Ltr Contract NRC-04-83-168,Mod 18,revising Total Estimated Cost,Obligation of Funds & Limitations,To Integral Sys Test Program - Once-Through Integral Sys & Multiloop Integral Sys Test Components
ML20236T912
Person / Time
Issue date: 11/23/1987
From: Wiggins E
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To:
BABCOCK & WILCOX CO., ELECTRIC POWER RESEARCH INSTITUTE
Shared Package
ML20236T904 List:
References
CON-FIN-B-8909, CON-NRC-04-83-168, CON-NRC-4-83-168 NUDOCS 8712020165
Download: ML20236T912 (9)


Text

{{#Wiki_filter:l - A ~ - 4 "> ; '[go mec6 ,l 4 s fp. . lpNITEDST TES + a

, [.

sg. iNUCLEAR' REGULATORY COMM.lSSION. ~ ') 5 j. WASHINGTON, D. C. 20665 T,.....,/ Modification No. 18 Contract No. NRC-04-83-168 RP2399-1 CONTRACT AMONG THE BABCOCK & WILCOX COMPANY AND j ELECTRIC POWER RESEARCH INSTITUTE AND THE U.S. NUCLEAR REGULATORY COMMISSION THIS AGREEMENT, effective the 6th day of June 1983, as modified and superseded by this Modification No. 18,. effective. June 17, 1987, among the UNITED STATES OF AMERICA (hereinafter referred to as the " Government")., as represented by the UNITED STATES NUCLEAR REGULATORY COMMISSION (hereinafter referred to as the " Commission"), and THE BABCOCK & WILCOX COMPANY, a corporation duly organized and existing under the laws of the State of Delaware with a principal office in Alliance, Ohio (hereinafter referred to as the " Contractor"),. and ELECTRIC POWER. .) RESEARCH INSTITUTE, a not-for-profit corporation duly organized and existing under the laws of'the District of Columbia, with principal offices in the city of Palo Alto, California (hereinafter referred to as the " Institute"). WITNESSETH THAT: WHEREAS, this Agreement is authorized by l aw, including the Energy Reorganization Act of 1974, as amended, and Secti on 302 (c ) (10) of the Federal Property and Admi ni str ati ve Services Act of 1949, es amended, and the Atomic Energy Act of 1954, as amended. l WHEREAS, the Contractor has been performing work under Contract l No. NRC-04-83-168; WHEREAS, the part2es signatory to the Contract desire to modify Contract No. NRC-04-83-168 as. hereinafter provided, and this { supplemental agreement i s authori zed oy l aw, including the Federal Property and Administrative Services Act of 1949, as j amended, the Atomic Energy Act of 1954, as amended, and the j Energy Reorganization Act of 1974, as amraded; 1 i 8712020165 871005 I PDR CONTR .NRC-04-83-168 PDR i

s 1 j s i WHEREAS, the Commission, the Institute, the Contractor, and the Babcock & Wilcox Owners Group (hereinafter referred to as the " Owners"), have participated jointly in a research project enti tl ed " Integral System Test (IST) Program Once-Through j Integral System (OTIS) and Multiloop Integral System Test (MIST) Components," the total estimated cost of which is $31,588,706.00 through Phase III and $2,197,946.00 for Phase IV, and WHEREAS, the IST Program costs are to be jointly funded by the Commission, ] the Institute, the Contractor, and Owners Group, both through direct reimbursement of program costs and in-kind contributions composed of items such as fee waiver, provision of building, facilities, and equipment by the Contractor, and provision of the GERDA data and IST benchmark analysis by the Owners. j The di vision of Phases I through III IST Program cost of $31,588,706.00 is as follows: Commission M Institute M. Owners EMEBZ (Representing in-kind contributions ano cash contributions) Contractor 5EE3% (Representing in-kind contributions and fee waiver, cash contribution); and The di vision of Phase IV, IST Program cost of $2,472,929.00 g i s as f oll ows. J Commission M% Institute M% Owners W% Contractor M% (Representing in-hind contributions, fee wai ver ) WHEREAS, this supplemental agreement reflects the agreements of the parties regarding the addition of Phase IV to the IST Program: l NOW, THEREFORE, the parties agree to revise the Contract as follows: ARTICLE III - TOTAL EDTIMATED COST, OBLIGATION OF FUNDS AND LIMITATIONS, Paragraph C. Limitations, Subparagraph 2.b, is revised to read as follows: 2

a: Is i h Cgst ggettg1 Eggse, Iggts gt Cgettg1 G gue t Gtgun Sup_ tasks ggst getting A PHASE I TOTAL $139W1895 B PHASE II TOTAL 489 313 p l PHASE III PROGRAM t y C 1.0 Program Management 1., $61.36Z5 i D Facilities 83d141} 2.1 Building Modifications 2.2 Control Room Enclosure ( E Reactor Coolatat! System 1 3Z33999 / W 3 Pumps 2.3 Reactor Coolant Pumps / F Reactor Coolant System 39220;Jf 2 3 Components \\ 2.3 Balance of Loop Components c,. G Balance of RCS l'GJ,9Z2 2.4 New Steam Generator g and EnSanced Hot Leg 2.5 Secondary Loop 524 244 H Au>:i 1 i ary Equi pment 1 2.6 Au>:i l i ar y Plant )] ~ Equipment ,'j' '2. 7 Au>: i l l ar y Te>: t Equipment \\ ~ 3,3;22,599, I DAS, Electrical and Hydra 3 2.8 Data Acquisition +. ~ System Hardware and 4

  1. 6 Software 2.9 General Electrical and Supervision 2.10 Loop Hydro and g

i I nsul at i cin 4 \\ l J J l 1. l.\\ ?, 'o pl. a p i O L-

-{ i r ~ ,m { 1 J Advanced Instrumentation, 312,633 Guard Heater Power,,heasure-ment and Guard Heater Trip ) i 2.11 Gamma Densitometers j 2.12 RCP Characterization l Instrumentation i l 2.13 Guard Heater Power (' / Measurement 2.14 DELETED IN. ENTIRETY 2.15 Leak Odality /'1easurement ( e K 3.0 Design Ver'i43 cation 232,926 L 4.0 Test Planning, Z12,938 ] 1 M 5.0 Testing 2 644 412 1 2 1 N 6.O Data /.nalysis 132Z5 QO4 1 7.0 Reporting 312,3Zg O P 8.O Faci 1ity Hold f y@J1Z ?* 9.0 PMG Designated Tank 56 645 'O 3 Of the total amount 4 ' r,r ovi/Jed under Cost ' Control. Group O, $333 370K l was ori gi nall y reset vi.>d for unanti cipated probi A.mk, asnaci ated l i / with the shakedogr0 botdor testing i phases of Cost,, Con t r ol Group t M. / R 10.0 Underrun Hol ds,g Account 121 3145 ] ) s ,k^ 4 l \\ / f' PHTEK I I I TOTAL, 18 959,558 1 l, i s a 5 l s} /: f .a i / l.. / ) s' I Y h 1. (*

/ ,[ 4 r r ~ d i PffASE IV PROGRAM j l S Phase IV Program Management 4Z2 Q6] 3 1.0 _ Program hanagement l l' Facil2.t.y Modifications 263311Z I 2.1 Cold Leg Venturi Flowmeters l 1 2.2 Lew Pressure Injection 2.3 F.eactor Coolant Pump Seal j Leak Sites 24 Increased Break Capacity l 2.5 Main Feedw'ater l 2.6 Loop Hydro ) U Test Planning and Testing Z49 Q@@ 3 3.1 Test Specification 3.2 Test Plans and Procedures 4.1 Tests Requiring Minor (or no) l Facility Modifications 4.2 Debug ] 4.3 Characterization J 4.4 Test Requiring Facility p Modifications V Data Analysis $2Z,}61 5.1 Data Int erpr et ati on and Analysin 5.2 Data Ver i f i cation W Reporting 16@343Z 6.1 Facility Specification Update 6.2 Data Qualification Report 6.3 Immediate Reports 6,4 Final Report X PMG Designated Task (Phase IV) 166 @SO 3 7.1 PMG Reserve ($75,940) 7.2 Testing - Unplanned Activities ($90,940) m. .A A m

.{ si w, 't.

  • e Y

Phase IV Underrun Account g PHASE IV TOTAL 12 12Z1246 1 IST PROGRAM TOTAL 12138}21622 -l IN WITNESS WHEREO the parties have executed this supplemental j agreement. l 1 l l U.S. NUCLEAR REGULATORY COMMISSION i By__ d2 h_ __ //If)J'7 Contracting h_ /d e cer Contract Administration Branch ELECTRIC POWER RESEARCH INSTITUTE EIVcTTBG -- //[/6 7 ) By: T date M' Senior Contract Hegotiat_ I I l THE BABCOCI' & ILP X COMPANY DY ; --.-- - -.Jdt.. --- -- _- !.$.El ' ds te l l 6 l L____________________________________

-c. . q-w, ,.s j; s. ,,s ,y, ,,,e g .. s ?,' = + v 9 'n = .m Contract-po. NRC-04-83-168 Modification No. 18 Attachment No. 1 Page 1 of 3 DETAILED ACCOUNTING OF MOVEMENT OF FUNDING f i BETWEEN COST CONTROL GROUPS 1. CCG A is decreased by $5,000 from'$1,097,805 to $1,092,805. The $5,000 is moved to CCG R pursuant to PMG approval at PMG Meeting No. 15.- 2. CCG E is decreased by $13,000'from $1,387,000 to $1,374,000. The $13,000 is moved to CCG' R pursuant,to PMG approval at PNG l Meeting No. 15. 3. CCG F is decreased by $24,000 from $3,096,855 to $3,072sB55. l The $24,000 is moved to CCG R pursuant to PMG approval at PMG Meeting No. 15. 1 4. CCG G is decreased by $31,000 from $984,979 to $953,979. The j $31,000 is moved to CCG R pursuant to PNG approval at PMG j Meeting No. 15. l h 5. CCG I is increased by $9,000 from $3,593,599 to $3,602,599. The $9,000 i s taken from CCG R.to cover unanticipated costs in May-June, 1986. This action is pursuant to PMG approval at PMG Meeting No. 15. j l 6. CCG J is decreased by $7,000 from $319,633 to $312,633. The T7,000 i s moved to CCG R pursuant.to PMG - approval at PMG Meeti ng No. 15. 7. CCG K is decreased by $2,000 from $252,036 to $250,036. The $2,000 i s moved to CCG R pursuant to PMG approval at PMG Meeting No. 15. i 8. CCG M is increased by $75,601 from $2,568,811 to $2,644,412. l The $75,601 is provided by changes to the following CCG's: a. CCG O Install Densitometers (PMG-673, PNG-689) (+$18,100) b. CCG D Core Power Noise (PMG-681, PNG?68Y) (+ $1,519) c. CCG N 3 Additional Tests (PMG-358) (-$30,000) d. CCG Q Gold /Derylium Thimble Insp.(PMG-711) (+$20,000) e. CCG O Removal of Densitometer Spools (PMG-722) (+ $4,982) f. CCG O Phase II Turbine Test (PMG Mtg. ?6) (+$44,454& g. CCG R Phase II Turbine Test (PMG Mtg. 16) (+$16,546) __m.. _______.____.-____.m__.______m-__m.___m___J

I i c. -c e r \\ ,e NRC-04-83-168 Modification No. 18 Attachment No. 1 Page 2 of 3 9. CCG N is increased by $87,517 f rom $1,187,487 to $1,275,004. The $87,517 is provided by changes to the following CCG's: a. CCG Q Vax Operating system Update (PMG-669) (+ $4,617) b. CCG Q DA Audit of Deferred Tests (PMG-673 &689)(+ $4,900) c. CCG M 3 Additional Tests (PMG 538) (+$30,000) d. CCG R Data Analysis (PMG Mtg. 15) (+$23,940) e. CCG R Reprocess Eng. Data Tapes (PMG-699 & 704) (+$14,060) f. CCG R Semiscale Pump Model PerfCal.(PMG Mtg 16) (+$10,000) l

10. CCG O is increased by $46,120 from $266,353 to $312,473.

The I $46,120 is taken from CCG R pursuant to PMG approval at PNG Meeting No. 15 for completion of the final report.

11. CCG P is increased by $11,310 from $39,007 to $50,317.

The $11,310 is taken from CCG G pursuant to PMG-677 and PMG-689 to rebuild the spare feedwater pump. I

12. CCG Q is decreased by $109,782 from $166,527 to $56,645.

The $109,782 is moved to the following CCG's: L. a. CCG N Vax Operating System Update (PMG-669) (- $4,617) b. CCG M Install Densitometers (PMG-673 & PMG-689) (-$18,100) c. CCG N GA Audit Deferred Tests (PMG-673 & 689) (- $4,900) d. CCG P Rebuild Spare Feedwater Pump (PMG 677 & 689) (-$11,310) e. CCG M Core Power Noise (PMG 681 & 639) (- $1,519) f. CCG M Gold /Derylium Thimble Insp. (PMG-711) (-$20,000) g. CCG M Removal of Densi tameter Spools (PMG-722) (- $4,982) h. CCG M Phase II Turbine Test (PMG Mtg. 16) (-$44,454)

13. CCG R is decreased by $37,666 from ;t 1 5 8, 8 1 1 to $121,145 by changes to the f ol l owing CCG 's:

a. CCG A PMG MEETING No. 15 (+ $5,000) b. CCG E (+$13,000) c. CCG F (+$24,000) d. CCG G (+$31,000) (4 $7,000) e. CCG J f. CCG K (+ $2,000) g. CCG I (- $9,000) h. CCG O (-$46,120) 1. CCG N (-$23,940)

j. CCG N Reprocess Eng. Data Tapes (PMG 699 L 704)

(-$14,060) L:. CCG M Phase II Turbine Test (PMG Mtg.16) (-$16,546) 1. CCG N Semiscale Pump Mode Perf. Cal (PMG Mtg 16) (-310,000)

4 '? .v ,.s. .e e l i NRC-04-83-168 l Modification No. 18 Attachment No. 1 1 Page 3 of 3 1

14. CCG U is increased by $15,000 from $734,588 to $749,588.

The $15,000 is taken from CCG X fro repeat of the Rancho Seco Test per PNG 4-12 & PMG Mtg. No. 16. i

15. CCG X is decreased by $15,000 from $181,880 to $166,880.

The $15,000 is moved to CCG U for repeat of Rancho Seco Test per PMG 4-12 and PMG Mtg. No. 16. ) i l 9 l l l l l I 1 l l}}