-.___ _ _-_ _ _ _ _______ __--_ _ __ _ _ _ __ _
wf tih yL Q W)
Qi&YL PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE
.2 7
October 10, 1975 PRELIMINARY NOTIFICh; ION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-104
_o This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 3:45 p.m. on the date of this notification.
IT SHOULD BE SPECIFICALLY NOTED THAT THIS l
NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO
--BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.
Facility:
Calvert Cliffs 1 & 2 (DN 50-317 & 318)
Baltimore Gas and Electric Company
Subject:
INVESTIGATION OF POSSIBLE HEALTH AND SAFETY EFFECTS OF THE EVENTS RELATING TO THE GRAND JURY INDICTMENTS OF SEVERAL BECHTEL EMPLOYEES AND BECHTEL SUBCONTRACTORS (AE FOR BG&E)
An investigation was initiated by IE after a press release was made on February 13, 1975, by United States Attorney for the Distric't of Maryland.
.v.,
The investigation included the following:
a detailed review of Region I
~
inspection documentation from 1969,to the present for both Unit I and Unit 2; examination of pertinent documents at Bechtel Offices at Gaithers-burg, Maryland, BG&E Offices at Brandon Shores, Maryland, the Internal Revenue Services Offices, Baltimore, Maryland and the Calvert Cliffs site; interviews and contacts with involved individuals and organizations; and observations by NRC investigators.
One of the individuals indicted informed the U. S. Attorney during plea-bargaining that he had information that related to the safety of the nuclear plant.
Our interview of this individual and the subsequent in-0 l
vestigations proved his statements to be without substance.
In several
[
cases the subjects were real but the facts were distorted. All such matters have been satisfactorily resolved.
ok i
Our investigation, because of the supplied information, included review of g
nondestructive testing records of the Turkey Point Nuclear Station in addition to the Calvert Cliffs site.
d l
The Office of Inspector and Auditor has assisted IE in the investigation, r~
1 I
l l
(
(,.
Continued l
9807310149 751010 i
PDR I&E PN-75-104 PDR tL_____._________._-.__
a..'.
=
" ".. 227"
~
g J.Es l {_. =:
Continued October 10, 1975 l
Page 2 PN-75-104 i
"Jo items of noncompliance were observed as a. result of the investigation.
Further, the investigation report finds the activities conducted by the individuals or subcontractors named in the indictment did not'have any adverse effects on the safety-related areas of the Calvert Cliffs
,, Nuclear Power Plant.
l Media interest is expected because of previous interest in the indictments.
The State of Maryland will be notified following the release of the report.
m A press release is not planned however, a response to inquiries will be y
available.
OIE received notification of this occurrence by press release from the U. S. Attorney, Maryland District on 2/13/75.
{i
Contact:
FADreher, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541 i
Distribution:
N Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Co$imissioner Rowden G. F. Murphy, JCAE
(,
Commissioner Kennedy C. C. Kammerer, CA L. V. Gossick, EDO D. F. Knuth, IE J. A. Harris, PA B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted: P Bldg k
- H St Y Y; MNBB t/ g; Luge,w-e
/