_ - _ _ - _ - - _ _ _ _ _ - - - - - _ - _ _ _ - - _ _ _ _ _ _ - _ _ - _ _ - _ _ - _
Commonwealth libwn Company 12%alle Generating Station j
2601 North 21st Itoad Marseilles, IL 613 419757.
Tel HI 4357F61 l
July 27,1998 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Completion of PartialInstallation of the Long Term Solution Stability System Oscillation Power Range Monitor LaSalle County Nuclear Power Station, Unit 1 Facility Operating License NPF-11 j
NRC Docket No. 50-373 l
References:
1.
NRC Generic Letter 94-02, "Long-Term Solutions and Upgrade of Interim Operating i
Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors," dated July 11,1994 2.
John C. Brons (Comed) letter to William T.
Russell (NRC), " Response to Generic Letter 94-02 (BWR Stability)," dated September 9,1994 3.
W. T. Subalusky (Comed) letter to the NRC I/
Document Control Desk, " Revision to Comed
/?
Response to Generic Letter 94-02 (BWR Stability)," dated August 1,1997 j
MOf in response to the United States Nuclear Regulatory Commission (NRC)
Generic Letter 94-02 [ Reference (1)] Commonwealth Edison Company l_
(Comed) committed to install the Long Term Solution Stability System (LTSSS) Oscillation Power Range Monitor (OPRM) for LaSalle County Nuclear Power Station (LaSalle), Unit 1, during the eighth refuel outage (L1R08) (Reference (2)).
In Reference (3) Comed accelerated its implementation schedule by committing to a partialinstallation of the LTSSS OPRM for LaSalle, Unit 1, during the current forced outage (L1F35), with final installation to be i
o
% completed during L1R08.
t,t : s 9807300395 980727 PDR ADOCK 0500o373 p
PDR J
The partial installation of the LTSSS OPRM for LaSalle, Unit 1, has been completed under Design Change Package (DCP) 950040.
If there are any questions or comments concerning this letter, please refer them to Harold D. Pontious, Jr., Regulatory Assurance Manager, (815) 357-6761, extension 2383.
Re
- lly,
/
d Fred R. Dacimo Site Vice President LaSalle County Station cc:
C. A. Paperiello, Acting NRC Region lli Administrator M. P. Huber, NRC Senior Resident inspector - LaSalle i
D. M. Skay, Project Manager - NRR - LaSalle F. Niziolek, Office of Nuclear Facility Safety - lDNS i