Forwards Revised EPIPs Including Rev 12 to EPIP 5.7.2, Shift Supervisor EPIP, Rev 26 to EPIP 5.7.6, Notification & Rev 22 to EPIP 5.7.17, Dose Assessment
ML20236T571
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/22/1998
From: Tony Brown
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20236T572 List:
References
NLS980123, NUDOCS 9807280266
Download: ML20236T571 (2)


Text

_-_ _ _ - - - _ _ _ _ _ _ _ _ - _ - - - - _ - - -.

P.O. BOX B ILL NEB A 68321 Nebraska Public Power District

=m3=="

m NLS980123 July 22,1998 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 I

Gentlemen:

Subject:

Emergency Plan Implementing Procedures Cooper Nuclear Station, NRC Docket 50-298, DPR-46 Pursuant to the requirements of 10 CFR 50, Appendix E, Section V," Implementing Procedures,"

Nebraska Public Power District is transmitting the following Emergency Plan Implementing l

Procedures (EPIPs):

EPIP 5.7.2 Revision 12

" Shift Supervisor EPIP" EPIP 5.7.6 Revision 26

" Notification" EPIP 5.7.17 Revision 22

" Dose Assessment" Should you have any questions concerning this matter, please contact me.

Since L

T. J. Brown j

Emergency Preparedness Manager 7-h06 l

/nr Enclosures cc:

Regional Administrator w/ enclosures (2)

USNRC - Region IV Senior Resident Inspector w/ enclosures USNRC NPG Distribution w/o enclosures 9907200266 900722 PDR ADOCK 05000298:

F P DR ;.,

' PowerfulPrideinnebybsk6N f L kL f R

= = = = - - = -

=

==

====-n=======.e====---

t s

i j

o l

l ATTACHMENT 3 LIST OF NRC COMMITMENTS l

I Correspondence No: NLS980123 1

The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or l

planned actions by the District.

They are described to the NRC for the NRC's

) information and are not regulatory commitments.

Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None 1

1 1

l l

f L

l PROCEDURE NUMBER 0.42 l

REVISION NUMBER 6 l

PAGE 9 OF 13 l