. Dyron Generating Station 4 450 North German Cimrch Road flyron lL 610lo9794 Tel 815-2%5 411 July 27,1998 LTR:
BYRON-98-5104 FILE:
3.11.0320 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
)
SUBJECT:
Comed Byron Unit 2 Cycle 7 Steam Generator Eddy Current Examination 90 Day Summary Report Byron Nuclear Power Station, Unit 2 Facility Operating License NPF-66 NRC Docket No. 50-455 Attached is a report for the Byron Unit 2 Steam Generator examination performed during the Cycle 7 refueling outage (B2R07). The eddy current inspectic,s and repairs were performed between April 15 and May 5,1998. This report is being submitted in compliance with the requirements ofIWA-6000 and Mandatory Appendix IV of Section XI of the ASME Boiler and Pressure Vessel Code,1983
. Edition through Summer 1983 Addenda in accordance with Byron Technical Specification 4.0.5. This report also being submitted for compliance with the steam generator reporting requirements of Byron Tecimical Specification 4.4.5.5.b.
If there are any questions regarding this matter, please contact this office.
Sincerely, Q&V K. L. Graesser Site Vice President Byron Nuclear Power Station Attachment J,.1,,u, I.
5 cc:
NRC Regional Administrator, RIII Senior Resident Inspector, Byron Office of Nuclear Safety,IDNS i
9007300182 980727 i
PDR ADOCK 05000455 i
G PM,
l A t r icom Company n
l
. _ _ _ _ _ _ _ _ - - - _ _ _ _