ML20236U815

From kanterella
Jump to navigation Jump to search
Forwards Rev 12B to Pilgram Nuclear Power Stations Colr,Per TS 6.9.A.4.d.Rev Provides cycle-specific Limits for Operating Plant During Remainder of Cycle 12
ML20236U815
Person / Time
Site: Pilgrim
Issue date: 07/24/1998
From: Alexander J
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20236U817 List:
References
BECO-2.98.098, NUDOCS 9807310094
Download: ML20236U815 (1)


Text

l l

l~

6 BCSTONEDISON i

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, Massachusetts 02360 l

l July 24,1998 BECo Ltr. 2.98.098 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docke'. No. 50-293 License No. DPR-35 Core Operatino Limits Reports The attached revision of Pilgrim's Core Operating Limits Report (COLR) is submitted in accordance with the requirements of Pilgrim's Technical Specification 6.9.A.4.d.

Revision 12B provides cycle-specific limits for operating Pilgrim during the remainder of cycle 12. The core operating limits in COLR, Revision 12B have been established using the NRC-approved methodology provided in the references listed in COLR, Section 5.0 and in Technical Specification 6.9.A.4.

Should you require further information conceming COLR, Revision 128, please contact P.

M. Kahler at (508) 830-7939.

/

} & % A,-

l J.F. Alexander Regulatory Affairs Group Manager PMK/deg 2980S8

Attachment:

Pilgrim Nuclear Power Station Core Operating Limits Report, Revision 12B cc: Mr. Alan B. Wang, Project Manager Rockville, MD 20852 Project Directorate 1-3 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop: OWFN 1482 Region I i

i U. S. Nuclear Regulatory Commission 475 Allendale Road 1 White Flint North King of Prussia, PA 19406 11555 Rockville Pike 9807310094 980724 PDR ADOCK 05000293 P

PDR c_bvvv L

-