Staff Requirements Memo Re 871104 Briefing in Washington,Dc on Status,Results & Recommendations for Future Activities Concerning Isap.Staff Will Provide Integrated Package Outlining Listed Items for Commission Consideration
ML20236U112
Person / Time
Issue date: 11/30/1987
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
REF-10CFR9.7 NUDOCS 8712020290
Download: ML20236U112 (1)


Text

  1. pantog#' UNITED STATES

!b -

n NUCLEAR REGULATORY COMMISSION

{ W ASHIN GTON, D.C. 20555 November 30, 1987 OFFICE OF THE SECRETARY MEMORANDUM FOR: Victor Stello, Jr., Executive Director for Operations PROM: [f 5 el J. Chilk, Secretary

SUBJECT:

STAFF REQUIREMENTS - BRIEFING ON l INTEGRATED SAFETY ASSESSMENT PROGRAM l (ISAP), 2:30 P.M., WEDNESDAY, NOVEMBER 4, 1987, COMMISSIONERS' ,

CONFERENCE ROOM, DC OFFICE (OPEN TO l PUBLIC ATTENDANCE)

The Commission

  • was briefed by the staff on the status, results and recommendations for future activities relating to the Integrated Safety Assessment Pilot Program (ISAP).

The staff committed to provide for Commission consideration an j integrated package which outlinen the Individual Plant Examination Program (IPE), a proposed generic letter to reactor licensees describing IPE, a proposed option for industry to incorporate ISAP with IPE, and industry's reaction to ISAP.

(EDO) (SECY SUSPENSE: 2/26/88) l (Subsequent to the meeting, the Commission deferred action on i extending the ISAP concept beyond the pilot program (SECY-87-219). The staff should present the Commission with an options paper, either in conjunction with or before the proposed .

IPE generic letter, identifying the options considered by the staff in developing their recommendation contained in SECY-87-219 j and the major advantages and disadvantages of each option. The options presented for approval should include, as a minimum, the staff's proposal to incorporate ISAP as an option within IPE, and )

the option of retaining the pilot program without extension.

This completes Commission action on SECY-87-219).

cc: Chairman Zech Commissioner Roberts Commissioner Bernthal Commissioner Carr Commissioner Rogers OGC GPA PDR - Advance DCS - 016 Phillips

  • Commissioners Bernthal and Rogers were not present.