Updates Plant Emergency Operating Procedures Generation Package & Provides Addl Info as Committed in Util .Understands That Comparison of Cooldown Procedure Series of Procedures Not Required,Per 871019 Telcon.W/Encls
ML20236T956
Person / Time
Site: Rancho Seco
Issue date: 11/20/1987
From: Firlit J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Miraglia F
Office of Nuclear Reactor Regulation
Shared Package
ML20236T959 List:
References
AGM-NPP-87-401, NUDOCS 8712020191
Download: ML20236T956 (3)


Text

__ _ - _- _ _ _ . -

(f$SMUD SACRAMENTO MUNICIPAL UTIUTY DISTRICT O P. O. Box 15830, Sacramento CA 95852-1830,(916) 452-3211 l

AN ELECTRIC SYSTEM SERVING THE HEAHT OF CALIFORNIA NOV 2 01987 )

AGM/NPP 87-401 I

1 U. S. Nuclear Regulatory Commission i Attn: Frank J. Miraglia, Jr.

Associate Director for Projects' Phillips Building j 7920 Norfolk Avenue Bethesda, MD 20014 DOCKET NO. 50-312 RANCHO SECO NUCLEAR GENER/. TING STATION i j LICENSE NO. DPR-54 EMERGENCY OPERATING PROCEDURES (EOP) VS. 1ECHNICAL BASIS DOCUMENTS j RE: Letter from J.F. Firlit to G. Kalman, Emergency Operating Procedures, Dated November 16, 1987 l

Dear Mr. Miraglia:

l The purpose of this letter is to update the Rancho Seco E0P Procedures Generation Package (PGP) and to provide additional information as the District committed to in the referenced letter.

In the referenced letter the District committed to provide an evaluation to compare the Technical Bases Document (TBD) against the'EOPs. Two evaluations were performed in order to fulfill this commitment. Attachment 1 contains the evaluation performed by Babcock and Hilcox and the District's response to that evaluation. The District has also performed its own evaluation; the results are provided as Attachment 2. The referenced letter also committed to provide the updated Hriters Guide (AP 2.24) for the E0Ps reflecting the TBD as the basis for the development of the E0Ps (Attachment 3). The E0Ps which will be in place for startup will be supported by a revision to Attachment 2 as described in the Writers Guide. To complete the PGP update the current E0P Validation and Verification Procedures (AP 2.06 and AP 2.07) are provided in l

Attachment 4.

It is the District's understanding based on a telephone conversation on October 19 with NRR and Region V that a comparison of the Cooldown Procedure (CP) series of procedures is not required at this time.

r h

ay \

RANCHO SECO NUCLEAR GENERATING STATION O 14440 Twin Cities Road, Herald, CA 35638-9799;(209) 333-2935 L- A---________. ___w

t.

~ '

'F. J.'Miraglia- - 2'-

. NOV 2 0 1987 '

Please contact me'if 'youL have any qut.stions. Members of your staff.with-questions requiring a' dditional information or clarification:may contact Mr.

John Atwell at (209) 333-2935, extension 4917.

(

Sincerely, i }

Joseph F. Firlit Assistant General Manager, Nuclear Power Production l

Attachments cc w/atch:

l G. Kalman, NRC, Bethesda A. D'Angelo, NRC, Rancho Seco

'J. B.~ Martin, NRC, Region V l

'I l

3 i

'1 l

l i

)

ATTACHMENT 1 Review of Sacramento Municipal Utility District -1 Emergency Operating Procedures and Rancho Seco Response.to the B&W Report B