Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER)
MONTHYEARML20199J8551997-11-24024 November 1997 Special Rept 2-SR-97-001:on 971025,RCS Pressure Transient Resulted in Automatic Actuation of Pressurizer Porv.Caused by Operator Misconception Over Actual Arming Setpoint of LTOP Sys.Alarm Procedures Will Be Revised ML20083R7491995-05-22022 May 1995 Special Rept 1-SR-95-002:on 950505,lightning Strike Damaged Meteorological Instrumentation at Primary & Backup Towers ML20080G4721995-01-18018 January 1995 Ro:On 941223,invalid Failure Experienced on 2A DG During Normal Start of Engine to Support Transformer Maint Activities.Speed Module Which Initiates Various Control & Support Features as Function of Engine Speed Replaced ML20078A3221995-01-12012 January 1995 Special Rept:On 941222,unit 1 Train a EDG Tripped.Caused by Internal Oil Leak of Trip Device Bypassed in Emergency Operating Mode.Trip Device Replaced W/New,Calibr Pressure Switch ML20078L8961994-11-21021 November 1994 Ro:On 941101,DG 2A Invalid Failure Occurred.Problem Isolated to Failed 125 Volt Dc Relay on Instantaneous pre-position Circuit Board.Subj Circuit Board Will Be Replaced W/New Design During Next Unit 2 Refueling Outage ML20058C0011993-11-18018 November 1993 Ro:On 931117,unusual Event Declared Due to Loss of All Primary & Backup Meteorological Sys Instruments.Caused by Lightning Strike Damaging back-up Tower Instruments.Local Natl Weather Svc Contacted ML20114C1141992-08-19019 August 1992 Special Rept:On 920407,fuel Injection Pump in Right Cylinder 7 Seized,Preventing Injection of Fuel Into Associated Cylinder.Caused by Particulate Contamination.On 920320,noise Emanated from Right Cylinder 4 ML20101L2991992-06-29029 June 1992 Special Rept 1-SR-92-001-00:on 920528,engine Trip Occurred Due to Apparent High Vibration at Engine Rear Vibration Sensor.Caused by Low Lube Oil Pressure.Sensor & Related Components Replaced ML20101D2201992-06-0404 June 1992 Ro:On 920603,control Room Alarms Annunicated Loss of One of Two Compressors in Train a of Control Room HVAC Sys.Caused by Low Oil Pressure in Compressor.Both Trains of Control Room HVAC Sys Restored to Svc & Declared Operable ML20092F0281992-02-13013 February 1992 Special Rept 1-SR-90-002-01:on 900221,RCS Transient Resulted in Automatic Actuation of Porv.Caused by Insufficient Letdown Flow.Repetitive Step of Differing Plant Responses Expected Eliminated ML20086F9791991-11-22022 November 1991 Special Rept:On 910920,22,27,1001 & 02,invalid Failures of Diesel Generators 1A & 1B Occurred.Redundant Diesel Generator Operable During Each Event.Diesel Generator 1B Placed on Weekly Testing Frequency ML20079P5851991-10-0909 October 1991 Ro:On 910904,09 & 16,seismic Monitoring Instrumentation (Tape Decks 1 & 2 & Sensor 5) Inoperable for More than 30 Days.Playback Tape Deck & Sensor Repaired & Restored to Operable Status ML20062F8251990-11-20020 November 1990 Ro:On 901118,control Room Alarms Annunciated Failure of Inverter Associated W/One of Four 118-volt Ac Safeguards Instrument Buses.Caused by Failed Components within Scr/Diode Assembly ML20058C5131990-10-29029 October 1990 Special Rept SR-1-90-007-00:on 900726,charging Flow Diverted Through Safety Injection Line Due to Personnel Error. Operator Counseled.Procedures Reviewed for Accuracy ML20058A3681990-10-0101 October 1990 Deviation Investigation Rept 90-026-00:on 900815,EDG 2A Cylinder 10L Dislocated Pushrod Due to Collapsed Hydraulic Lifter ML20056A1691990-07-31031 July 1990 Ro:On 900730,ESFAS Occurred Which Resulted in Initiation of Safety Injection Followed by lo-lo Steam Generator Level Reactor Trip Signal.Caused by Potential Problem W/Emergency Lighting.Actions to Prevent Recurrence Will Be Determined ML20056A0821990-07-27027 July 1990 Ro:On 900726,ESF Actuation Signal Occurred Which Resulted in Initiation of Safety Injection.Cause Indeterminate.Plant Restored to Stable Condition ML20055G3461990-06-27027 June 1990 Ro:On 900412,engine Tripped Due to Spurious High Jacket Water Temp Trip Valve Actuation During Partial Surviellance to Verify Operability of Diesel Generator 2A.Nuclear Work Request Initiated to Repair or Replace Trip Valve ML20247C5601989-05-18018 May 1989 Special Rept:On 890224,during Local Leak Rate Surveillance Test,Overall Max Pathway Containment Leakage Failed to Meet Acceptance Criteria & Containment Isolation Valves Exhibited Excessive Leakage.Caused by Improper Valve Stroking ML20246P9061989-03-20020 March 1989 Ro:On 890214,nonvalid Test & Failure Experienced on 2B Diesel Generator.Caused by Nuclear Station Operator Inexperience & Procedural Discrepancy.Nuclear Station Operator Counseled & Procedure Change Initiated ML20236E1821989-03-10010 March 1989 Ro:On 890305,moderator Temp Coefficient Determined to Be More Positive than Allowed by Tech Spec 3.1.1.3.a & Limiting Condition for Operation Entered.Control Rods Maintained within New Withdrawal Limits Until Core Burnup Reached ML20195G5811988-06-13013 June 1988 Deviation Investigation Rept 88-076-00:on 880516,diesel Genrator 1B Uncontrollably Loaded During Monthly Operability Surveillance.Caused by 3IMX Relay Failure.Load Reduced W/ Governor Control Switch & Subj Relay Replaced ML20238D9711987-12-21021 December 1987 Ro:On 870925,during Monthly Operability Surveillance of Diesel Generator 1A,fuel Oil Leak Occurred at Connection of Fuel Pump W/Fuel Pump Discharge Line.Caused by Cracked Fitting at Cylinder Pump Discharge.Pump & Line Replaced ML20237C9051987-12-0303 December 1987 Ro:On 871105,diesel Generator 2A Inoperable for 22 H.Caused by Dirty Voltage Range & Adjustment Potentiometer (Pot) in Voltage Regulator.Pot Cleaned & Exercised Through Full Range ML20236F8351987-10-27027 October 1987 Ro:On 870814,governor Hunting Observed Following Diesel Generator Startup.Caused by Intermittent Operation of 4EX3 Relay.Diesel Generator 1B Will Remain on Monthly Testing Schedule Per Tech Spec 4.8.1.1.2 ML20236T9321987-10-27027 October 1987 Special Rept:On 870831,Train a Safety Injection Occurred During Performance of Bimonthly Surveillance of solid-state Protection Sys.Caused by Cognitive Personnel Error.Emergency Procedure 2BEP-0 Entered & Exited When Plant Stabilized ML20236Q1301987-10-19019 October 1987 Ro:On 870812,reactor Tripped Following Safety Injection & Main Steam Line Isolation During Power Ascension.Caused by Fully Open Governor Valve.Necessary Equipment auto-started/ Actuated Per Design ML20236E5011987-06-25025 June 1987 Ro:On 870318 & 0417,diesel Generator 1A Failed to Reach Rated Speed,Voltage & Frequency within Required Time Set by Tech Specs.Caused by Inadequate Prime in Fuel Oil Supply Line & Ruptured Diaphragm,Respectively ML20236B8871987-06-18018 June 1987 Ro:On 870428,valid Test & Failure on Diesel Generator 2B Occurred.Caused by Method Used for Determining Start Time. Diesel Generator Monthly Operability Surveillance Procedures Revised ML20207T2771987-03-0606 March 1987 Ro:On 870210,diesel Generator 1A Experienced Valid Test Failure.Caused by Failure of Check Valve to Supply Day Tank in Event That Check Valve Fails to Seat.Addl Soft Seat Check Valve Installed Between Engine & Supply Day Tank ML20212K9321987-02-27027 February 1987 Special Rept;On 870215,wide-range Noble Gas Monitor Taken Out of Svc for Mod to Demonstrate Capability to Test for Radioiodine,Per TMI Action Plan Item II.F.1.Mod Scheduled for Completion by mid-Mar 1987 ML20198S1011986-05-29029 May 1986 Special Rept:On 860505,diesel Generator 2A Declared Incapable Due to Contaminated Fuel & Broken Rocker Arms on Seven Left Cylinder.Caused by Bent Retaining Rings & Insufficient Generator Crosshead Procedure.Parts Replaced ML20195D1001986-05-19019 May 1986 Ro:On 860430,Unit 2 Diesel Generator 1B Required 12.5 to Reach Rated Conditions.Caused by Inadequate Prime in Fuel Oil Supply Line.Union Lightened ML20203F6021986-03-20020 March 1986 Special Rept:On 860223 & 0313,diesel Generator 1B Experienced Two Nonvalid Tests & Failures Due to Isochronous Relay Failure.Caused by Intermittent Continuity Between Contacts in Isochronous Relay While in Test Mode ML20203K9371986-03-11011 March 1986 Special Rept:On 860212 & 17,Cooper Bessemer Diesel Generator 2A Failures Occurred Due to Rocker Arm Failure.Caused by Liner Misalignment W/Subsequent Head Alignment.Heads Realigned or Replaced ML20135F8431985-09-0303 September 1985 Ro:On 850813,30- & 250-ft Wind Direction Recorders & 30-ft Air Temp Recorder in Main Control Room Reported Inoperable. Caused by Damaged Fuses in Communication Line Between Meteorological Tower & Control Room.Fuses Replaced ML20127J2541985-06-13013 June 1985 Ro:On 850527,control Room Indication of 30-ft Wind Speed Lost.Caused by Problems W/Communication Links Between Tower Instrumentation & Control Room Readouts.Work in Progress to Restore Operability ML20126M8411985-06-0303 June 1985 Correction to 850523 Special Rept:Second & Third Sentences of Second Paragraph Should Read ...On One of Sys Five Sensor Signal Cables.This Signal Cable Is for Free Field Sensor ML20127E1111985-05-23023 May 1985 Special Rept:On 850419,seismic Instrumentation Sys Began Alarming Continuously.Troubleshooting Indicated 120 Mv Peak to Peak 60 Cycle Signal on Sys Fire Sensor Signal Cables. Problem Under Investigation ML20107D5151985-02-0808 February 1985 Updated Special Rept Re Diesel Generator Failures. Reevaluation Reduced Failures of Diesel Generator 1A to One Common Failure,Decreasing Total to Two Failures Out of 58 Valid Tests ML20106A1761985-01-12012 January 1985 Special Rept:On 841228,suction Relief Valve 1RH8708A & on 841230,RHR Sys Lifted on High Pressure Transient During Restoration of Loop Following Performance of Surveillance Procedure Bvs 0.5-2.SI.3 ML20076K7771983-07-0808 July 1983 Ro:On 830630,during Insp of Spent Fuel Rack,Five Propane Gas Cylinders Found in Spent Fuel Pool Area.Caused by Personnel Error.Cylinders Will Be Stored Outside Fuel Handling Bldg.Signs Re Combustible Matl Will Be Posted 1997-11-24
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function 1999-09-30
[Table view] |