ML20236T505
| ML20236T505 | |
| Person / Time | |
|---|---|
| Issue date: | 10/27/1987 |
| From: | Lohaus P NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | James Anderson ENERGY, DEPT. OF |
| References | |
| REF-WM-39 NUDOCS 8712010319 | |
| Download: ML20236T505 (2) | |
Text
_. _ _ _
6 WM-39/DMS/87/10/20
' W 2 ? 1987 7<
,3 e,...
James R. Anderson, Project Manager
~ ~ ~ ~
Uranium Mill Tailings Project Office Department of Energy 1"
~
i Albuquerque Operations Office
'~
P.O. Box 5400 U
Albuquerque, New Mexico 87115
~~
i
Dear Mr. Anderson:
'O In response to your request for NRC input to the UMTRA Project Annual Status j
i Report, I am transmitting a brief description of NRC activities. completed in the UMTRA project for the period of October 1,1986 through September 30, 1987, 1
Should you have any questions regarding this transmittal, please contact Dennis Sollenberger of my staff.
)
Sincerely, Paul H. Lohaus, Acting Chief Operations Branch Division of Low-Level Waste Management and Decommissioning
Enclosure:
)
As stated cc:
R.D. Smith, URF0 i
B. Mitchell, JEG l
G. Falance, UMTRA DI5TRIBUTION:
s LLWM s/f NMSS r/f LLOB r/f DSollenberger, LLOB MFliegel, LLOB PLohaus, LLOB JSurmeier, LLTB MKearney, LLRB JGreeves, LLWM M Kna pp, L LWM,,,,,,
R.D. Smith, URF0 GGnugnoli, LLOB if d.
r
.___..___[
..l..b
_f
______...[__..__..
NAME:DSol Tengerber/dfw:MFliegel
- PLohaus b hE$bhfkbh bh/kb k bh/5b k :
OFFICIAL RECORD COPY 8712010319 871027 PDR WASTE WM-39 PDR
1 WM-39/DMS/87/10/20 Nuclear Regulatory Commission (NRC) - NRC reviewed and commented on i
modifications to cooperative agreements with North Dakota, Colorado, Wyoming, Pennsylvania, and Texas. CADSAR and NEPA documents reviewed by NRC included those for Green River, Spook, Falls City, Slick Rock, Lowman, Belfield/ Bowman,
. Tuba City, Grand Junction, Rifle, and Riverton.
Remedial action plans and modifications reviewed by NRC in FY 1987 included those for Salt Lake City, Shiprock, Tuba City, Green River, Riverton, Slick Rock, Mexican Hat, Ambrosia Lake, and Rifle. Conditional concurrences in selection of remedial action were provided for the Durango and Riverton sites. The draf t Shiprock and final Canonsburg certifications of remedial action completion were reviewed and-commented on by NRC.
Construction design reviews and site inspections have included Canonsburg, Lakeview, Shiprock, Salt Lake City, Tuba City, Grand Junction, Riverton, Rifle, and the Burrell, Pa. vicinity property.
Generic efforts have included revisions of the Memorandum of Understanding, j
investigation of an infiltration model to be used in the UMTRA project, evaluation of codisposal of Title I and Title II materials, and revision of the l
soil cleanup verification methods. NRC also reviewed DOE generic documents.
such as the Environmental Health and Safety Plan and the Vicinity Property l
Management and Implementation Manual.
i NRC has also continued to review the VP REA's where DOE has proposed to use supplemental standards. NRC concurred in the use of supplemental standards at j
VP's associated with the Lakeview, Riverton, Durango, Salt Lake City, and Canonsburg sites.
1 l
1 l
l 1
--.-__.__.__2___._