Commonweakh Edison Company LtNalle Grnerating Mation 2601 Nortli 21st Road Marseilles, 11,61311 9757 j
Tel H15-35-'4761 July 27,1998 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 I
Subject:
Completion of Commitments Made in Response to l
Generic Letter 95-07 LaSalle County Nuclear Power Station, Unit 1 Facility Operating License NPF-11 NRC Docket No. 50-373 l
References:
1.
NRC Generic Letter 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," dated August 17,1995 2.
Peter L. Piet (Comed) letter to the NRC Document Control Desk, " Commonwealth Edison Company (Comed) 180 day Response to NRC
/ p Generic Letter (GL), GL 95-07, ' Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves,' dated ff M{/r August 17,1995," dated February 13,1996 In response to the United States Nuclear Regulatory Commission (NRC)
Generic Letter 95-07 [ Reference (1)] Commonwealth Edison Company (Comed) committed, in part, to modify residual heat removal system service water heater exchanger outlet valves,1E12-F068A&B, for LaSalle County Nuclear Power Station (LaSalle), Unit 1, during the seventh refuel outage (L1R07) to prevent the valves from becoming pressure locked
[ Reference (2)].
Design Change Packages (DCPs) 9400399 and 9400400 were completed during L1R07 to modify valves 1E12-F068A&B to prevent pressure locking.
9807300300 980727
~
PDR ADOCK 05000373 P
PDR A !!nicom Company
j,. 4 e
If there are any questions or comments concerning this letter, please refer them to Harold D. Pontious, Jr., Regulatory Assurance Manager, (815) 357-6761, extension 2383.
Res
- ully, 1
Fred R. Dacimo Site Vice President LaSalle County Station cc:
C. A. Paperiello, Acting NRC Region ill Administrator M. P. Huber, NRC Senior Resident inspector - LaSalle D. M. Skay, Project Manager.- NRR - LaSalle F. Niziolek, Office of Nuclear Facility Safety - IDNS l