Text
. . . . . . ,, , . . . . . .. . - 4 1
00T 2 71987' WM f cord fi.!e WM F cgg_
WM-68/JPG/CONV _
DxM Na .. >
FIR.[ i
- LPJR . i Ddribu'.:nm 1
~~
i CONVERSATION RECORD
~ ' ~ ~ ~ ~
TIME: 3:00 p.m. #bG). ' ~~
4 /-
DATE: October 23, 1987 VISIT CONFERENCE TELEPHONE X .. INCOMING X OUTGOING NAME OF PERSON (S) CONTACTED OR IN CONTACT WITH YOU: R. Rager j
.1' i 0 ORGANIZATION: DOE / TAC TELEPHONE NO: FTS 846-1329' l
SUBJECT:
Green River phase II' Preliminary Design BACKGROUND: Excavation.is planned to descend to elevation 4,110-4,115 feet.
Current data, presented at the September 15 on-board review meeting . .
indicate such an excavation will result in' near total removal' of the Dakota Sandstone, and placement of tailings atop the Cedar Mountain-Formation. I
SUMMARY
- Mr. Rager acknowledged that the design document, stating that excavation would not encounter the Cedar Mountain, and that the unit would not form the tailings foundation, was in error. This item should be disregarded. The design document will be appropriately revised.
ACTION REQUIRED: Staff will address this issue in a connent on the document.
PERSON DOCUMENTING CONVERSATION: Joel Grimm, LLWM ACTION TAKEN: Issue raised in draft comment submitted to Siting Section coordinator (LLTB) 10/27/87.
97 ???f 1 Grimm, Geologist Siting Section Technical Branch, LLWM l DISTRIBUTION SBilhorn ;
l MYoung ;
I *EgBJagannath l l ;tWM,68;rf ]
JStarmer
~
l 8712010370 871027 '
. DR i l
l I. !
C 4