =~ - - -

protection inspections uill be of particular value in this-continuins revicu of the status of operating plants and determination of any cetions which may be appropriate, . , ,

i ACTIONS TO BE TAKEN BY LICEUSEfS:

1. If fire protection inspections (other than those performed by NRC) have' been nade at your licensed operating facilities '

since March 22, 1975, please forward to this office, within 30 days: i

a. A' copy of all reports or any other documentation I

WR?

relating to the fire protection inspections, dates of inspections and by whom performed. )

I i t. -

I b. A description of any actions taken or planned -

showing dates for cetions - as a result of findings or recommendations from the fire protection inspec-tions, or if appropriate, your position relative to the results of the inspections performed.

I

2. If rgl fire protection inspections (other than those performed'by NRC) have been performed at your licensed operating facilities since March 22, 1975, please forward to this office:
a. Within 15 days, your plans and sehe'dules for the performance of fire protection inspections at l

your licensed operating facilities within the next year.

g~

  • e

$ CT

[ .. . L

h

=.

-~

b. Within 30 days following cop.pletion of '

cach of the inspections planned (Item 2a, above),

. .?

(1) a copy of cil reports or other docur.entation relating to each fire prctection inspaction, dates of inspections and by t:hom perforned, and (2) a description of actions taken or planned -

showing dates for actions - as a result of findings or recommendations from the inspections, or if appropriate, your position relative to '

the results of the inspections performed.

' ~ ' ' ' ~

3. Provide directly to the Director, Division of Reacter Inspection. Programs, NRC, Washington, D.C.

20355, a copy of all information submitted in response to this Bulletin.